HousePrecheckCheck an address

28 Edward StToronto · zoning, lot size and permit records

Also 22 Edward St, 26 Edward St, 32 Edward St

Commercial residential · CR 6.0 (c2.0; r6.0) SS1 (x78)47.3 × 43.7 m1,768 m²on Edward Stbacks onto Ln W Yonge S Elm

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 21 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.
N20 m
47.3 m frontage43.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 21 development applications open within 300 m

    Good to know

    21 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 260976 ELS 00 IRClosed

    Election Signs

    Oct 27, 2026 · 28 EDWARD ST
  • Building permit26 141465Closed

    FS - Sprinkler Shop Drawing - Proposal for interior alterations for existing vacant space for new office - ESDC SERVICE CANADA CENTRE

    Oct 20, 2026 · 28 EDWARD ST
  • Building permit25 264711Closed

    1 WALL SIGN AND 1 PROJECTING SIGN**SAKU**

    Dec 11, 2025 · 28 EDWARD ST
  • Zoning review25 114677 LTOClosed
    Feb 10, 2025 · 26 EDWARD ST
  • Building permit24 222631Closed

    Proposed interior alterations for Bubble Tea Shop

    Nov 5, 2024 · 28 EDWARD ST
  • Development application14 266298 STE 27 OZClosed

    The applicant proposes to construct a 30-storey mixed-use building which contains 572 residential units as well as a total of 6,399.45 square metres of retail space on the ground floor, mezzanine, second floor and concourse level, and 2,843.78 square metres of office space on the third floor. The height of the building to the main roof is 101.6 metres (107.5 metres including mechanical penthouse). A total of 241 vehicular parking spaces are provided in a 4-level below-grade garage and 627 bicycle parking spaces are provided. The floor space index proposed is 15.84.

    Dec 19, 2014 · 28 EDWARD ST

Check before you build

  • Site-specific exception 900.11.10(78)

    Needs a closer look

    14 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(78)Applies

These parts of the exception apply to this lot's address.

  1. Rule B

    to (N) below; (B) Despite 40.5.40.10, 40.10.40.10 (1), and 600.10, average grade is Canadian Geodetic Datum elevation 93.24 metres and no portion of any building or structure shall have a height in metres greater than the height limits specified by the numbers following the symbol HT on Diagram 3 attached to and forming part of this By-law, except that: (i) nothing shall prevent canopies, wind screens, parapets, guard rails, roofing materials, railings and dividers, pergolas, trellises, eaves, screens, stairs, roof drainage, lightning rods, architectural features, landscaping, roof maintenance access ladder, elements of a green roof and window washing equipment including but not limited to davit arms and roof anchors, from projecting a maximum of 5.0 metres above the portions of buildings with height limits above average grade of up to 22.5 metres, as specified by the numbers following the symbol "HT" on Diagram 3 of this By-law; (ii) nothing shall prevent boiler flues, roof maintenance ladder, guard rails, parapets, roofing materials, landscaping, lightning rods, elements of a green roof and window washing equipment, including but not limited to davit arms and roof anchors, from projecting a maximum of 1.5 metres above the height limits of the portions of buildings with a maximum height of 94.5 metres, as specified by the numbers following the symbol "HT" on Diagram 3 of this By-law; (iii) nothing shall prevent boiler flues, roof maintenance ladder, parapets, roofing materials, landscaping, lightning rods and window washing equipment, including but not limited to davit arms, roof anchors, and elements of a green roof from projecting a maximum of 0.4 metres above the height limits of portions of buildings with a maximum height of 98.0 metres, as specified by the numbers following the symbol "HT" on Diagram 3 of this By-law; (iv) nothing shall prevent boiler flues, mechanical ducts, roof maintenance ladder, guard rails, parapets, roofing materials, landscaping, lightning rods, elements of a green roof , and window washing equipment, including but not limited to davit arms and roof anchors, from projecting a maximum of 1.8 metres above the height limits of the portions of with a buildings maximum height of 100.6 metres, as specified by the numbers following the symbol "HT" on Diagram 3 of this By-law; and (v) nothing shall prevent boiler flues, parapets, roofing materials, landscaping , lightning rods and window washing equipment, including but not limited to davit arms and roof anchors, from projecting a maximum of 0.6 metres above the height limits of the portions of buildings with a maximum height of 103.3 metres, as specified by the numbers following the symbol "HT" on Diagram 3 of this By-law.

  2. Rule C

    Despite 40.10.40.10(5), the required minimum height of the first storey , as measured between the floor of the first storey and the ceiling of the first storey , not including a mezzanine floor, is 4.5 metres.

  3. Rule D

    Despite 5.10.40.70, 40.5.40.60, 40.5.40.70, 40.10.40.60, 40.10.40.70 (1), and 600.10, no portion of any building or structure above average grade shall be located otherwise than wholly within the areas delineated by heavy lines on Diagram 3 attached to and forming part of this By-law, with the exception of the following: (i) the ground floor shall be set back 1.35 metres from the south property line; (ii) nothing shall prevent art and landscape features, cornices, light fixtures, ornamental elements, parapets, patios, decks, pillars, pergolas, trellises, balconies, terraces, eaves, window sills, planters, ventilation shafts, guardrails, balustrades, railings, stairs, stair enclosures, doors, wheelchair ramps, fences, screens, site servicing features, awnings and canopies, window washing equipment, and underground garage ramps and associated structures from extending a maximum of 3.0 metres beyond the heavy lines of portions of buildings with height limits above average grade of up to 94.5 metres, as specified by the numbers following the symbol "HT" on Diagram 3 of this By-law; (iii) nothing shall prevent window washing equipment, including but not limited to davit arms and roof anchors which have a maximum height of 1.5 metres, from extending a maximum of 2.0 metres beyond the heavy lines of portions of buildings with a height limit of 94.5 metres, as specified by the numbers following the symbol "HT" on Diagram 3 of this By-law; (iv) nothing shall prevent window washing equipment, including but not limited to davit arms and roof anchors which have a maximum height of 1.8 metres, from extending a maximum of 2.0 metres beyond the heavy lines of portions of buildings with a height limit of 100.6 metres, as specified by the numbers following the symbol "HT" on Diagram 3 of this By-law; (v) balconies may project no more than 1.7 metres beyond the heavy lines shown on Diagram 3 of this By-law, with the exception of the easternmost façade of the building where balconies shall not be permitted; and (vi) nothing in 4(C)(iii) shall prevent a terrace from projecting beyond the heavy lines in Diagram 3.

  4. Rule E

    Despite 40.10.40.40 (1), the maximum gross floor area of all buildings and structures on the lot must not exceed 47,700 square metres, and: (i) the total gross floor area of residential uses must not exceed 38,900 square metres; and (ii) the total gross floor area of non-residential uses must not exceed 8,850 square metres.

  5. Rule F

    The maximum number of dwelling units for any building erected on the lot is 560, of which: (i) a minimum of 51 dwelling units erected or units of the lands must each have three or more bedrooms in compliance with the provisions of the Ontario Building Code (O. Reg. 322/12), as amended or replaced from time to time.

  6. Rule G

    Despite 40.10.40.50, a minimum of 2.6 square metres of amenity space per dwelling unit must be provided including: (i) a minimum of 1.5 square metres of indoor residential amenity space per dwelling unit ; and (ii) a minimum of 1.1 square metres of outdoor residential amenity space per dwelling unit .

  7. Rule H

    Despite 200.5.10.1 and Table 200.5.10.1, a minimum number of parking spaces must be provided and maintained on the lot , in accordance with the following: (i) 129 parking spaces for the use of residents in the building ; (ii) 116 parking spaces for the non-residential uses in the building ; (iii) no parking spaces for visitors shall be required on the lot ; and (iv) 8 car-share parking spaces .

  8. Rule I

    Despite 40.10.100.10 (1), vehicular access to all buildings and structures on the lot may be provided from Edward Street

  9. Rule J

    Despite 200.15, as amended, only the following regulations apply to accessible parking spaces : (i) An accessible parking space must have the following minimum dimensions: (a) length of 5.6 metres; (b) width of 3.9 metres; and (c) vertical clearance of 2.1 metres. (ii) Accessible parking spaces must be the parking spaces located: (a) closest to a main pedestrian access to a building ; and; (b) at the same level as a pedestrian entrance to the building . (iii) Clearly identified off street accessible parking spaces must be provided on the same lot as every building or structure erected or enlarged, if the total parking space requirement is 5 or more, in compliance with the following: (a) if the number of required parking spaces is 5 to 24, a minimum of 1 parking space must comply with the minimum dimensions for an accessible parking space ; (b) if the number of required parking spaces is 25 to 100, a minimum of 1 parking space for every 25 parking spaces or part thereof must comply with the minimum dimensions for an accessible parking space ; (c) if the number of required parking spaces is more than 100, a minimum of 4 parking spaces plus 1 parking space for every 50 parking spaces or part thereof in excess of 100 parking spaces , must comply with the minimum dimensions for an accessible parking space .

  10. Rule K

    Despite 40.10.90.40 (1) and 40.10.90.40 (3), a minimum number of loading spaces must be provided and maintained on the lot , in accordance with the following: (i) a minimum of 2 Type "B" loading spaces ; (ii) a minimum of 2 Type "C" loading spaces ; and (iii) a minimum of 1 Type "G" loading space .

  11. Rule L

    Despite 230.5.1.10, 230.5.10.1 and Table 230.5.10.1(1), a minimum number of bicycle parking spaces must be provided and maintained on the lot , in accordance with the following: (i) a minimum of 0.9 bicycle parking spaces – occupant per dwelling unit ; (ii) a minimum of 0.1 bicycle parking spaces – visitor per dwelling unit ; (iii) a minimum of 41 bicycle parking spaces shall be specifically dedicated to non-residential uses; and (iv) despite 230.5.1.10(4), a stacked bicycle parking space must have a minimum width of 0.4 metres.

  12. Rule M

    Nothing in this By-law shall prevent the erection or use of a building , structure , addition or enlargement for a mixed use building , temporary sales office, car-sharing, parking garage , or any other use permitted by this exception

  13. Rule N

    For the purpose of Exception CR 78, all bold-type words and expressions have the same meaning as defined in By-law 569-2013, as amended, with the exception of the following: (i) car-sharing means the practice where a number of people share the use of one or more motor vehicles that are owned by a profit or non-profit car sharing organization. To use a car-sharing vehicle, a person must meet the membership requirements of the car-sharing organization, including the payment of a membership fee that may or may not be refundable. Vehicles are reserved in advance and fees for use are normally based on time and/or charge fees based on kilometres driven; (ii) car-share parking space means a parking space exclusively reserved and used only for car-sharing purposes whereby the vehicle is accessible to at least the occupants of the buildings ; (iii) lot means the parcel of land outlined by heavy lines on Diagram 1 attached to and forming part of this By-law; (iv) storey means a level of a building, other than a basement, located between any floor and the floor, ceiling or roof immediately above it, except that a storey shall not include a mezzanine level located between the first storey and the second full storey of a building provided that the gross floor area of the mezzanine level shall not exceed 50 percent of the gross floor area of the first storey in the building

  14. Rule O

    Notwithstanding any existing or future severances, partition, or division of the lot, the provisions of this By-law will apply to the whole of the lot as if no severance, partition, or division had occurred.

  15. Older by-law A

    (A) Section 12(2)256 of former City of Toronto By-law 438-86.

1 part for other addresses
  • A On 20 Edward Street, as shown on Diagram 1 of By-law 150-2021(LPAT), if the requirements of Section 5 and Schedule A of By-law 150-2021(LPAT) are complied …
By-law 569-2013, Chapter 900

Lot facts

Area
1,768 m²
Frontage
47.3 m
Depth
43.7 m
Street
Edward St
Corner lot
No
Public lane
Ln W Yonge S Elm, 38 m along it
House footprint
474 m²
Back yard
0 mhouse to rear lot line
Side yards
0.2 m and 0.5 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
8house, garage, sheds
Max height
46 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 6.0 (c2.0; r6.0) SS1 (x78) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
92%11 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
33

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 66 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

    130 ELIZABETH ST · Jan 14, 2026 · 301 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 444 m away
  • Minor varianceApproved

    To permit a place of amusement (arcade) use on this subject lot.

    247 YONGE ST · Jan 8, 2025 · 303 m away
  • Minor varianceApproved

    To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.

    203 DUNDAS ST W · Oct 16, 2024 · 467 m away

Latest activity nearby

  • Building permit

    Proposal for replacement of existing windows of office floors from Level 2-24.

    700 BAY ST · Nov 24, 2026 · 248 m away
  • Zoning review

    Closed

    335 YONGE ST · Nov 23, 2026 · 123 m away
  • Building permit

    Proposal for interior demolition of existing office floors from Level 2 - 24.

    700 BAY ST · Nov 23, 2026 · 248 m away
  • Building permit

    Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

    655 BAY ST · Nov 19, 2026 · 166 m away
  • Building permit

    Proposed an interior alteration

    595 BAY ST · Nov 19, 2026 · 116 m away
  • Building permit

    INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO

    121 DUNDAS ST W · Nov 17, 2026 · 248 m away
  • Building permit

    Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS

    686 BAY ST · Nov 17, 2026 · 187 m away
  • Building permit

    Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401

    595 BAY ST · Nov 9, 2026 · 116 m away
  • Zoning review

    Not Started

    21 DUNDAS SQ · Nov 6, 2026 · 258 m away
  • Building permit

    Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.

    1 DUNDAS ST W · Nov 5, 2026 · 145 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
TMU Station2 min walk
Nearest TTC stop
Yonge St at Gould St2 min walk
Nearest cycling route
Bay StBike Lane, 2 min walk
Nearest traffic count
9,037 vehicles in 14 hYonge St / Gould St, 100 m away, Apr 8, 2025
Serious collisions within 500 m
122021–2026, killed or seriously injured: 3 fatal, 9 with pedestrians, 3 with cyclists
Parks
Toronto Metropolitan University Square3 min walk
College Park4 min walk
Trinity Square4 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 2 min walk
  • TMU - HEASLIP HOUSE University 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 4 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 6 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.