HousePrecheckCheck an address

2900 Jane StToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (f30.0; a1375; d1.5)83.1 × 146.1 m11,675 m²on Jane St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 14 storeys, 183 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 23 108380 (Replace balcony guards, 2023, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 4 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 246415 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 93 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Jane and FinchThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
83.1 m frontage146.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 246415 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2023

    Needs a closer look

    Still open in the City's records: 23 108380 (Replace balcony guards, 2023, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 12 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 198959 PRS 00 IR (Property Standards, 2026); 26 189133 PRS 00 IR (Property Standards, 2026); 26 173135 000 00 IR (Adequate Heat, 2026); and 9 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A511/05EYK (To enclose the existing underground parking garage ramp, 2005).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 4 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 93 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (14 storeys, 183 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

22 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 246415 PRS 00 IRRescheduled

    Property Standards

    Sep 29, 2026 · 2900 JANE ST
  • By-law investigation26 198959 PRS 00 IRClosed

    Property Standards

    Jul 9, 2026 · 2900 JANE ST
  • By-law investigation26 189133 PRS 00 IRClosed

    Property Standards

    Jun 22, 2026 · 2900 JANE ST
  • By-law investigation26 173135 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 2900 JANE ST
  • By-law investigation26 173134 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 2900 JANE ST
  • By-law investigation25 246354 PRS 00 IRClosed

    Property Standards

    Oct 29, 2025 · 2900 JANE ST
  • By-law investigation25 203800 PRS 00 IRClosed

    Property Standards

    Aug 1, 2025 · 2900 JANE ST
  • By-law investigation25 175720 PRS 00 IRClosed

    Property Standards

    Jun 11, 2025 · 2900 JANE ST
Show 14 older records
  • By-law investigation25 153973 HEA 00 IRClosed

    Adequate Heat

    May 5, 2025 · 2900 JANE ST
  • Building permit25 131037Closed

    Proposal to install backflow preventer.

    Apr 4, 2025 · 2900 JANE ST
  • By-law investigation25 133312 PRS 00 IRClosed

    Property Standards

    Mar 23, 2025 · 2900 JANE ST
  • By-law investigation25 120640 SNI 00 IVClosed

    Notice Issued Snow and Ice

    Feb 22, 2025 · 2900 JANE ST
  • By-law investigation25 120558 SNI 00 IRClosed

    Snow and Ice

    Feb 22, 2025 · 2900 JANE ST
  • By-law investigation25 120185 PRS 00 IRClosed

    Property Standards

    Feb 21, 2025 · 2900 JANE ST
  • By-law investigation25 102036 PRS 00 IRClosed

    Property Standards

    Jan 7, 2025 · 2900 JANE ST
  • By-law investigation24 251770 PRS 00 IRClosed

    Property Standards

    Dec 18, 2024 · 2900 JANE ST
  • Building permit23 108380Permit Issued

    Replace balcony guards

    Apr 4, 2023 · 2900 JANE ST
  • Building permit21 110425Cancelled

    Replace balcony guards

    Jan 29, 2021 · 2900 JANE ST
  • Development application20 122745 WET 07 OZClosed

    A revised Zoning By-law amendment and Draft Plan of Subdivision to re-develop the site with 8 new blocks, 6 new buildings, a community centre, a public park, public roads and private driveways. The buildings would range in height from 4 storeys to 25 storeys and contain a total of 941 new dwelling units consisting of townhouses and apartment units of which 341 are TCHC units and 600 are market units. The units would consist of townhouses and apartment units. The existing 152 TCHC apartment units at 5 Needle Firway would be retained. A total of 991 residential units in addition to the 152 retained are proposed. A total of 932 parking spaces would be provided site wide. Properties include: 3, 36 Marsh Grassway, 7, 11 Blue Grassway, 4, 17 Cane Grassway, 5, 10, 40 Turf Grassway and 1,2, & 8 Dune Grassway.

    Mar 5, 2020 · 2900 JANE ST · City file
  • Minor varianceA511/05EYKApproved

    To enclose the existing underground parking garage ramp.

    Oct 27, 2005 · 2900 JANE ST
  • Zoning review05 181227 ZPRClosed
    Sep 16, 2005 · 2900 JANE ST
  • Building permit96 251162Closed - Dormant

    RETROFIT

    Dec 20, 1996 · 2900 JANE ST

Lot facts

Area
11,675 m²
Frontage
83.1 m
Depth
146.1 m
Street
Jane St
Corner lot
No
Public lane
None
House footprint
1,499 m²roof up to 42.6 m
Back yard
20.2 mhouse to rear lot line
Side yards
24.8 m and 39.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Jane and Finch. The lot is inside the Jane and Finch Major Transit Station Area approved by the Province (Site and Area Specific Policy 698). Source
  • Jane Finch Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 30 m. Frontage is about 83.1 m: meets the zone minimum. Source
  • Minimum lot area 1375 m². Lot area is 11,675 m²: meets the minimum. Source
  • Zone RAC (f30.0; a1375; d1.5) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: maple, norway (30 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing office space to residential dwelling units.

    10 YORKWOODS GT · Jun 3, 2021 · 386 m away

Latest activity nearby

  • Building permit

    Interior fit-out of an existing commercial tenant space (suite 105)

    2839 JANE ST · Oct 27, 2026 · 267 m away
  • Zoning review

    Cancelled

    2845 JANE ST · Sep 16, 2026 · 259 m away
  • Zoning review

    Cancelled

    2845-2891 JANE ST · Sep 16, 2026 · 210 m away
  • Zoning review

    Under Review

    57 PICARO DR · Aug 24, 2026 · 290 m away
  • Building permit

    Revision - to the entire floor .Proposed interior alteration to convert an vacant unit (previously retail store) to a day care.

    2950 JANE ST · Aug 14, 2026 · 159 m away
  • Building permit

    Proposed fire alarm for proposed daycare - See 26 178222 BLD 00 BA

    2950 JANE ST · Jul 23, 2026 · 159 m away
  • Building permit

    Replacement of fire damaged balcony railing and EIFS at unit 1207.

    5 NEEDLE FIRWAY · May 14, 2026 · 101 m away
  • Minor varianceApproved

    To convert the existing building into a day nursery.

    2950 JANE ST · Mar 26, 2026 · 159 m away
  • Building permit

    1 Wall Sign

    2839 JANE ST · Mar 3, 2026 · 267 m away
  • Zoning review

    Cancelled

    2853 JANE ST · Feb 12, 2026 · 248 m away

Neighbourhood: Glenfield-Jane Heights

About the area around the lot, not the lot itself.

Nearest station
Jane and Finch Station8 min walk
Nearest TTC stop
Jane St at Firgrove Cres (North) South Side3 min walk
Nearest cycling route
Yorkwoods GtSharrows - Wayfinding, 5 min walk
Nearest traffic count
26,294 vehicles in 14 hJane St / Yewtree Blvd / Firgrove Cres, 210 m away, Apr 23, 2025
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 8 with pedestrians, 0 with cyclists
Parks
Firgrove Park5 min walk
Yorkwoods Park5 min walk
Langdale Court Greenbelt6 min walk

Schools within 1 km

  • ST FRANCIS DE SALES CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • FIRGROVE PUBLIC SCHOOL English Public 3 min walk
  • YORKWOODS PUBLIC SCHOOL English Public 7 min walk
  • WESTVIEW CENTENNIAL HIGH SCHOOL English Public 10 min walk
  • SENECA COLLEGE (YORKGATE CAMPUS) College 10 min walk
  • TOPCLIFF PUBLIC SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureGlenfield-Jane HeightsMedian neighbourhood
Median household income (2020)$70,500$84,500
Households that own their home52%54%
Population (2021)30,02016,813
Homes built in 1960 or before23%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleGlenfield-Jane HeightsCity median
Assault1083.8636.3
Robbery144.569.5
Shootings25.110.5
Auto theft226.2192.6
Theft over $5,00062.846.1
Break and enter113.1172.8
Theft from vehicles97.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.