Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2024
Needs a closer lookStill open in the City's records: 24 145156 (Proposal for AC Unit Replacement. Remove and Replace of 3 Rooftop AC Units and 6 Conden..., 2024, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 267211 (Proposal for removal and replacement of existing retaining wall, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
5 records on file: more than at 93% of Toronto houses (median 0).
- Building permit26 267211Application Acceptable
Proposal for removal and replacement of existing retaining wall.
Nov 8, 2026 · 2793 KEELE ST - By-law investigation25 141419 ELS 00 IRClosed
Election Signs
Apr 8, 2025 · 2793 KEELE ST - Building permit24 145156Permit Issued
Proposal for AC Unit Replacement. Remove and Replace of 3 Rooftop AC Units and 6 Condensing Units
May 15, 2024 · 2793 KEELE ST - Building permit23 197998Closed
Proposed replacement of existing convential fire alarm system with fully addressable new fire alarm system.
Oct 13, 2023 · 2793 KEELE ST - Building permit19 181256Closed
Demolition of replacement of exterior concrete main entry landing, stairs and ramp on the west building elevation, demolition of and replacement of exterior north stair, retaining wall and landing and removal of existing exterior window and infill with concrete on the east building elevation and basement waterproofing and asphalt paving replacement. Minor relocation of gas piping.
Aug 28, 2019 · 2793 KEELE ST
Check before you build
Site-specific exception 900.30.10(95)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625.
Lot facts
- Area
- 2,865 m²
- Frontage
- 48.7 mestimated, irregular lot
- Depth
- 70 mestimated, irregular lot
- Street
- Paxtonia Blvd
- Corner lot
- Yes, also on Keele St70 m along it
- Public lane
- None
- House footprint
- 1,247 m²roof up to 12.5 m
- Back yard
- 13.4 mhouse to rear lot line
- Side yards
- 3.3 m and 7.9 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone I (x95) (Institutional). Chapter 80, section 80.10 of the by-law. Source
- 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, norway globe (10 cm), plum (10 cm), maple, freeman autumn blaze (6 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 75%6 of 8 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 5
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposal to replace fire alarm control panel for existing store.
1090 WILSON AVE · Nov 17, 2026 · 96 m away - Building permit
Revision 01: revision to permit 26-140674 BLD/HVA/PLBconverting existing storage room to new washroom. Replacing damaged concrete and asphalt paving
2829 KEELE ST · Nov 17, 2026 · 259 m away - Zoning review
Application Acceptable
2821 KEELE ST · Nov 16, 2026 · 152 m away - Building permit
Proposal for removal and replacement of existing retaining wall.
2793 KEELE ST · Nov 8, 2026 · 15 m away - Zoning review
Closed
1077 WILSON AVE · Nov 4, 2026 · 244 m away - Building permit
Proposed one storey rear addition
25 DUBRAY AVE · Oct 29, 2026 · 297 m away - Zoning review
Closed
2801 KEELE ST · Oct 26, 2026 · 75 m away - Building permit
Localized concrete balcony repairs
2772 KEELE ST · Jul 23, 2026 · 148 m away - Zoning review
Closed
1077 WILSON AVE · Jul 8, 2026 · 244 m away - Building permit
Proposal for demolition of existing dwelling and construction of a new two storey detached SFD
2 HAWKSDALE RD · Jun 4, 2026 · 263 m away
Neighbourhood: Downsview
About the area around the lot, not the lot itself.
- Nearest station
- Wilson Station42 min walk
- Nearest TTC stop
- Keele St at Victory Dr1 min walk
- Nearest cycling route
- Stanley Greene BlvdBi-Directional Cycle Track, 8 min walk
- Nearest traffic count
- 18,972 vehicles in 8 hKeele St / Victory Dr, 50 m away, Mar 22, 2022
- Serious collisions within 500 m
- 62021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 2 with cyclists
- Parks
- Downsview Memorial Parkette3 min walk
- Dubray Parkette5 min walk
- Stanley Greene Park10 min walk
Schools within 1 km
- DOWNSVIEW PUBLIC SCHOOL English Public 4 min walk
- DOWNSVIEW SECONDARY SCHOOL English Public 5 min walk
- MADONNA CATHOLIC SECONDARY SCHOOL English Separate 6 min walk
- ST RAPHAEL CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
- BLAYDON PUBLIC SCHOOL English Public 13 min walk
- PIERRE LAPORTE MDL SCHOOL English Public 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downsview | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $82,000 | $84,500 |
| Households that own their home | 53% | 54% |
| Population (2021) | 17,970 | 16,813 |
| Homes built in 1960 or before | 29% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downsview | City median |
|---|---|---|
| Assault | 811.1 | 636.3 |
| Robbery | 125.8 | 69.5 |
| Shootings | 8.7 | 10.5 |
| Auto theft | 334 | 192.6 |
| Theft over $5,000 | 82.4 | 46.1 |
| Break and enter | 164.8 | 172.8 |
| Theft from vehicles | 203.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.