HousePrecheckCheck an address

28 Underwriters RdToronto · zoning, lot size and permit records

Employment · EH 1.0 (x11)146.3 × 432.6 m62,759 m²on Modern Rdcorner, also on Underwriters Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
146.3 m frontage432.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (3% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (11% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 Committee of Adjustment files on this lot

    Good to know

    0 approved. A075/15SC (This application is for a variance for a proposal to use the property for an asphalt ma..., 2015); B061/14SC (SEVER PORTION OF LANDS CONTAINING TRANSFORMER, 2015).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit15 229646Closednew building

    Construct 1-storey cement batching plant with an attached two storey office space (F2- SHELL ONLY, D-Finished) (Building D )

    Aug 22, 2016 · 28 UNDERWRITERS RD
  • Building permit15 229633Closed

    Rev#1 - Revision to plumbing as a result of architectural changes to offices and employee facilitiesPlumbing - Construct new office and warehouse building Building B & C for cement batching plant

    Apr 6, 2016 · 28 UNDERWRITERS RD
  • Zoning review15 175443 PSPClosed
    Sep 23, 2015 · 28 UNDERWRITERS RD
  • Development application15 175443 ESC 37 SAClosed

    Proposed warehouse, office, truck depot and concrete batching facility.

    Jun 16, 2015 · 28 UNDERWRITERS RD
  • Building permit15 114044Closeddemolition

    Mar 11/15: Proposal revised to include complete building B.Proposal to demolish portion of the "Bldg B" existing warehouse portion of "Bldg B" to remain

    Mar 16, 2015 · 28 UNDERWRITERS RD
  • Minor varianceA075/15SCPending

    This application is for a variance for a proposal to use the property for an asphalt manufacturing and mixing plant in conjunction with uses that include a warehouse, offices and a cement plant. WITHDRAWN; REFUND REQUEST E-MAILED TO PPFA FEBRUARY 25, 2016. (FM)

    Mar 11, 2015 · 28 UNDERWRITERS RD
  • Zoning review15 122916 ZZCClosed
    Mar 2, 2015 · 28 UNDERWRITERS RD
  • Zoning review15 119804 ZZUClosed
    Feb 20, 2015 · 28 UNDERWRITERS RD
Show 3 older records
  • Consent (lot split)B061/14SCPending

    SEVER PORTION OF LANDS CONTAINING TRANSFORMER

    Jan 12, 2015 · 28 UNDERWRITERS RD
  • Building permit10 268035Closed

    install backflow device SOUTH building

    Oct 19, 2010 · 28 UNDERWRITERS RD
  • Building permit10 268030Closed

    install backflow device north building

    Oct 19, 2010 · 28 UNDERWRITERS RD

Check before you build

  • Site-specific exception 900.22.10(11)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(11)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulation 60.30.20.10(1) the following uses are not permitted: Asphalt Plant; Hazardous substance manufacturing, processing or warehousing; Abattoir, Slaughterhouse or Rendering of Animals Factory; and Waste Transfer Station . Prevailing By-laws and Prevailing Sections: (None Apply)

  2. Older by-law A

    Despite regulation 60.30.20.10(1) the following uses are not permitted: Asphalt Plant; Hazardous substance manufacturing, processing or warehousing; Abattoir, Slaughterhouse or Rendering of Animals Factory; and Waste Transfer Station . Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
62,759 m²
Frontage
146.3 m
Depth
432.6 m
Street
Modern Rd
Corner lot
Yes, also on Underwriters Rd432.6 m along it
Public lane
None
House footprint
4,342 m²roof up to 10.5 m
Back yard
313.9 mhouse to rear lot line
Side yards
6 m and 40.9 mhouse to side lot lines
Buildings on the lot
8house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EH 1.0 (x11) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source

Around this lot

Minor variances approved
75%3 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Application On Hold

    61 CROCKFORD BLVD · Nov 2, 2026 · 242 m away
  • Zoning review

    Not Started

    75 CROCKFORD BLVD · Oct 28, 2026 · 169 m away
  • Zoning review

    Closed

    75 CROCKFORD BLVD · Sep 3, 2026 · 169 m away
  • Building permit

    New Recreational Baskeball Facility. Proposal for addition of a new ventilation (make up air system) and energy recovery unit, modification of interior diffusers and electrical life safety. Design includes for option heat pump units to provide auxiliary heat in lieu of existing gas power unit heaters.

    1160 BIRCHMOUNT RD · Sep 3, 2026 · 262 m away
  • Zoning review

    Closed

    75 CROCKFORD BLVD · Aug 31, 2026 · 169 m away
  • Zoning review

    Cancelled

    90 CROCKFORD BLVD · Aug 5, 2026 · 269 m away
  • Building permit

    Proposal to replace existing RP backflow prevention device on domestic water service with DCVA device.

    107 CROCKFORD BLVD · Jun 26, 2026 · 289 m away
  • Minor varianceApproved

    To construct a one storey rear addition to the existing one storey commercial vehicle service garage.

    75 CROCKFORD BLVD · Jun 3, 2026 · 169 m away
  • Zoning review

    Closed

    1160 BIRCHMOUNT RD · Feb 5, 2026 · 262 m away
  • Building permit

    REV 02: FRONT CANOPY AND STRUCTURAL FRAMING REVISIONSRevision 01 - Revision to include modifications to the interior partitions and alteration to window sizes and openings on exterior elevations. ----------------------------------------------------------------Interior alterations and alterations to the exterior facade to the existing office & warehouse building.

    78 CROCKFORD BLVD · Jan 8, 2026 · 256 m away

Neighbourhood: Wexford/Maryvale

About the area around the lot, not the lot itself.

Nearest station
Birchmount Station25 min walk
Nearest TTC stop
Birchmount Rd at Flora Dr5 min walk
Nearest cycling route
Gatineau Hydro Corridor TrlMulti-Use Trail, 7 min walk
Nearest traffic count
19,064 vehicles in 14 hBirchmount Rd / Flora Dr, 340 m away, Oct 19, 2024
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
McGregor Park10 min walk
Wayne Parkette13 min walk
Wexford Hydro13 min walk

Schools within 1 km

  • DELTA ACADEMY INC SECONDARY SCHOOL Private 4 min walk
  • GEORGE PECK PUBLIC SCHOOL English Public 11 min walk
  • GENERAL CRERAR PUBLIC SCHOOL English Public 11 min walk
  • WINSTON CHURCHILL COLLEGIATE INSTITUTE English Public 15 min walk
  • ST LAWRENCE CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWexford/MaryvaleMedian neighbourhood
Median household income (2020)$82,000$84,500
Households that own their home59%54%
Population (2021)28,34516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWexford/MaryvaleCity median
Assault1128.2636.3
Robbery125.769.5
Shootings32.210.5
Auto theft425.5192.6
Theft over $5,00083.846.1
Break and enter254.6172.8
Theft from vehicles441.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.