HousePrecheckCheck an address

2837 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c0.5; r3.0) SS2 (x2273)29.7 × 49.9 m1,361 m²on Glengrove Ave Ecorner, also on Yonge St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 67 rental units, built 1930More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 2 development applications open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
  • City upkeep score: 93 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
29.7 m frontage49.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Notice Issued Adequate Heat, Property Standards): 26 270037 PRS 00 IR (Property Standards, 2026); 26 267298 HEA 00 IR (Adequate Heat, 2026); 26 263329 HEA 00 IV (Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one..., 2026); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 93 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 67 units, built 1930).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 270037 PRS 00 IRClosed

    Property Standards

    Nov 15, 2026 · 2837 YONGE ST
  • By-law investigation26 267298 HEA 00 IRClosed

    Adequate Heat

    Nov 9, 2026 · 2837 YONGE ST
  • By-law investigation26 263329 HEA 00 IVClosed

    Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one (21) degrees Celsius.

    Oct 30, 2026 · 2837 YONGE ST
  • By-law investigation26 263058 HEA 00 IRClosed

    Adequate Heat

    Oct 30, 2026 · 2837 YONGE ST
  • By-law investigation26 259339 HEA 00 IRClosed

    Adequate Heat

    Oct 23, 2026 · 2837 YONGE ST
  • By-law investigation26 255379 ELS 00 IRClosed

    Election Signs: Have been placed less than 1.5 m from curb or edge of pavement on highway without sidewalk.

    Oct 16, 2026 · 2837 YONGE ST
  • By-law investigation26 213402 GRA 00 IRClosed

    Graffiti

    Aug 4, 2026 · 2837 YONGE ST
  • Building permit20 155028Closed

    Proposal to replace the fire alarm control panel in the existing apartment building.

    Jul 9, 2020 · 2837 YONGE ST
Show 5 older records
  • Building permit20 115396Closed

    Proposal for the addition of a fire department connection to the existing apartment building which has none.

    Mar 17, 2020 · 2837 YONGE ST
  • Building permit13 156444Closed

    To erect and display one double-sided, illuminated ground sign on the easterly frontage of property, in conjunction with a new condo development. **Timbercreek Commuinities**

    May 16, 2013 · 2837 YONGE ST
  • Building permit13 102136Closed

    Interior alterations to apartment building on all floors - moving parition walls

    Feb 11, 2013 · 2837 YONGE ST
  • Building permit09 146346Closed

    Install one back flow preventer

    Jul 29, 2009 · 2837 YONGE ST
  • Building permit98 017282Closed

    CARRY OUT REMEDIAL WORK TO COMPLY WITH THE RETROFIT PROVISIONS OF THE FIRE CODE. /LM

    Jul 17, 1998 · 2837 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2273)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2273)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On a lot , the permitted uses are not subject to regulation 40.10.40.1 (2) of this By-law; and [TO: 438-86; 12(1) 126]

  2. Rule B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 107 of former City of Toronto By-law 438-86; (B) Section 12(2) 269 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  4. Older by-law A

    On a lot , the permitted uses are not subject to regulation 40.10.40.1 (2) of this By-law; and [TO: 438-86; 12(1) 126]

  5. Older by-law B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 107 of former City of Toronto By-law 438-86; (B) Section 12(2) 269 of former City of Toronto By-law 438-86

  6. Older by-law C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
1,361 m²
Frontage
29.7 m
Depth
49.9 m
Street
Glengrove Ave E
Corner lot
Yes, also on Yonge St49.9 m along it
Public lane
None
House footprint
844 m²roof up to 23.9 m
Back yard
2.8 mhouse to rear lot line
Side yards
0 m and 0.6 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone CR 3.0 (c0.5; r3.0) SS2 (x2273) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: planetree, london (17 cm), basswood, american (14 cm), basswood, american (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%25 of 27 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
7

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To seek amendment to a previously approved 7-Storey mid-rise building to increase the number of units, height, and gross floor area and modify building setbacks and decrease the number of parking spaces. Note: This application was previously deferred at the Committee of Adjustment hearing on August 28, 2025.

    2851 YONGE ST · Feb 5, 2026 · 40 m away
  • Minor varianceApproved

    To construct a new 9 storey mixed use building. with 1 ground-floor commercial unit and 22 residential dwelling units.

    2722 YONGE ST · Nov 6, 2025 · 243 m away
  • Minor varianceApproved

    This application proposes a technical variance to By-law 897-2020 to facilitate the Severance Application (File # B0009/24NY).

    2781 YONGE ST · Jul 4, 2024 · 146 m away
  • Minor varianceApproved

    Proposed rear and above additions to the existing one-storey commercial building.

    2666 YONGE ST · Sep 14, 2023 · 425 m away

Latest activity nearby

  • Building permit

    Proposal for tree impact repairs to an Accessory Structure.

    22 WEYBOURNE CRES · Oct 30, 2026 · 278 m away
  • Building permit

    Proposal for localized garage repairs and exterior ramp

    2 ALEXANDRA BLVD · Aug 26, 2026 · 281 m away
  • Building permit

    Proposed third floor dormer to existing mixed use building (vet clinic and one residential dwelling unit)

    2722 YONGE ST · Aug 7, 2026 · 243 m away
  • Building permit

    PROPOSED INSTALLATION OF STANDPIPE BOOSTER PUMP

    2730 YONGE ST · Jul 21, 2026 · 214 m away
  • Building permit

    PROPOSED INTERIOR ALTERATIONS TO BASEMENT, MAIN FLOOR AND 2ND FLOOR LAYOUTS. REMOVAL OF LOAD-BEARING WALLS ON MAIN FLOOR AND 2ND FLOOR. NEW DOOR ASSEMBLY ON REAR WALL OF MAIN FLOOR. NEW WINDOW ON REAR WALL OF 2ND FLOOR.

    24 GLENCAIRN AVE · Jul 13, 2026 · 235 m away
  • Building permit

    Installation of new sump pump, sump pit, manhole and backwater valve

    2829 YONGE ST · Jun 2, 2026 · 89 m away
  • Building permit

    Proposed is a new porch awning over the existing front porch

    18 WEYBOURNE CRES · Apr 22, 2026 · 267 m away
  • Building permitdemolition

    Proposal to demolish existing 2 storey SFD and construct a new two storey dwelling complete with a basement walkout and a rear yard deck.

    47 GLENVIEW AVE · Mar 30, 2026 · 219 m away
  • Building permitnew building, new house

    Proposal to construct a new two storey dwelling complete with a basement walkout and a rear yard deck.

    47 GLENVIEW AVE · Mar 30, 2026 · 219 m away
  • Building permit

    Demolish rear detached garage, rear deck and construction of ancillary building in the backyard and new rear covered deck attached to the detached house. Refer to related Zoning Certificate 26 130631 ZAP 00 ZR.

    26 ST HILDA'S AVE · Mar 23, 2026 · 239 m away

Neighbourhood: Lawrence Park South

About the area around the lot, not the lot itself.

Nearest station
Lawrence Station10 min walk
Nearest TTC stop
Yonge St at Glengrove Ave West1 min walk
Nearest cycling route
Blythwood Ravine Park TrlMulti-Use Trail, 4 min walk
Nearest traffic count
15,396 vehicles in 8 hYonge St / Glengrove Ave E / Glengrove Ave W, 50 m away, Apr 11, 2018
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Alexander Muir Memorial Gardens1 min walk
Lawrence Park Ravine2 min walk
Duplex Parkette3 min walk

Schools within 1 km

  • BLYTH ACADEMY SCHOOL - LAWRENCE PARK Private 7 min walk
  • JOHN ROSS ROBERTSON JR PUBLIC SCHOOL English Public 11 min walk
  • GLENVIEW SR PUBLIC SCHOOL English Public 11 min walk
  • LAWRENCE PARK COLLEGIATE INSTITUTE English Public 13 min walk
  • ST CLEMENTS SCHOOL Private 13 min walk
  • ST CLEMENTS EARLY LEARNING Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureLawrence Park SouthMedian neighbourhood
Median household income (2020)$162,000$84,500
Households that own their home69%54%
Population (2021)14,96016,813
Homes built in 1960 or before69%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleLawrence Park SouthCity median
Assault200.2636.3
Robbery35.369.5
Auto theft176.6192.6
Theft over $5,00041.246.1
Break and enter288.5172.8
Theft from vehicles88.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.