HousePrecheckCheck an address

28 Upper Canada DrToronto · zoning, lot size and permit records

Residential multiple · RM (f21.0; a925; d0.85)≈ 80.8 × 116.9 m6,301 m²on Upper Canada Dr

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 54 rental units, built 1959More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 241545 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 99 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: York MillsThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 80.8 m frontage≈ 116.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 241545 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B051/02M (This is an application under Section 50, 53 and 54 of the Planning Act for the consent..., 2002).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • Rental building evaluation: 99 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 54 units, built 1959).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 241545 PRS 00 IRRescheduled

    Property Standards

    Sep 21, 2026 · 28 UPPER CANADA DR
  • Building permit09 166416Cancelled
    Oct 3, 2014 · 28 UPPER CANADA DR
  • Building permit06 148406Closed - Dormant

    Repair 39 balconies

    Jul 6, 2006 · 28 UPPER CANADA DR
  • Consent (lot split)B051/02MApproved

    This is an application under Section 50, 53 and 54 of the Planning Act for the consent of the Deputy Secretary-Treasurer of the Committee of Adjustment to the division of a parcel of lands into two parts for conveyance purposes and for the purpose of the granting of easements and right-of-way.

    Nov 1, 2002 · 28 UPPER CANADA DR
  • Building permit97 251076Closed

    FIRE ALARM RETROFIT

    May 23, 1997 · 28 UPPER CANADA DR

Lot facts

Area
6,301 m²
Frontage
80.8 mestimated, irregular lot
Depth
116.9 mestimated, irregular lot
Street
Upper Canada Dr
Corner lot
No
Public lane
None
House footprint
1,344 m²roof up to 19.6 m
Back yard
45.8 mhouse to rear lot line
Side yards
5.9 m and 15.1 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: York Mills. The lot is inside the York Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 639). Source
  • Minimum frontage 21 m. Frontage is about 80.8 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 925 m². Lot area is 6,301 m²: meets the minimum. Source
  • Zone RM (f21.0; a925; d0.85) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: kentucky coffeetree (15 cm), planetree, london (15 cm), maple, freeman autumn blaze (13 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    Proposal to construct addition to existing 2 storey dwelling and alterations to the garage and rear deck

    31-33 TOURNAMENT DR · Feb 16, 2023 · 423 m away
  • Minor varianceApproved

    This is an application under Section 45 of thePlanning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the re-configuration and addition of some internal residential units within the proposed Building 'C'.

    38 WILLIAM CARSON CRES · Jan 17, 2002 · 216 m away
  • Minor varianceApproved

    This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit one loading bay to be substandard in width.

    28 WILLIAM CARSON CRES · Oct 12, 2000 · 273 m away

Latest activity nearby

  • Building permit

    Revision 1: modify the existing front porch.Existing Basement Foundation Underpinning and Basement Walkout Modification.

    324 OLD YONGE ST · Oct 2, 2026 · 160 m away
  • Building permitdemolition

    DEMOLITION OF A TWO STOREY DWELLING

    225 OLD YONGE ST · Sep 19, 2026 · 259 m away
  • Building permitnew building, new house

    CONSTRUCTION OF A NEW 2 STOREY DETACHED HOUSE (SFD)

    225 OLD YONGE ST · Sep 19, 2026 · 259 m away
  • Building permit

    Proposed replacement of three exterior stairs

    29 UPPER CANADA DR · Aug 19, 2026 · 124 m away
  • Minor varianceApproved

    To construct a new two-storey detached dwelling with an integral garageand a new driveway as well as front porch.

    225 OLD YONGE ST · Jul 9, 2026 · 259 m away
  • Building permit

    Waterproofing, Concrete Repairs, Vertical Concrete Repairs,

    7 ALDERSHOT CRES · May 14, 2026 · 239 m away
  • Zoning review

    Notice Sent

    21 OAKLEY PL · Apr 16, 2026 · 192 m away
  • Zoning review

    Closed

    225 OLD YONGE ST · Apr 9, 2026 · 259 m away
  • Building permit

    Proposal to restore parking garage retaining walls, ramp, concrete, asphalt and site features.

    16 THE LINKS RD · Mar 30, 2026 · 253 m away
  • Building permit

    Proposal to construct a separate entrance to the basement at backyard. AND SMALL DECK OVERHEAD.

    237 OLD YONGE ST · May 30, 2025 · 153 m away

Neighbourhood: St.Andrew-Windfields

About the area around the lot, not the lot itself.

Nearest station
York Mills Station13 min walk
Nearest TTC stop
Lord Seaton Rd at Upper Canada Dr2 min walk
Nearest cycling route
York Mills Park TrlMulti-Use Trail - Connector, 15 min walk
Nearest traffic count
13,177 vehicles in 8 hHwy 401 Collectors E Ramp / Lord Seaton W Yonge Ramp / Yonge St N, 160 m away, Jun 11, 2012
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Tournament Park4 min walk
Yorkminster Park6 min walk
Trca Lands ( 89)7 min walk

Schools within 1 km

  • DUKE ACADEMY SECONDARY SCHOOL Private 10 min walk
  • DON VALLEY ACADEMY SECONDARY SCHOOL Private 10 min walk
  • FAIRMEADOW CENTRE English Public 11 min walk
  • ST EDWARD CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • TORONTO DISTRICT SCHOOL BOARD - OAKBURN CENTRE English Public 13 min walk
  • AVONDALE PUBLIC & AVONDALE ALTERNATIVE ELEMENTARY SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt.Andrew-WindfieldsMedian neighbourhood
Median household income (2020)$118,000$84,500
Households that own their home64%54%
Population (2021)16,96016,813
Homes built in 1960 or before17%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt.Andrew-WindfieldsCity median
Assault614.8636.3
Robbery106.969.5
Shootings5.310.5
Auto theft203.2192.6
Theft over $5,00042.846.1
Break and enter384.9172.8
Theft from vehicles219.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.