Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2024
Needs a closer lookStill open in the City's records: 24 186977 (Head-end replacement of all fire alarm nodes and devices throughout the building. - CN..., 2024, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 25 255772 (Proposal for interior alterations to level 5 staff lounge, 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
5 records on file: more than at 93% of Toronto houses (median 0).
- Building permit25 255772Inspection
Proposal for interior alterations to level 5 staff lounge.
Dec 22, 2025 · 292 A BREMNER BLVD - Building permit24 186977Inspection
Head-end replacement of all fire alarm nodes and devices throughout the building. - CN Tower
Aug 19, 2024 · 292 A BREMNER BLVD - Building permit21 153527Closed
Proposal to erect and display a non-illuminated wall sign, displaying static copy at the 1st floor (applicant to confirm) on the southwest elevation.***LA TOUR CN TOWER***
Jan 13, 2022 · 292 A BREMNER BLVD - Zoning review21 230406 ZPRClosedOct 25, 2021 · 292 A BREMNER BLVD
- Development application09 189702 STE 20 OZClosed
OPA AND REZONING for CN Tower lands re development - for new entertainment complex containing 3 storey Ripleys Aquarium and 3 storey retail restaurant commercial building - to be constructed in three phases.
Nov 19, 2009 · 280 BREMNER BLVD
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 632 m²
- Frontage
- 41.9 mestimated, irregular lot
- Depth
- 25.8 mestimated, irregular lot
- Street
- Bremner Blvd
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
Around this lot
- Minor variances approved
- 100%3 of 3 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).
350 QUEENS QUAY W · Jun 17, 2026 · 398 m away - Minor varianceApproved
To alter the development standards, as approved under Site Specific Zoning By-law 135-2026 (OLT), for the 60-storey mixed-use building by converting the office spaces into residential units from floors 3 to 7, and to increase the number of storeys to 65-storeys; the building height from 202.5 m to 214 m (including the mechanical penthouse); and the maximum gross floor area. This is currently under the review of Site Plan Control (File No. 20 233433 STE 10 SA). There will be a total of 807 residential dwelling units on this lot.
277 WELLINGTON ST W · Apr 15, 2026 · 474 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.
200 QUEENS QUAY W · Nov 12, 2025 · 438 m away - Minor varianceApproved
To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.
350 QUEENS QUAY W · Apr 9, 2025 · 398 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1027-2014) for the 54-storey office building by enclosing the existing ground floor outdoor patio for a new ground floor eating establishment.
156 FRONT ST W · Mar 19, 2025 · 422 m away
Latest activity nearby
- Building permit
Proposal to undertake interior alterations to convert existing office space into a lounge area.
250 FRONT ST W · Nov 17, 2026 · 294 m away - Building permit
Rev 01 - Renovation of existing club/suite spaces at level 400 - Phase 5Proposed renovation of existing club/suite spaces at level 400.
1 BLUE JAYS WAY · Nov 12, 2026 · 208 m away - Building permit
Proposal for existing offices to be converted into office and broadcasting studios.
250 FRONT ST W · Nov 5, 2026 · 294 m away - Building permit
REV 01: Revision to permit to update exit stair configurationProposal for removal of three later exterior walls and installation of new curtain wall systems to match and align with adjacent existing curtain wall assemblies.
255 BREMNER BLVD · Nov 2, 2026 · 118 m away - Zoning review
Closed
255 FRONT ST W · Sep 23, 2026 · 245 m away - Building permit
Proposed new mag lock installation on level 4
250 FRONT ST W · Sep 21, 2026 · 294 m away - Zoning review
Notice Sent
75 LOWER SIMCOE ST · Aug 27, 2026 · 270 m away - Building permit
Installation and removal of temporary stage, platforms, ramps and associated event structures for the concert at Rogers Center
1 BLUE JAYS WAY · Aug 27, 2026 · 208 m away - Building permit
Temporary installation of a G2 concert stage, including trusses, rigging, and associated event support structures within Rogers Centre for the Zach Bryan concert. All temporary structures will be dismantled and removed following the event, with no permanent alterations to the existing building. Build date: Sept 17, 2026; Dismantle date: Sept 20, 2026
1 BLUE JAYS WAY · Aug 20, 2026 · 208 m away - Building permit
Temporary installation of concert stage, truss, rigging and related event structures. Structural review of the stage engineer, ground pressures and existing floor to verify capacity for temporary event loads. All temporary structures will be removed following the event, with no permanent modifications to the building. Build date: August 17, 2026; Dismantle date: August 24, 2026
1 BLUE JAYS WAY · Aug 19, 2026 · 208 m away
Neighbourhood: Harbourfront-CityPlace
About the area around the lot, not the lot itself.
- Nearest station
- St. Andrew Station10 min walk
- Nearest TTC stop
- Queens Quay West at Rees St West Side6 min walk
- Nearest cycling route
- Lower Simcoe StCycle Track, 4 min walk
- Nearest traffic count
- 7,504 vehicles in 8 hBremner Blvd / Rees St, 130 m away, May 20, 2014
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 3 with cyclists
- Parks
- Bobbie Rosenfeld Park1 min walk
- Roundhouse Park1 min walk
- Olympic Park2 min walk
Schools within 1 km
- JEAN LUMB PUBLIC SCHOOL English Public 11 min walk
- BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 11 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Harbourfront-CityPlace | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $90,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 28,135 | 16,813 |
| Homes built in 1960 or before | 0% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Harbourfront-CityPlace | City median |
|---|---|---|
| Assault | 883.3 | 636.3 |
| Robbery | 48.1 | 69.5 |
| Homicide | 2.8 | 5.3 |
| Shootings | 8.5 | 10.5 |
| Auto theft | 56.6 | 192.6 |
| Theft over $5,000 | 56.6 | 46.1 |
| Break and enter | 141.6 | 172.8 |
| Theft from vehicles | 121.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.