HousePrecheckCheck an address

292A Bremner BlvdToronto · zoning, lot size and permit records

Also 290 Bremner Blvd

≈ 41.9 × 25.8 m632 m²on Bremner Blvd

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 25 255772 (Proposal for interior alterations to level 5 staff lounge, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 71 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N10 m
≈ 41.9 m frontage≈ 25.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 186977 (Head-end replacement of all fire alarm nodes and devices throughout the building. - CN..., 2024, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 255772 (Proposal for interior alterations to level 5 staff lounge, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit25 255772Inspection

    Proposal for interior alterations to level 5 staff lounge.

    Dec 22, 2025 · 292 A BREMNER BLVD
  • Building permit24 186977Inspection

    Head-end replacement of all fire alarm nodes and devices throughout the building. - CN Tower

    Aug 19, 2024 · 292 A BREMNER BLVD
  • Building permit21 153527Closed

    Proposal to erect and display a non-illuminated wall sign, displaying static copy at the 1st floor (applicant to confirm) on the southwest elevation.***LA TOUR CN TOWER***

    Jan 13, 2022 · 292 A BREMNER BLVD
  • Zoning review21 230406 ZPRClosed
    Oct 25, 2021 · 292 A BREMNER BLVD
  • Development application09 189702 STE 20 OZClosed

    OPA AND REZONING for CN Tower lands re development - for new entertainment complex containing 3 storey Ripleys Aquarium and 3 storey retail restaurant commercial building - to be constructed in three phases.

    Nov 19, 2009 · 280 BREMNER BLVD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
632 m²
Frontage
41.9 mestimated, irregular lot
Depth
25.8 mestimated, irregular lot
Street
Bremner Blvd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%3 of 3 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    4

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).

      350 QUEENS QUAY W · Jun 17, 2026 · 398 m away
    • Minor varianceApproved

      To alter the development standards, as approved under Site Specific Zoning By-law 135-2026 (OLT), for the 60-storey mixed-use building by converting the office spaces into residential units from floors 3 to 7, and to increase the number of storeys to 65-storeys; the building height from 202.5 m to 214 m (including the mechanical penthouse); and the maximum gross floor area. This is currently under the review of Site Plan Control (File No. 20 233433 STE 10 SA). There will be a total of 807 residential dwelling units on this lot.

      277 WELLINGTON ST W · Apr 15, 2026 · 474 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.

      200 QUEENS QUAY W · Nov 12, 2025 · 438 m away
    • Minor varianceApproved

      To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.

      350 QUEENS QUAY W · Apr 9, 2025 · 398 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1027-2014) for the 54-storey office building by enclosing the existing ground floor outdoor patio for a new ground floor eating establishment.

      156 FRONT ST W · Mar 19, 2025 · 422 m away

    Latest activity nearby

    • Building permit

      Proposal to undertake interior alterations to convert existing office space into a lounge area.

      250 FRONT ST W · Nov 17, 2026 · 294 m away
    • Building permit

      Rev 01 - Renovation of existing club/suite spaces at level 400 - Phase 5Proposed renovation of existing club/suite spaces at level 400.

      1 BLUE JAYS WAY · Nov 12, 2026 · 208 m away
    • Building permit

      Proposal for existing offices to be converted into office and broadcasting studios.

      250 FRONT ST W · Nov 5, 2026 · 294 m away
    • Building permit

      REV 01: Revision to permit to update exit stair configurationProposal for removal of three later exterior walls and installation of new curtain wall systems to match and align with adjacent existing curtain wall assemblies.

      255 BREMNER BLVD · Nov 2, 2026 · 118 m away
    • Zoning review

      Closed

      255 FRONT ST W · Sep 23, 2026 · 245 m away
    • Building permit

      Proposed new mag lock installation on level 4

      250 FRONT ST W · Sep 21, 2026 · 294 m away
    • Zoning review

      Notice Sent

      75 LOWER SIMCOE ST · Aug 27, 2026 · 270 m away
    • Building permit

      Installation and removal of temporary stage, platforms, ramps and associated event structures for the concert at Rogers Center

      1 BLUE JAYS WAY · Aug 27, 2026 · 208 m away
    • Building permit

      Temporary installation of a G2 concert stage, including trusses, rigging, and associated event support structures within Rogers Centre for the Zach Bryan concert. All temporary structures will be dismantled and removed following the event, with no permanent alterations to the existing building. Build date: Sept 17, 2026; Dismantle date: Sept 20, 2026

      1 BLUE JAYS WAY · Aug 20, 2026 · 208 m away
    • Building permit

      Temporary installation of concert stage, truss, rigging and related event structures. Structural review of the stage engineer, ground pressures and existing floor to verify capacity for temporary event loads. All temporary structures will be removed following the event, with no permanent modifications to the building. Build date: August 17, 2026; Dismantle date: August 24, 2026

      1 BLUE JAYS WAY · Aug 19, 2026 · 208 m away

    Neighbourhood: Harbourfront-CityPlace

    About the area around the lot, not the lot itself.

    Nearest station
    St. Andrew Station10 min walk
    Nearest TTC stop
    Queens Quay West at Rees St West Side6 min walk
    Nearest cycling route
    Lower Simcoe StCycle Track, 4 min walk
    Nearest traffic count
    7,504 vehicles in 8 hBremner Blvd / Rees St, 130 m away, May 20, 2014
    Serious collisions within 500 m
    92021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 3 with cyclists
    Parks
    Bobbie Rosenfeld Park1 min walk
    Roundhouse Park1 min walk
    Olympic Park2 min walk

    Schools within 1 km

    • JEAN LUMB PUBLIC SCHOOL English Public 11 min walk
    • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHarbourfront-CityPlaceMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home40%54%
    Population (2021)28,13516,813
    Homes built in 1960 or before0%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHarbourfront-CityPlaceCity median
    Assault883.3636.3
    Robbery48.169.5
    Homicide2.85.3
    Shootings8.510.5
    Auto theft56.6192.6
    Theft over $5,00056.646.1
    Break and enter141.6172.8
    Theft from vehicles121.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.