Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (52% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (47% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Building permit open since 2020
Needs a closer lookStill open in the City's records: 19 239894 (Proposal to construct a new 24' hexagon shade shelter with footings to be installed nex..., 2020, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (37% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
1 records on file: more than at 53% of Toronto houses (median 0).
- Building permit19 239894Inspection
Proposal to construct a new 24' hexagon shade shelter with footings to be installed next to playground in the park
Jan 7, 2020 · 2851 KIPLING AVE
Lot facts
- Area
- 17,059 m²
- Frontage
- 134.5 m
- Depth
- 148 m
- Street
- Kipling Ave
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
- Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, freeman autumn blaze (11 cm), maple, freeman autumn blaze (10 cm), maple, freeman autumn blaze (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%3 of 3 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
PROPOSED STRUCTURAL FIRE DAMAGE RESTORATION
10 MARKBROOK LANE · Aug 19, 2026 · 197 m away - Building permit
Plumbing - Install metal ceiling box fame to house pot lights and new plumbing water line to unit 412
41 MARKBROOK LANE · Dec 29, 2025 · 143 m away - Building permit
Proposal for multiple projects (basement walkout stair and interior alterations).
25 MOFFATT CRT · Aug 11, 2025 · 293 m away - Zoning review
Closed
2700 KIPLING AVE · Jan 23, 2025 · 155 m away - Building permit
Proposal for repairs and waterproofing to underground garage.
2777 KIPLING AVE · Nov 20, 2024 · 148 m away - Building permit
Supply and install (1) replacement RTU due to end of useful life.
2700 KIPLING AVE · Sep 6, 2024 · 155 m away - Building permit
Proposal for installation of new smoke detectors and control relays for B44 elevator modernization
2901 KIPLING AVE · Jul 3, 2024 · 116 m away - Zoning review
Closed
2700 KIPLING AVE · Feb 9, 2024 · 155 m away - Building permit
PROPOSED BELOW GRADE ENTRANCE
9 EVANGELINE CRT · Oct 24, 2023 · 256 m away - Building permit
Parking garage restoration including waterproofing repair, drain replacement, and concrete repair.
2777 KIPLING AVE · Mar 9, 2023 · 148 m away
Neighbourhood: Mount Olive-Silverstone-Jamestown
About the area around the lot, not the lot itself.
- Nearest station
- Stevenson Station25 min walk
- Nearest TTC stop
- Kipling Ave at Kidron Valley Dr2 min walk
- Nearest cycling route
- Kipling Ave Bicycle TrlMulti-Use Trail - Boulevard, 1 min walk
- Nearest traffic count
- 7,358 vehicles in 8 hKipling Ave / Kidron Valley Dr / Kipling Ave Bicycle Trl, 140 m away, Feb 8, 2022
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 2 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- North Humber Park1 min walk
- Rowntree Mills Park1 min walk
- Haimer Park4 min walk
Schools within 1 km
- NORTH KIPLING JR MDL SCHOOL English Public 10 min walk
- VENERABLE JOHN MERLINI CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- ST ANGELA CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
- JOHN D PARKER JR SCHOOL English Public 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Mount Olive-Silverstone-Jamestown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,500 | $84,500 |
| Households that own their home | 46% | 54% |
| Population (2021) | 31,345 | 16,813 |
| Homes built in 1960 or before | 14% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Mount Olive-Silverstone-Jamestown | City median |
|---|---|---|
| Assault | 788.6 | 636.3 |
| Robbery | 107.3 | 69.5 |
| Homicide | 2.9 | 5.3 |
| Shootings | 20.3 | 10.5 |
| Auto theft | 275.4 | 192.6 |
| Theft over $5,000 | 26.1 | 46.1 |
| Break and enter | 55.1 | 172.8 |
| Theft from vehicles | 130.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.