Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 283 Cedarvale Ave
283 Cedarvale Ave is on a 7.6 m by 50.3 m lot on Cedarvale Ave in Woodbine-Lumsden. The zoning is RD.
The City has 3 records on this lot since 2017. That is more than at 81% of Toronto houses. In 2023, a building permit was filed: "Revision 03 - revision - revised exterior wall construction proposal to construct a 2 storey rear addition, rear basement walkout, rear deck, and interior…". Status: closed. In 2018, a Committee of Adjustment application was filed: "To alter the existing two-storey detached dwelling by constructing a rear two storey addition and by adding a dwelling unit in the basement for a total of…". Status: closed. In 2017, a zoning review was filed. Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Woodbine station is a 10-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Records mention multiplex, second unitModerateFree check
- 1 City tree in front of this lotLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention multiplex, second unit
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Records mention multiplex, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
3 records on file, more than at 81% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2023-09-29 | Building permit18 217822 | Revision 03 - REVISION - revised exterior wall construction Proposal to construct a 2 storey rear addition, rear basement walkout, rear deck, and interior alterations to convert from single family residential dwelling to dwelling with ONE secondary suite. (to legalize one of the 'existing' of 2 residential units. The main floor to be used in conjunction with the second floor as one unit and the basement as the second unit. See ZZC and COA.(Total of two units under this proposal) | Closed | |
| 2018-07-11 | Minor varianceA0109/18TEY | To alter the existing two-storey detached dwelling by constructing a rear two storey addition and by adding a dwelling unit in the basement for a total of three dwelling units. | Approved | |
| 2017-08-25 | Zoning review17 222756 ZZC | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, second unit
- Garden suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f6.0; a185; d0.75)
- Height limit
- 8.5 m
- Lot coverage limit
- 35%
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 96 m²
- Back yard
- 28 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- In the Woodbine station area
- 21 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Homicide: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Woodbine-Lumsden neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Woodbine StationNearest station10 min walk
- Woodbine Ave at Sammon AveNearest TTC stop3 min walk
- Woodbine AveNearest cycling route3 min walk
- D A Morrison Mdl SchoolSchool6 min walk
- Gledhill Jr Public SchoolSchool10 min walk
- St Brigid Catholic Elementary SchoolSchool11 min walk
- Canadian Martyrs Catholic Elementary SchoolSchool14 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3672.5
- Robberycity median 69.523.2
- Homicidecity median 5.311.6
- Shootingscity median 10.511.6
- Auto theftcity median 192.6173.9
- Theft over $5,000city median 46.146.4
- Break and entercity median 172.869.6
- Theft from vehiclescity median 188.1243.5
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist