HousePrecheckCheck an address

291 Dundas St WToronto · zoning, lot size and permit records

Also 115 McCaul St, 295 Dundas St W

Commercial residential · CR 2.5 (c2.0; r2.0) SS2 (x2485)18.8 × 32.8 m591 m²on Dundas St Wcorner, also on McCaul St

Not a home

Ocad University - Rosalie Sharp Pavilion

The City's school locations place Ocad University - Rosalie Sharp Pavilion on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 18 173082 (Installation of (1) electromagnetic locking device on level 3, 2018, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 64 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: St PatrickThe City plans more homes around the station: good for transit, and more building over time.
N10 m
18.8 m frontage32.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2018

    Needs a closer look

    Still open in the City's records: 18 173082 (Installation of (1) electromagnetic locking device on level 3, 2018, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0710/16TEY (To convert the existing 2½-storey OCAD University administrative building into a studen..., 2016); A1101/14TEY (To alter the existing three-storey university administrative office building by constru..., 2015); A535/01TO (This application also includes No. 115 McCaul Street. The proposal is to enclose the en..., 2001).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 64 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

28 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 146432 GRA 00 IVClosed

    Notice Issued Graffiti

    Apr 19, 2026 · 291 DUNDAS ST W
  • By-law investigation26 146428 GRA 00 IRClosed

    Graffiti

    Apr 19, 2026 · 291 DUNDAS ST W
  • Building permit21 115812Closed

    Interior alterations to the 2nd floor MCD200, including new finishes, electrical upgrades, new mechanical heat pump.

    Mar 12, 2021 · 291 DUNDAS ST W
  • Building permit18 237808Closed

    In conjunction with a three storey building on the premises, proposal to erect and display two non-illuminated wall signs, displaying static copy, located on the second storey of the north and west elevations. The proposed sign on the west elevation is 1.0 metres vertically by 5.67 metres horizontally at a height of 4.45 metres. The proposed sign on the north elevation is 1.0 metres vertically by 5.77 metres horizontally at a height of 4.45 metres above grade.**OCAD**

    Dec 5, 2018 · 291 DUNDAS ST W
  • Building permit16 264229Closed

    Revision #01 - Addition of exterior aluminium scrim and supports, interior modifications.Second phase of alterations to the 3 storey OCAD University student centre (see permit #16 134117 BA) with associated studios, office spaces and gathering spaces. The facade along Dundas Street and McCaul Street will also altered.

    Jul 20, 2018 · 291 DUNDAS ST W
  • Building permit18 173082Permit Issued

    Installation of (1) electromagnetic locking device on level 3

    Jun 12, 2018 · 291 DUNDAS ST W
  • Minor varianceA0710/16TEYApproved

    To convert the existing 2½-storey OCAD University administrative building into a student centre with associated studios, office spaces and gathering spaces. The facade along Dundas Street and McCaul Street will be altered.

    Oct 25, 2016 · 291 DUNDAS ST W
  • Building permit16 134117Closed

    Proposal for interior alterations to the 1st, 2nd and 3rd floors to convert the existing administrative offices into student studio space for OCAD University.

    Jun 15, 2016 · 291 DUNDAS ST W
Show 20 older records
  • Minor varianceA1101/14TEYPending

    To alter the existing three-storey university administrative office building by constructing a front one-storey addition, a 3½-storey façade screening on the north, west, and south sides of the building, and to convert the office space into student spaces for the purpose of studios, offices and gathering spaces.

    Jan 28, 2015 · 291 DUNDAS ST W
  • Zoning review14 206795 ZZCNotice Sent
    Aug 14, 2014 · 291 DUNDAS ST W
  • Building permit12 204503Closed

    To erect and display three illuminated wall signs on the south-westerly elevation of building, in conjunction with a new fast-food restaurant. **McDonalds**

    Jul 4, 2012 · 291 DUNDAS ST W
  • Zoning review11 277265 ZBACancelled
    Sep 19, 2011 · 291 DUNDAS ST W
  • Building permit02 140027Closed

    install sprinkler system on basement, 1st fl, & 2nd fl

    Jun 17, 2002 · 291 DUNDAS ST W
  • Building permit02 145667Closed

    Make interior alterations on portion of the first floor and construct platform on South side. (to create a temporary exit) Tenant: Ontario College of Art & Design see 02 - 123901

    Jun 14, 2002 · 291 DUNDAS ST W
  • Building permit02 123901Closed

    install partitions in basement, 1st and 2nd floors. tenant: Ontario College of Art & Design attn: Wade Tam

    May 16, 2002 · 291 DUNDAS ST W
  • Building permit01 180105Closed

    construct new interior stair from basement level to street level within existing building area. also install new fire escape door opening at same location (south elevation - rear). make interior alterations to basement, 1st and 2nd floor for new washrooms. tenant: ontario college of art and design.

    Nov 22, 2001 · 291 DUNDAS ST W
  • Building permit01 165265Closed

    make interior alterations basement, 1st and 2nd floor by install new elevator only.

    Nov 22, 2001 · 291 DUNDAS ST W
  • Minor varianceA535/01TOApproved

    This application also includes No. 115 McCaul Street. The proposal is to enclose the entrance and side stairwell on the southwest side of the retail store and office building on the property. Also, construct a ground floor bay window addition at the south side.

    Oct 24, 2001 · 291 DUNDAS ST W
  • Building permit99 012018Closed - Dormant

    INSTALL HVAC & KIT. EXHAUST IN UNIT #F17-19 FOOD COURT - "AL'S FISH & CHIPS". (INTERIOR ALTERATION) REFER TO APPLICATION NUMBER: 421113

    Mar 1, 1999 · 291 DUNDAS ST W
  • Zoning review97 027027 LTOClosed
    Nov 12, 1997 · 291 DUNDAS ST W
  • Zoning review96 025680 LTOClosed
    Nov 13, 1996 · 291 DUNDAS ST W
  • Zoning review95 025424 LTOClosed
    Jul 20, 1995 · 291 DUNDAS ST W
  • Zoning review94 025388 LTOClosed
    Sep 29, 1994 · 291 DUNDAS ST W
  • Zoning review93 025832 LTOClosed
    Nov 30, 1993 · 291 DUNDAS ST W
  • Zoning review83 026516 LTOClosed
    Dec 13, 1983 · 291 DUNDAS ST W
  • Zoning review83 025674 LTOClosed
    Mar 7, 1983 · 291 DUNDAS ST W
  • Zoning review82 026740 LTOClosed
    Dec 21, 1982 · 291 DUNDAS ST W
  • Zoning review82 025984 LTOClosed
    Apr 21, 1982 · 291 DUNDAS ST W

Check before you build

  • Site-specific exception 900.11.10(2485)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2485)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86

  2. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86

2 parts for other addresses
  • B On 109 McCaul St., former City of Toronto by-laws 267-73, 531-80, 551-80, 94-0534 and 97-0601.
  • B On 109 McCaul St., former City of Toronto by-laws 267-73, 531-80, 551-80, 94-0534 and 97-0601.
By-law 569-2013, Chapter 900

Lot facts

Area
591 m²
Frontage
18.8 m
Depth
32.8 m
Street
Dundas St W
Corner lot
Yes, also on McCaul St32.8 m along it
Public lane
None
House footprint
519 m²roof up to 10.9 m
Back yard
1.7 mhouse to rear lot line
Side yards
0.1 m and 0.4 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 202. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: St Patrick. The lot is inside the St Patrick Major Transit Station Area approved by the Province (Site and Area Specific Policy 610). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Dundas Street West. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 2.5 (c2.0; r2.0) SS2 (x2485) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%19 of 19 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
17
Development applications
26

Within 300 m, last 10 years. 17 suite and multiplex permits: more than at 85% of Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.

    292 DUNDAS ST W · Mar 4, 2026 · 43 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

    130 ELIZABETH ST · Jan 14, 2026 · 472 m away
  • Minor varianceApproved

    To convert the existing three-storey mixed-use building (containing four residential dwelling units and non-residential uses within the basement and on the ground floor) into a hotel building (containing 10 units). There will be non-residential uses on the ground level with an outdoor patio, and a second level terrace.

    168 MC CAUL ST · Oct 23, 2024 · 211 m away
  • Minor varianceApproved

    To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.

    203 DUNDAS ST W · Oct 16, 2024 · 316 m away
  • Minor varianceApproved

    To alter the development standards for a 32-storey mixed-use building (as approved under Site Specific Zoning By-laws 441-2021 and 442-2021 (LPAT), and By-Laws 438-86 and 569-2013), to increase the gross floor area, the building height, and the mechanical equipment area, as well as to reduce the outdoor amenity space and width of bicycle parking spaces.

    292 DUNDAS ST W · Dec 13, 2023 · 43 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.

    317 DUNDAS ST W · Dec 16, 2026 · 134 m away
  • Consent (lot split)Pending

    To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.

    100 MCCAUL ST · Dec 16, 2026 · 124 m away
  • Zoning review

    Closed

    84 ST PATRICK ST · Nov 24, 2026 · 211 m away
  • Zoning review

    Application On Hold

    522 UNIVERSITY AVE · Nov 24, 2026 · 245 m away
  • Building permit

    Interior alteration to existing office space (Unit 2200)

    400 UNIVERSITY AVE · Nov 18, 2026 · 235 m away
  • Building permit

    Interior alterations, HVAC & plumbing. Conversion of existing Heydon Park Secondary School to elementary school.

    70 D'ARCY ST · Nov 10, 2026 · 290 m away
  • Building permit

    Proposed replacement of hot water recirculation lines.

    96 ST PATRICK ST · Nov 9, 2026 · 146 m away
  • Zoning review

    Not Started

    300 SIMCOE ST · Nov 6, 2026 · 234 m away
  • Building permit

    Mechanical retrofit to improve building energy efficiency including working in various building mechanical rooms and roofs on the chilled water, heating water, and glycol piping networks. Some new equipment will be installed including a an air source heat pump, heat recovery chiller, and fan coil units.

    500 UNIVERSITY AVE · Nov 5, 2026 · 215 m away
  • Building permit

    Minor millwork removal / replacement. Countertop refinishing. Removal of plumbing fixtures. Bringing space back to original building condition (office) after previous tenant.

    10 STEPHANIE ST · Nov 4, 2026 · 292 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
St Patrick Station5 min walk
Nearest TTC stop
Dundas St West at McCaul St1 min walk
Nearest cycling route
Beverley StBike Lane, 4 min walk
Nearest traffic count
17,056 vehicles in 14 hDundas St W / McCaul St, 30 m away, Oct 9, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Gallery Park1 min walk
Grange Park2 min walk
St. Patricks Square6 min walk

Schools within 1 km

  • OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 1 min walk
  • OCAD UNIVERSITY - ANNEX BUILDING University 1 min walk
  • CONTACT ALTERNATIVE SCHOOL English Public 1 min walk
  • OCAD UNIVERSITY - THE LEARNING ZONE University 2 min walk
  • OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 2 min walk
  • OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 3 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.