HousePrecheckCheck an address

2780 Jane StToronto · zoning, lot size and permit records

≈ 90.6 × 106.5 m4,557 m²on Jane Stcorner, also on Eddystone Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 06 192101 (Interior alterations to create a Medical Office to a suite which was previously occupie..., 2006, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 4 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
N50 m
≈ 90.6 m frontage≈ 106.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2006

    Needs a closer look

    Still open in the City's records: 06 192101 (Interior alterations to create a Medical Office to a suite which was previously occupie..., 2006, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 4 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit18 263103Cancelled

    Application to bring existing billboard sign into compliance with the bylaw.***PATTISON OUTDOOR***

    Dec 12, 2018 · 2780 JANE ST
  • Building permit17 257179Closed

    To erect and display two non-illuminated wall signs displaying static copy on the first storey of the southerly elevationmeasuring 1.83 m by 0.61 m at a heigh tof 3.81 m. **LIFE LABS**

    Nov 21, 2017 · 2780 JANE ST
  • Building permit15 227980Closed

    In conjunction with a medical facility on the premises, proposal to erect and display one illuminated ground sign containing two sign faces displayed back to back, each displaying static copy and readograph copy displayed electronically. The sign faces are to measure 2.46 m by 2.60 m at a height of 3.31 m, with the portion of the sign displaying electronic moving copy measuring 0.64 m by 2.46 m.**JANE MEDICAL**

    Dec 11, 2015 · 2780 JANE ST
  • Building permit14 182246Closed

    Proposed renovations to third floor office space (150m2) in units 301B/302/306 for Life Labs.

    Jul 10, 2014 · 2780 JANE ST
  • Building permit12 111677Closed

    Installation of two (2) backflow prevention devices.

    Jan 27, 2012 · 2780 JANE ST
  • Building permit06 192101Inspection

    Interior alterations to create a Medical Office to a suite which was previously occupied by a bank.

    Dec 21, 2006 · 2780 JANE ST
  • Building permit01 127429Closed

    Interior Alterations to Bank

    Apr 17, 2001 · 2780 JANE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,557 m²
Frontage
90.6 mestimated, irregular lot
Depth
106.5 mestimated, irregular lot
Street
Jane St
Corner lot
Yes, also on Eddystone Ave106.5 m along it
Public lane
None
House footprint
829 m²roof up to 19.1 m
Back yard
58.6 mhouse to rear lot line
Side yards
15.3 m and 48.7 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: apple, sargents (36 cm), apple, sargents (34 cm), apple, sargents (32 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
5

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing office space to residential dwelling units.

    10 YORKWOODS GT · Jun 3, 2021 · 427 m away
  • Minor varianceApproved

    To convert the existing storage space into three 1 bedroom units.

    2740 JANE ST · May 20, 2021 · 433 m away
  • Minor varianceApproved

    To construct an enclosure over the existing ramp to the underground parking garage.

    50 DRIFTWOOD AVE · Oct 6, 2016 · 481 m away
  • Minor varianceApproved

    To construct 36 stacked townhouses, on the western portion of the larger site that also contains a 13-storey rental apartment building.

    2850 JANE ST · Feb 25, 2016 · 206 m away
  • Minor varianceApproved

    To convert existing office space into a residental unit on the ground floor of the existing apartment building which will result an increase from 108 to 109 units.

    50 DRIFTWOOD AVE · Apr 30, 2014 · 481 m away

Latest activity nearby

  • Zoning review

    Closed

    95 EDDYSTONE AVE · Sep 18, 2026 · 173 m away
  • Zoning review

    Application On Hold

    2801 JANE ST · Nov 20, 2025 · 222 m away
  • Building permit

    Proposed replacement of Fire Alarm Control Panel and remote annunicator.

    2775 JANE ST · May 28, 2025 · 123 m away
  • Building permit

    Installation of a back water valve, sanitary lateral sewer repair to existing dwelling

    2 ROSEGLEN CRES · Mar 25, 2025 · 227 m away
  • Zoning review

    Closed

    41 EDDYSTONE AVE · Jan 17, 2025 · 136 m away
  • Building permit

    Proposed Installation design of the residential washer & dryer, purchased by the Toronto Fire Services for Fire Station in accordance with Provincial and City requirements.

    2753 JANE ST · Jan 2, 2025 · 296 m away
  • Zoning review

    Cancelled

    22-42 EDDYSTONE AVE · Aug 13, 2024 · 161 m away
  • Development application

    Draft Plan of Condominium to convert 22 units into condominium units.

    22-42 EDDYSTONE AVE · Jul 31, 2024 · 175 m away · City file
  • Building permitsecondary suite

    Proposal to construct interior alterations in the basment to convert SFD into SFD with secondary suite.

    30 ROSEGLEN CRES · Jul 15, 2024 · 162 m away
  • Zoning review

    Closed

    2775 JANE ST · Jun 27, 2024 · 123 m away

Neighbourhood: Glenfield-Jane Heights

About the area around the lot, not the lot itself.

Nearest station
Jane and Finch Station16 min walk
Nearest TTC stop
Jane St at Eddystone Ave2 min walk
Nearest cycling route
Yorkwoods GtSharrows - Wayfinding, 4 min walk
Nearest traffic count
15,750 vehicles in 8 hJane St / Eddystone Ave, 100 m away, Dec 16, 2014
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
Parks
Oakdale Park3 min walk
Yorkwoods Park5 min walk
Firgrove Park6 min walk

Schools within 1 km

  • YORKWOODS PUBLIC SCHOOL English Public 5 min walk
  • OAKDALE PARK MDL SCHOOL English Public 6 min walk
  • FIRGROVE PUBLIC SCHOOL English Public 8 min walk
  • ST FRANCIS DE SALES CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • ST JANE FRANCES CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • STANLEY PUBLIC SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureGlenfield-Jane HeightsMedian neighbourhood
Median household income (2020)$70,500$84,500
Households that own their home52%54%
Population (2021)30,02016,813
Homes built in 1960 or before23%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleGlenfield-Jane HeightsCity median
Assault1083.8636.3
Robbery144.569.5
Shootings25.110.5
Auto theft226.2192.6
Theft over $5,00062.846.1
Break and enter113.1172.8
Theft from vehicles97.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.