Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
3 by-law investigations closed in the last two years
Good to knowClosed files (Order Issued Property Standards, Property Standards): 25 269803 PRS 00 IV (Order Issued Property Standards: Height of the guard for the exit stairs are less than..., 2025); 25 265828 PRS 00 IR (Property Standards, 2025); 25 169388 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations1 Committee of Adjustment file on this lot
Good to know1 approved. A1227/19TEY (To alter the existing three-storey, 31 unit, residential apartment building by construc..., 2020).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)Rental building evaluation: 85 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 31 units, built 1950).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- By-law investigation25 269803 PRS 00 IVClosed
Order Issued Property Standards: Height of the guard for the exit stairs are less than 920 millimetres measured vertically to the top of the guard from a line drawn through the outside edges of; Required guard does not prevent the passage of a sphere having a diameter more than 100 millimetres.; The location and size of openings present a hazard as they are designed with members or attachments between 140 millimetres and 900 millimetres above the level
Dec 12, 2025 · 2908 ST CLAIR AVE E - By-law investigation25 265828 PRS 00 IRClosed
Property Standards
Dec 12, 2025 · 2908 ST CLAIR AVE E - By-law investigation25 169388 PRS 00 IRClosed
Property Standards
Jun 2, 2025 · 2908 ST CLAIR AVE E - Building permit19 160863Closed
Proposal for interior alterations to the basement level to add 2 additional dwelling units - 30 in total in existing apartment building.
Sep 16, 2020 · 2908 ST CLAIR AVE E - Minor varianceA1227/19TEYApproved
To alter the existing three-storey, 31 unit, residential apartment building by constructing 9 new vertical bicycle parking spaces and two new residential units in the basement level.
Jun 24, 2020 · 2908 ST CLAIR AVE E - Building permit19 112791Closed
Proposal to install a backflow prevention device
Feb 25, 2019 · 2908 ST CLAIR AVE E
Lot facts
- Area
- 1,184 m²
- Frontage
- 25.9 m
- Depth
- 46.1 m
- Street
- St Clair Ave E
- Corner lot
- Yes, also on Squires Ave46.1 m along it
- Public lane
- None
- House footprint
- 627 m²roof up to 15 m
- Back yard
- 2.3 mhouse to rear lot line
- Side yards
- 1.1 m and 2.7 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 8.5 m
- Max lot coverage
- 35%
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 94%32 of 34 decisions
- Garden suite permits
- 6
- Laneway suite permits
- 3
- Multiplex permits
- 8
- Development applications
- 1
Within 300 m, last 10 years. 17 suite and multiplex permits: more than at 85% of Toronto houses (median 3). 34 variance decisions: more than at 68% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To legalize and to maintain the side (east) addition of the existing rear detached ancillary building (garage), which was constructed without an authorized building permit, and to permit the existing one-storey ancillary building (shed) in the rear yard that was constructed beyond the limits of an authorized building permit (20 22 236034 BLD 01 SR). Also, to construct a rear ancillary structure (engineered steel awning) in front of the existing garage.
31 PLAXTON DR · Aug 19, 2026 · 289 m away - Minor varianceApproved
To legalize and to maintain the existing covered front porch with stairs that was built beyond the limits of the authorized building permit (Permit No. 21 177213 BLD 01 SR).
77 ADAIR RD · Jul 8, 2026 · 402 m away - Minor varianceApproved
To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage, a rear basement walkout, a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.
8 HOLMSTEAD AVE · Jan 28, 2026 · 135 m away - Minor varianceApproved
To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage a rear basement walkout, and a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.
8 HOLMSTEAD AVE · Jan 28, 2026 · 135 m away - Minor varianceApproved
To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.
45 PEARD RD · Jan 28, 2026 · 240 m away
Latest activity nearby
- Building permit
PROPOSED NEW FRONT PORCH & EXTERIOR DOOR RELOCATION.
24 GLENCREST BLVD · Nov 18, 2026 · 275 m away - Zoning review
Not Started
33 PLAXTON DR · Nov 12, 2026 · 277 m away - Building permit
Proposed second floor addition and interior alteration
108 CEDARCREST BLVD · Oct 29, 2026 · 227 m away - Building permit
REMOVAL OF NON BEARING WALLS TO STUDS, NEW INSULATION, HVAC SYSTEM, NEW PLANNING, FIRE SEPARATION FOR MULTI TENANCY, EXISTING ENTRIES TO REMAIN, NO ADDITIONAL SQUARE FOOTAGE, NEW INTERIOR FIT UP
16 PEARD RD · Oct 21, 2026 · 179 m away - Building permit
Two Storey Addition+Second Storey Addition+Interior Alteration+Second Suite+Deck+Balconies+Attached Garage+Porch
27 ADAIR RD · Oct 15, 2026 · 295 m away - Building permit
Proposal for interior alterations to convert the existing SFD to a 5 unit dwelling.
91 GLENCREST BLVD · Oct 9, 2026 · 230 m away - Zoning review
Closed
28 SQUIRES AVE · Oct 6, 2026 · 240 m away - Building permit
Installation of Main Drain Pipe "Backwater Valve".
76 SQUIRES AVE · Oct 1, 2026 · 177 m away - Building permit
PROPOSED DEMOLISH EXISTING DETACHED SFD AND CONSTRUCT NEW 3 STORY SIX-PLEX INCLUDING TWO PRCH AND FINISHED BASEMENT
42 GLENCREST BLVD · Sep 25, 2026 · 158 m away - Building permit
PROPOSED DEMOLISH EXISTING DETACHED SFD AND CONSTRUCT NEW 3 STORY SIX-PLEX INCLUDING TWO PORCHES AND FINISHED BASEMENT
42 GLENCREST BLVD · Sep 25, 2026 · 158 m away
Neighbourhood: O'Connor-Parkview
About the area around the lot, not the lot itself.
- Nearest station
- O'Connor Station30 min walk
- Nearest TTC stop
- St Clair Ave East at Squires Ave1 min walk
- Nearest cycling route
- Dawes RdBike Lane, 8 min walk
- Nearest traffic count
- 18,473 vehicles in 14 hSt Clair Ave E / Squires Ave, 40 m away, Feb 26, 2025
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Topham Park6 min walk
- Jim McPherson Park8 min walk
- Dawes Rd8 min walk
Schools within 1 km
- GORDON A BROWN MDL SCHOOL English Public 6 min walk
- SELWYN ELEMENTARY SCHOOL English Public 7 min walk
- VICTORIA PARK ELEMENTARY SCHOOL English Public 9 min walk
- OUR LADY OF FATIMA CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
- ABACUS MONTESSORI Private 13 min walk
- GEORGE WEBSTER ELEMENTARY SCHOOL English Public 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | O'Connor-Parkview | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $77,000 | $84,500 |
| Households that own their home | 46% | 54% |
| Population (2021) | 18,405 | 16,813 |
| Homes built in 1960 or before | 48% | 29% |
| Homes needing major repairs | 10% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | O'Connor-Parkview | City median |
|---|---|---|
| Assault | 755.6 | 636.3 |
| Robbery | 43.6 | 69.5 |
| Shootings | 4.8 | 10.5 |
| Auto theft | 179.2 | 192.6 |
| Theft over $5,000 | 38.7 | 46.1 |
| Break and enter | 77.5 | 172.8 |
| Theft from vehicles | 193.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.