HousePrecheckCheck an address

28 Wellesley St EToronto · zoning, lot size and permit records

≈ 29.3 × 46.1 m1,081 m²on Wellesley St E

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 25 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 29.3 m frontage≈ 46.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 144572 ZON 00 IR (Zoning, 2026); 25 261569 ZON 00 IR (Zoning, 2025); 25 161046 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0354/19TEY (To permit a dental office (medical/office use) inside an existing 35-storey mixed-use b..., 2019).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 25 development applications open within 300 m

    Good to know

    25 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 144572 ZON 00 IRClosed

    Zoning

    Apr 15, 2026 · 28 WELLESLEY ST E
  • By-law investigation25 261569 ZON 00 IRClosed

    Zoning

    Dec 2, 2025 · 28 WELLESLEY ST E
  • By-law investigation25 161046 PRS 00 IRClosed

    Property Standards

    May 16, 2025 · 28 WELLESLEY ST E
  • Building permit19 127113Closed

    Proposal for interior alterations for a new dental office, scope of work include plumbing, hvac, electrical and sprinkler work, convenience address is 32 Wellesley Street East.

    Aug 13, 2019 · 28 WELLESLEY ST E
  • Minor varianceA0354/19TEYApproved

    To permit a dental office (medical/office use) inside an existing 35-storey mixed-use building.

    Jul 17, 2019 · 28 WELLESLEY ST E
  • Development application14 159828 STE 27 OZClosed

    Site Plan application, Official Plan and Zoning By-law Amendment applications have been submitted to permit a 37-storey mixed use building on Wellesley Street with ground floor retail; and semi-detached houses fronting Dundonald Street, with a row of townhouses to the rear (3 to 4 storeys, 10 units total). Three levels of underground parking are proposed with a Toronto Parking Authority Garage on P1. It should be noted that a 28-storey tower was approved in 2006 on the Wellesley Street Site.

    May 22, 2014 · 50 WELLESLEY ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,081 m²
Frontage
29.3 mestimated, irregular lot
Depth
46.1 mestimated, irregular lot
Street
Wellesley St E
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%31 of 31 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    3
    Development applications
    52

    Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 31 variance decisions: more than at 64% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

      508 CHURCH ST · Sep 9, 2026 · 249 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

      20 MAITLAND ST · Apr 1, 2026 · 140 m away
    • Minor varianceApproved

      To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

      27 GROSVENOR ST · Jul 30, 2025 · 392 m away
    • Minor varianceApproved

      To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

      26 MAITLAND ST · Apr 23, 2025 · 133 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

      510 YONGE ST · Mar 19, 2025 · 259 m away

    Latest activity nearby

    • Building permit

      Proposed interior alterations for dental office

      16 WELLESLEY ST W · Nov 10, 2026 · 210 m away
    • Building permit

      Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor

      9 ST NICHOLAS ST · Nov 9, 2026 · 198 m away
    • Building permit

      1 projecting sign**SHIRIN JAAN**

      508 YONGE ST · Nov 5, 2026 · 263 m away
    • Building permit

      2 Wall Sign****AXIA STATION****

      608 YONGE ST · Nov 5, 2026 · 170 m away
    • Building permit

      Proposal for interior alterations to accommodate new office

      22 ST JOSEPH ST · Nov 4, 2026 · 294 m away
    • Building permit

      REV: Proposed revision for ventilation adjustments based on as-built conditionProposal to replace heating plant, domestic hot water heating, potable water distribution, ventilation and air conditioning systems.

      2 GLOUCESTER ST · Nov 3, 2026 · 206 m away
    • Building permit

      1 Wall Sign

      522 YONGE ST · Nov 2, 2026 · 239 m away
    • Building permit

      1 Wall Sign*****XI NOODLE HOUSE*****

      510 YONGE ST · Nov 2, 2026 · 259 m away
    • Building permit

      Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.

      43 WELLESLEY ST E · Oct 28, 2026 · 80 m away
    • Zoning review

      Notice Sent

      508 YONGE ST · Oct 26, 2026 · 263 m away

    Neighbourhood: Church-Wellesley

    About the area around the lot, not the lot itself.

    Nearest station
    Wellesley Station1 min walk
    Nearest TTC stop
    Wellesley Station1 min walk
    Nearest cycling route
    Wellesley St ECycle Track, 1 min walk
    Nearest traffic count
    17,934 vehicles in 14 hYonge St / Wellesley St E / Wellesley St W, 150 m away, Jun 25, 2025
    Serious collisions within 500 m
    122021–2026, killed or seriously injured: 1 fatal, 8 with pedestrians, 1 with cyclists
    Parks
    Paul Kane House Parkette1 min walk
    James Canning Gardens2 min walk
    Norman Jewison Park3 min walk

    Schools within 1 km

    • THE ABELARD CENTRE FOR EDUCATION Private 4 min walk
    • THE YMCA ACADEMY SECONDARY SCHOOL Private 4 min walk
    • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 5 min walk
    • CHURCH ST JR & NATIVE LEARNING CTR English Public 6 min walk
    • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 7 min walk
    • JARVIS COLLEGIATE INSTITUTE English Public 7 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureChurch-WellesleyMedian neighbourhood
    Median household income (2020)$60,400$84,500
    Households that own their home24%54%
    Population (2021)22,32016,813
    Homes built in 1960 or before15%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleChurch-WellesleyCity median
    Assault1264.6636.3
    Robbery93.269.5
    Homicide3.35.3
    Auto theft46.6192.6
    Theft over $5,000106.546.1
    Break and enter146.4172.8
    Theft from vehicles206.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.