Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Multi-tenant (rooming) house licence: Active
Needs a closer lookThe City's licence list has this address as a multi-tenant house, status Active.
What it means. Four or more rooms here are, or were, rented to separate people. Ask about current tenants and leases before you offer: tenancies continue after a sale.
How to confirm. Municipal Licensing and Standards confirms the licence and its conditions. Details
City of Toronto, Multi-Tenant House Licences3 by-law investigations closed in the last two years
Good to knowClosed files (Notice Issued Rooming House, Rooming House): 26 228099 RMH 00 IV (Notice Issued Rooming House, 2026); 26 224598 RMH 00 IR (Rooming House, 2026); 24 246626 RMH 00 IR (Rooming House, 2024).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations1 Committee of Adjustment file on this lot
Good to know1 approved. B0033/26TEY (To obtain consent for the purpose of a stratified lot addition (air-rights) above an el..., 2026).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- By-law investigation26 228099 RMH 00 IVClosed
Notice Issued Rooming House
Aug 24, 2026 · 287 JARVIS ST - By-law investigation26 224598 RMH 00 IRClosed
Rooming House
Aug 24, 2026 · 287 JARVIS ST - Consent (lot split)B0033/26TEYApproved
To obtain consent for the purpose of a stratified lot addition (air-rights) above an elevation of 119 m of the property municipally known as 285-291 Jarvis Street.
Jul 8, 2026 · 291 JARVIS ST - Building permit25 111646Cancelled
Replacment of the exisitng fire alarm control panel.
Feb 3, 2025 · 287 JARVIS ST - By-law investigation24 246626 RMH 00 IRClosed
Rooming House
Dec 4, 2024 · 287 JARVIS ST - Building permit17 136230Closed
Rev 1: Proposal for demolition of three sets of wood front entrance stairs and rebuilding with stone steps, side walls and railings.
Dec 19, 2017 · 287 JARVIS ST
Check before you build
Site-specific exception 900.11.10(1597)
Needs a closer look3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category; Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86
- Rule B
Section 12(2) 256 of former City of Toronto By-law 438-86
- Rule C
Section 12(2) 270(a) of former City of Toronto By-law 438-86
- Older by-law A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category; Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 256 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 270(a) of former City of Toronto By-law 438-86
2 parts for other addresses
- D On 257 Jarvis St., the odd numbered addresses of 261-269 Jarvis St., 279 Jarvis St., former City of Toronto by-law 487-91.
- D On 257 Jarvis St., the odd numbered addresses of 261-269 Jarvis St., 279 Jarvis St., former City of Toronto by-law 487-91.
Lot facts
- Area
- 910 m²
- Frontage
- 22.3 m
- Depth
- 41.2 m
- Street
- Jarvis St
- Corner lot
- No
- Public lane
- None
- House footprint
- 442 m²roof up to 16.3 m
- Back yard
- 12.4 mhouse to rear lot line
- Side yards
- 0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 3.5 (c2.0; r2.0) SS2 (x1597) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 95%20 of 21 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 1
- Multiplex permits
- 9
- Development applications
- 33
Within 300 m, last 10 years. 10 suite and multiplex permits: more than at 75% of Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 151 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 389 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 494 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 358 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 357 m away
Latest activity nearby
- Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 136 m away - Building permit
Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.
231 DUNDAS ST E · Nov 19, 2026 · 190 m away - Building permit
Proposal to construct pedestrian ramp.
117 PEMBROKE ST · Oct 27, 2026 · 244 m away - Minor varianceApproved
To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.
185 GERRARD ST E · Oct 14, 2026 · 282 m away - Building permit
Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.
181 DUNDAS ST E · Oct 8, 2026 · 196 m away - Building permit
Proposal to replace existing make-up air unit and associated structural reinforcement work.
192 JARVIS ST · Oct 2, 2026 · 242 m away - Building permit
Proposal to replace roof top mounted mechanical units.
311 JARVIS ST · Oct 1, 2026 · 72 m away - Building permit
Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St
257 JARVIS ST · Sep 25, 2026 · 109 m away - Building permit
Proposal to replace existing make-up air unit and associated structural reinforcement work.
192 JARVIS ST · Sep 16, 2026 · 242 m away - Zoning review
Closed
200 DUNDAS ST E · Sep 4, 2026 · 157 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station9 min walk
- Nearest TTC stop
- Dundas St East at Jarvis St3 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 3 min walk
- Nearest traffic count
- 14,566 vehicles in 8 hJarvis St: Dundas St E - Gerrard St E, 40 m away, Jun 17, 2010
- Serious collisions within 500 m
- 222021–2026, killed or seriously injured: 3 fatal, 17 with pedestrians, 2 with cyclists
- Parks
- Allan Gardens4 min walk
- Arena Gardens4 min walk
- Moss Park6 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 5 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 6 min walk
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.