HousePrecheckCheck an address

29 Basin StToronto · zoning, lot size and permit records

Also 35 Basin St, 41 Basin St

Employment · EL 2.5 (x20)≈ 277.9 × 153.7 m36,043 m²on Basin St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 23 123486 STE 14 SA (Site Plan Approval for a film and television studio campus with 44,504 square metres of..., 2023). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
N50 m
≈ 277.9 m frontage≈ 153.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2019

    Needs a closer look

    Still open in the City's records: 19 153323 (Proposal for lintel and concrete repair in existing industrial building, 2019, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (5% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 123486 STE 14 SA (Site Plan Approval for a film and television studio campus with 44,504 square metres of..., 2023).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0327/18TEY (To permit a communications and broadcasting establishment, 2018).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit25 109426Closed

    1 Wall Sign**createTO**

    Feb 7, 2025 · 29 BASIN ST
  • Building permit25 106600Cancelled

    1 Wall Sign**createTO**

    Jan 20, 2025 · 29 BASIN ST
  • Building permit24 244747Cancelled

    1 wall sign**Create TO**

    Nov 28, 2024 · 29 BASIN ST
  • Development application23 123486 STE 14 SANOAC Issued

    Site Plan Approval for a film and television studio campus with 44,504 square metres of development with twelve sound stages, production offices, mill and support spaces, vehicular and bicycle parking in an above grade garage, and associated base camp and backlot facilities.

    Mar 15, 2023 · 41 BASIN ST · City file
  • Building permit19 153323Inspection

    Proposal for lintel and concrete repair in existing industrial building.

    Jul 31, 2019 · 29 BASIN ST
  • Minor varianceA0327/18TEYApproved

    To permit a communications and broadcasting establishment.

    May 17, 2018 · 29 BASIN ST
  • Building permit17 215808Closed

    Installation of a back flow prevention device

    Sep 11, 2017 · 41 BASIN ST
  • Building permit08 222241Closed

    To install (1) one backflow preventer.

    Jan 5, 2009 · 41 BASIN ST
Show 1 older records
  • Zoning review84 026058 LTOClosed
    Jan 17, 1984 · 35 BASIN ST

Check before you build

  • Site-specific exception 900.21.10(20)

    Needs a closer look

    22 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.21.10(20)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 29, 35, 41, and 75 Basin Street, as shown zoned EL 2.5 (x20) on Diagram 2 of By-law 1010-2022, buildings or structures may be constructed, used or enlarged in compliance with Sections

  2. Rule B

    to (V) below; (B) For the purposes of this exception, the lot is comprised of the lands identified as EL 2.5 (x20) on Diagram 2 of By-law 1010-2022

  3. Rule C

    In accordance with Clause 5.10.30.20, the lot line abutting Basin Street is the front lot line

  4. Rule D

    Despite Regulations 60.5.40.10(1) and (2), the height of a building or structure is the distance between Canadian Geodetic Datum of 76.85 metres and the elevation of the highest point of the building or structure

  5. Rule E

    Despite Regulation 60.5.40.60(1), a canopy, awning or similar structure may encroach into a required minimum building setback that is not a street yard , regardless of how high it is above the elevation of the ground directly below it

  6. Rule F

    In addition to the uses permitted in Regulation 60.10.20.10(1), the following uses are also permitted: (i) Art Gallery ; (ii) Club ; (iii) District Heating and Cooling Plant ; (iv) Library; (v) Massage Therapy ; (vi) Medical Office; (vii) Museum ; (viii) Personal Service Shop ; (ix) Recreation Use ; (x) Retail Service ; (xi) Software Development and Processing ; and (xii) Wellness Centre

  7. Rule G

    Despite Regulations 60.10.20.10(1) and 60.10.20.20(1), the following uses are not permitted: (i) Crematorium ; (ii) Dry Cleaning or Laundry Plant; (iii) Open Storage ; (iv) Plastic Product Manufacturing Use ; and (v) Self-storage Warehouse

  8. Rule H

    Despite the uses permitted in Regulations 60.10.20.10(1) and 60.10.20.20 (1), the following uses are also permitted if they comply with the specific conditions associated with each use: (i) Cabaret provided the interior floor area does not exceed 1,000 square metres; (ii) Contractor's Establishment provided a contractor's establishment must store loose materials such as sand, gravel or concrete in an enclosed building ; (iii) Eating Establishment provided the individual interior floor area does not exceed 3,500 square metres and must comply with the specific use regulations in Section 150.100; (iv) Entertainment Place of Assembly provided the individual interior floor area does not exceed 1,000 square metres; (v) Financial Institution provided this use is not within 20.0 metres of an intersection of two streets ; (vi) Nightclub provided the individual interior floor area does not exceed 1,000 square metres; (vii) Office provided this use shall include production office, general office, and executive production office areas that will not exceed a floor space index of 0.85 over the entire lot ; (viii) Outdoor Patio provided it is an ancillary use associated with a cabaret , eating establishment , entertainment place of assembly , nightclub , recreation use , and a take-out eating establishment ; (ix) Parking Garage provided it is in one or two parking garages and collectively will not contain more than 1.25 parking spaces per 100 square metres of provided gross floor area on the lot and be located in the within the area depicted on Diagram 5 of By-law 1010-2022; (x) Retail Store provided the individual interior floor area does not exceed 3,500 square metres; (xi) Take-out Eating Establishment provided the individual interior floor area does not exceed 3,500 square metres; (xii) Transportation Use despite Regulation 60.12.20.100 (19), this use is a permitted use if it is operated by, or on behalf of, the Toronto Transit Commission; (xiii) Warehouse despite Clause 60.10.20.10, this use is a permitted use if it is not used for the purpose of, or in association with, a postal or courier service; and (xiv) Wholesaling Use despite Clause 60.10.20.10, this use is a permitted use if it is not used for the purpose of, or in association with, a postal or courier service

  9. Rule I

    For the purposes of this exception, Artist Studio , Custom Workshop , Entertainment Place of Assembly , Office, Performing Arts Studio , Production Studio , Software Development and Processing , and Warehouse shall be considered "studio-oriented use"

  10. Rule J

    For the purposes of this exception, "base camp" means an ancillary activity to the "studio-oriented uses" that involve the temporary parking and storage of fleet, production, and studio operation vehicles and are not considered parking spaces for the purposes of Clauses (H)(ix) and (U) of this exception

  11. Rule K

    Canopies, awnings, wind screens, snow screens, or similar structures over pedestrian entrances must be no less than 2.5 metres above the elevation of the ground directly below it. Canopies, awnings, or similar structures over production studio stage doorways must be no less than 6.1 metres above the elevation of the ground directly below it

  12. Rule L

    Any pedestrian and utility service bridge structures must be located no less than 6.1 metres above the elevation of the ground directly below it

  13. Rule M

    Any pedestrian and utility service bridge structures in (L) above must have no more than one storey and must not exceed a height of 5.5 metres, as measured floor to ceiling

  14. Rule N

    On the lot with a "studio-oriented use", a barrier, such as a fence, gate, berm, retaining wall, or landscaped buffer may be provided for areas: (i) between a lot line that abuts a street and an area that is used for a "studio-oriented use", located a maximum of 3.0 metres from the lot line that abuts a street , except for the portions used for vehicle and pedestrian access; or (ii) along the entire perimeter of the portion of the lot that is used for a "studio-oriented use"; and (iii) along all lot lines that abut the ON (x24) zone

  15. Rule O

    Despite Clause 60.5.40.10 and Regulation 60.10.40.10(1), the following structures and equipment may project beyond the permitted height of a building : (i) equipment used for the functional operation of the building including electrical, utility, mechanical and ventilation equipment, enclosed stairwells, roof access, maintenance equipment storage, elevator shafts and equipment, chimneys, and vents to a maximum of 2.5 metres; (ii) structures that enclose, screen or cover the equipment, structures and parts of a building listed in (i) above, inclusive of a mechanical penthouse, may project above the height limits to a maximum of 3.0 metres; (iii) architectural features, parapets, and elements and structures associated with a green roof may project above the height limits to a maximum of 2.0 metres; (iv) building maintenance units and window washing equipment may project above the height limits to a maximum of 2.5 metres; (v) planters, landscaping features, guard rails, and divider screens on a balcony and/or terrace may project above the height limits to a maximum of 2.0 metres; (vi) trellises, pergolas, and unenclosed structures providing safety or wind protection to rooftop amenity space may project above the height limits to a maximum of 2.5 metres; and (vii) architectural signage and associated structures may project above the height limits to a maximum of 5.0 metres

  16. Rule P

    Despite Regulation 60.10.40.10(1) and Diagram 4 attached to this By-law, any buildings or structures may have a height limit of 46.0 metres on the lot, so long as the cumulative area to which this height limit applies does not exceed 15 percent of the lot area for the 42.0 metre height limit area as indicated on Diagram 4 attached to this By-law

  17. Rule Q

    Despite Clause 60.10.40.10(1) and Diagram 4 attached to this By-law, the required minimum height of all main walls facing a lot line , with the exception of the former Sun Oil heritage building identified on Diagram 5 of By-law 1010-2022, is 10.0 metres

  18. Rule R

    Despite Regulations 60.10.40.70(1), (2), and (3), on the lot abutting a street or a lot line abutting the ON (x24) zone, the required minimum front yard setback , minimum side yard setback , and minimum rear yard setback is 0.0 metres

  19. Rule S

    Regulation 60.10.50.10(1), with regards to soft landscaping , does not apply to a lot line abutting a street

  20. Rule T

    Despite Regulation 60.5.80.10(1) and (2), a parking space may not be located in the front yard , side yard abutting a street , or in a side yard or rear yard abutting the ON (x24) zone

  21. Rule U

    Despite Regulation 200.5.10.1(1) and Table 200.5.10, for all permitted uses identified in Regulations 60.10.20.10(1) and 60.10.20.20(1) as amended by (F), (G), and (H) above, parking spaces may not exceed a maximum rate of 1.25 parking spaces per 100 square metres of gross floor area . No minimum parking spaces are required

  22. Rule V

    Despite Regulation 230.5.10.1(1) and Table 230.5.10.1(1), for all permitted uses identified in Regulations 60.10.20.10(1) and 60.10.20.20 (1) as amended by (F), (G), and (H) above, bicycle parking spaces must be provided at a minimum rate of 0.25 bicycle parking spaces per 100 square metres of interior floor area , allocated as follows: (i) 10 percent "short-term" bicycle parking spaces ; and (ii) 90 percent "long-term" bicycle parking spaces .

By-law 569-2013, Chapter 900

Lot facts

Area
36,043 m²
Frontage
277.9 mestimated, irregular lot
Depth
153.7 mestimated, irregular lot
Street
Basin St
Corner lot
No
Public lane
None
House footprint
487 m²roof up to 9.5 m
Back yard
123.8 mhouse to rear lot line
Side yards
17.9 m and 238.7 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
42 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Central Waterfront Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone EL 2.5 (x20) (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitnew building

    Soundstages purpose-built sound stages and support spaces. (Basin Studios)

    75 BASIN ST · Mar 25, 2025 · 273 m away
  • Building permitnew building

    Soundstages 9-12 purpose-built sound stages and support spaces. (Basin Studios)

    75 BASIN ST · Mar 25, 2025 · 273 m away
  • Building permitnew building

    Soundstages 5-8 purpose-built sound stages and support spaces. (Basin Studios)

    75 BASIN ST · Mar 25, 2025 · 273 m away
  • Building permitnew building

    Soundstages 1-4 purpose-built sound stages and support spaces. (Basin Studios)

    75 BASIN ST · Mar 20, 2025 · 273 m away
  • Building permit

    1 Wall Sign**createTO**

    29 BASIN ST · Feb 7, 2025 · 103 m away
  • Building permit

    1 Wall Sign**createTO**

    29 BASIN ST · Jan 20, 2025 · 103 m away
  • Building permit

    1 wall sign**Create TO**

    29 BASIN ST · Nov 28, 2024 · 103 m away
  • Zoning review

    Closed

    75 BASIN ST · Dec 13, 2023 · 273 m away
  • Building permit

    To erect and display one illuminated ground sign, displaying static copy, with two sign faces, located on the east frontage, parallel to Bouchette Street.Sign face 1 dimensions: 1.63m L x 2.81m W x 0.46m D; at a height of 6.01mSign face 2 dimensions: 2.61m L x 1.83m W x 0.46m D; at a height of 4.02m****PINEWOOD STUDIOS****

    301 COMMISSIONERS ST · Apr 27, 2023 · 207 m away
  • Development application

    Site Plan Approval for a film and television studio campus with 44,504 square metres of development with twelve sound stages, production offices, mill and support spaces, vehicular and bicycle parking in an above grade garage, and associated base camp and backlot facilities.

    35 BASIN ST · Mar 15, 2023 · 44 m away · City file

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest TTC stop
Commissioners St at Bouchette St East Side4 min walk
Nearest cycling route
Commissioners StCycle Track, 4 min walk
Nearest traffic count
6,296 vehicles in 14 hBouchette St / Commissioners St, 250 m away, Oct 6, 2026
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
McCleary Park6 min walk
Cherry Beach Clarke Beach Park8 min walk
Biidaasige Park9 min walk

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.