Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (34% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (28% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Environmentally Significant Area: Highland Forest/Morningside Park Forest and Highland Creek West
Needs a closer lookThe lot touches an Environmentally Significant Area shown on Official Plan Map 12.
What it means. Development in or next to the area needs an impact study and may be limited.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 12Natural Heritage System (25% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 91 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 25 262817 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 195190 (Replace existing fire alarm panel with new addressable panel, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
5 records on file: more than at 93% of Toronto houses (median 0).
- By-law investigation26 253109 ELS 00 IRClosed
Election Signs: Have been located on public highway adjacent of a voting place, City park or City facility.
Oct 12, 2026 · 277 ORTON PARK RD - Building permit26 195190Permit Issued
Replace existing fire alarm panel with new addressable panel.
Aug 24, 2026 · 277 ORTON PARK RD - By-law investigation25 262817 PRS 00 IRClosed
Property Standards
Dec 5, 2025 · 277 ORTON PARK RD - By-law investigation25 237156 GRA 00 IRClosed
Graffiti
Oct 8, 2025 · 277 ORTON PARK RD - Building permit17 258716Closed
Excavation, concrete footings and slab for new shade structure
Nov 28, 2017 · 277 ORTON PARK RD
Lot facts
- Area
- 11,872 m²
- Frontage
- 121.9 mestimated, irregular lot
- Depth
- 151.6 mestimated, irregular lot
- Street
- Orton Park Rd
- Corner lot
- Yes, also on Botany Hill Rd151.6 m along it
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 2
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 0
Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Replace existing fire alarm panel with new addressable panel.
277 ORTON PARK RD · Aug 24, 2026 · 56 m away - Building permit
supply and install backwater valve
135 MERKLEY SQ · Apr 13, 2026 · 291 m away - Building permit
Proposal to construct a two storey garden suite complete with a basement walkout.
127 SLAN AVE · Sep 17, 2025 · 144 m away - Building permit
Proposal for interior alterations to convert existing dwelling to a 2 unit dwelling and construct basement walkout.
126 SLAN AVE · Sep 16, 2025 · 120 m away - Building permit
Proposal to construct a two storey garden suite complete with a basement walkout.
127 SLAN AVE · Aug 15, 2025 · 144 m away - Building permit
Proposal to convert existing finished basement to secondary unit basement
19 STARLAKE DR · Jun 20, 2024 · 165 m away - Building permit
Proposal to convert existing finished basement to secondary unit basement
19 STARLAKE DR · Jun 4, 2024 · 165 m away - Building permit
Addition to the east of the dwelling at basement and main floor; second storey addition on the east extension; to provide a new unit in the basement extended area(total two units in the basement-triplex) and alterations to the main floor layout
24 MONTAVISTA ST · Feb 2, 2024 · 264 m away - Zoning review
Closed
24 MONTAVISTA ST · Nov 9, 2022 · 264 m away - Zoning review
Cancelled
109 BOTANY HILL RD · Aug 25, 2022 · 216 m away
Neighbourhood: Morningside
About the area around the lot, not the lot itself.
- Nearest station
- Guildwood GO Station39 min walk
- Nearest TTC stop
- Orton Park Rd at Botany Hill Rd North Side1 min walk
- Nearest cycling route
- Morningside Park Trl-West sideMulti-Use Trail, 1 min walk
- Nearest traffic count
- 3,732 vehicles in 8 hOrton Park Rd / Botany Hill Rd / Slan Ave, 110 m away, Sep 29, 2022
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Botany Hill Park1 min walk
- Morningside Park1 min walk
- Heather Heights Park5 min walk
Schools within 1 km
- HENRY HUDSON SR PUBLIC SCHOOL English Public 6 min walk
- HEATHER HEIGHTS JR & BEN HEPPNER VM ACADEMY English Public 7 min walk
- GEORGE B LITTLE PUBLIC SCHOOL English Public 11 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Morningside | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $85,000 | $84,500 |
| Households that own their home | 60% | 54% |
| Population (2021) | 17,660 | 16,813 |
| Homes built in 1960 or before | 21% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Morningside | City median |
|---|---|---|
| Assault | 646.8 | 636.3 |
| Robbery | 56.9 | 69.5 |
| Shootings | 15.5 | 10.5 |
| Auto theft | 217.3 | 192.6 |
| Theft over $5,000 | 36.2 | 46.1 |
| Break and enter | 77.6 | 172.8 |
| Theft from vehicles | 108.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.