HousePrecheckCheck an address

29 Chester AveToronto · zoning, lot size and permit records

Residential · R (d0.6) (x312)29.7 × 40.7 m1,205 m²on Chester Avebacks onto Ln N Danforth E Chester

Not a home

Carpark 87 (East Prop)

The City of Toronto's real estate inventory lists Carpark 87 (East Prop) here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Major Transit Station Area: ChesterThe City plans more homes around the station: good for transit, and more building over time.
N20 m
29.7 m frontage40.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A1067/16TEY (To alter the existing TTC Chester Station by constructing an above-grade building to ac..., 2017).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit17 205291Closed

    Rev 03: Revision for modification and addition to the existing standpipe systemREVISION - as per the bubbled drawingsProposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an addition above the existing below-grade portion. The addition will include a new entrance above grade, with storage/utility areas below grade and access stairs leading to/from the existing below grade portion of the building (platform level).

    Aug 28, 2019 · 29 CHESTER AVE
  • Minor varianceA1067/16TEYApproved

    To alter the existing TTC Chester Station by constructing an above-grade building to accommodate access to the existing below-grade portion of the transit station.

    Feb 15, 2017 · 29 CHESTER AVE
  • Zoning review16 205034 ZZCClosed
    Aug 11, 2016 · 29 CHESTER AVE

Check before you build

  • Exception 900.2.10(312) does not apply to this address

    Good to know

    The exception covers this area, but each of its 3 parts names other addresses. The standard rules on this page apply.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(312)Does not apply

Every part of the exception names other addresses. The standard rules apply to this lot.

3 parts for other addresses
  • A On 40 Ainsworth Rd., former City of Toronto by-law 323-85
  • B On or between the odd numbered addresses of 19-23 Canning Ave., the even numbered addresses of 20-24 Canning Ave., former City of Toronto by-law 376-78
  • C On 21R Pretoria Ave., City of Toronto by-law 250-08.
By-law 569-2013, Chapter 900

Lot facts

Area
1,205 m²
Frontage
29.7 m
Depth
40.7 m
Street
Chester Ave
Corner lot
No
Public lane
Ln N Danforth E Chester, 29.7 m along it
Max height
11 m
Max lot coverage
—
  • Major Transit Station Area: Chester. The lot is inside the Chester Major Transit Station Area approved by the Province (Site and Area Specific Policy 615). Source
  • Zone R (d0.6) (x312) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
94%78 of 83 decisions
Garden suite permits
2
Laneway suite permits
11
Multiplex permits
6
Development applications
1

Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 83 variance decisions: more than at 99% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (including a basement) and a rear ground level deck with stairs. Also, to enlarge portions of the east and west sides of the third storey.

    67 WOLFREY AVE · Oct 14, 2026 · 428 m away
  • Minor varianceApproved

    To alter the existing rear one-storey detached ancillary building (one-car garage) by constructing a complete second storey addition (containing one garden suite) with an east side cantilevered portion, and a north side flat roof cantilevered extension. Also, to construct an east side ground floor covered lounge (located below the cantilevered portion of the second level). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).

    32 BAYFIELD CRES · Oct 7, 2026 · 362 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey addition to the north side of the existing rear two-storey portion of the dwelling, a new rear ground floor deck and stairs, and to extend the rear ground floor patio. Also, to construct a third floor west side dormer addition, and a rear rooftop deck (above the second storey portion of the dwelling).

    20 BUTTERNUT ST · Sep 23, 2026 · 389 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial rear three-storey addition with rear second and third storey balconies. There will be a total of one residential dwelling unit on this lot.

    152 WOLFREY AVE · Aug 5, 2026 · 335 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a front covered porch with stairs, a rear deck with stairs, a rear basement walkout, and a rear third floor terrace.

    180 WOLFREY AVE · Jul 15, 2026 · 347 m away

Latest activity nearby

  • Building permit

    Revision 01 - structural revision to kitchen floor/ceiling framing and fire-separation assembly.Proposal for water damage repairs - Base Building ONLY - Remove and replace damaged subfloor sections to restore structural integrity. Remove and replace displaced and unsafe first-floor floor joists; remove and reinstate subfloor as needed to access framing. Repair or replace deteriorated basement wall studs.Install missing subfloor sections within the first-floor framing. Restore fire-rated assemblies.

    492 DANFORTH AVE · Nov 23, 2026 · 217 m away
  • Building permitsecondary suite

    Scope of work to include lowering the basement level by underpinning and a basement front addition under the front porch that is to be partially-reconstructed.

    964 A LOGAN AVE · Oct 29, 2026 · 223 m away
  • Building permit

    Proposal for installation of roof edge railings and ladder port at TTC's Chester Station.

    22 CHESTER AVE · Oct 28, 2026 · 56 m away
  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition (including basement) with a rear deck and stairs.

    22 GARNOCK AVE · Sep 15, 2026 · 232 m away
  • Building permit

    PROPOSED KITCHEN HOOD TO AN EXISTING RESTAURANT

    515 DANFORTH AVE · Sep 2, 2026 · 264 m away
  • Zoning review

    Closed

    499 DANFORTH AVE · Aug 11, 2026 · 224 m away
  • Building permit

    Proposal for patio with fixed awning at existing restaurant

    516 DANFORTH AVE · Jul 31, 2026 · 254 m away
  • Building permit

    Proposal for 3rd storey dormers on the north & south sides for habitable space in the attic. New Balcony, Re-roofing of the second-floor roof and the roof of the ground-level enclosed porch.

    82 CHESTER AVE · Jul 29, 2026 · 169 m away
  • Building permit

    Supply/install six (6) new awnings for TD Bank

    480 DANFORTH AVE · Jul 24, 2026 · 167 m away
  • Building permitdemolition

    Proposal to demo existing dwelling to construct a new 3 storey 2 Unit Dwelling.

    46 PLAYTER CRES · Jul 23, 2026 · 213 m away

Neighbourhood: Playter Estates-Danforth

About the area around the lot, not the lot itself.

Nearest station
Chester Station1 min walk
Nearest TTC stop
Chester Station - Eastbound Platform1 min walk
Nearest cycling route
Danforth AveCycle Track, 1 min walk
Nearest traffic count
7,454 vehicles in 8 hDanforth Ave / Chester Ave, 90 m away, Mar 8, 2022
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Logan Avenue Parkette1 min walk
Logan Green Field3 min walk
Withrow Park6 min walk

Schools within 1 km

  • FRANKLAND COMMUNITY SCHOOL English Public 4 min walk
  • JACKMAN AVENUE JR PUBLIC SCHOOL English Public 5 min walk
  • HOLY NAME CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • CENTENNIAL COLLEGE SCHOOL - CARLAW CAMPUS College 12 min walk
  • MONTCREST ELEMENTARY SCHOOL Private 12 min walk
  • CITY ADULT LEARNING CENTRE English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigurePlayter Estates-DanforthMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home48%54%
Population (2021)7,68016,813
Homes built in 1960 or before60%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peoplePlayter Estates-DanforthCity median
Assault1400.3636.3
Robbery59.369.5
Shootings11.910.5
Auto theft249.2192.6
Theft over $5,00035.646.1
Break and enter237.3172.8
Theft from vehicles712188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.