Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (100% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 6584 open orders or by-law investigations
Needs a closer lookNot resolved in the City's records: 26 237034 PRS 00 IV (Order Issued Property Standards: Garbage chute is not maintained in a clean and odour f..., 2026, status Rescheduled); 26 229243 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 221871 PRS 00 IV (Order Issued Property Standards: Floor and/or floor covering not kept free from holes,..., 2026, status Rescheduled); and 1 more.
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsNatural Heritage System (96% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 927 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Notice Issued Adequate Heat, Order Issued Property Standards, Property Standards): 26 169963 PRS 00 IR (Property Standards, 2026); 26 176343 PRS 00 IV (Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged..., 2026); 26 165697 PRS 00 IR (Property Standards, 2026); and 24 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsRental building evaluation: 97 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (19 storeys, 343 units, built 1976).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
45 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 237004 WST 00 IVClosed
Notice Issued Waste
Sep 14, 2026 · 2757 KIPLING AVE - By-law investigation26 236993 WST 00 IRClosed
Waste
Sep 14, 2026 · 2757 KIPLING AVE - By-law investigation26 237034 PRS 00 IVRescheduled
Order Issued Property Standards: Garbage chute is not maintained in a clean and odour free condition. Namely, any garbage on chute room floor.; Garbage chute system originally installed in the multiple-dwelling is not maintained operative. Namely, garbage chute hopper doors self-closing mechanism not fu; Previously finished wall(s) have marks, stains, graffiti, smoke damage, painted slogans and/or other defacements. Namely, marking and scuffing on 13th floor hal; Wall(s) not maintained clean. Namely, stains on 13th floor hallway walls.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials. Namely bubbling and peeling paint on 13th floor hallway walls.
Aug 31, 2026 · 2757 KIPLING AVE - By-law investigation26 229243 PRS 00 IRRescheduled
Property Standards
Aug 31, 2026 · 2757 KIPLING AVE - By-law investigation26 221871 PRS 00 IVRescheduled
Order Issued Property Standards: Floor and/or floor covering not kept free from holes, stains, rubbish and debris. Namely, loose or missing floor tiles in living room.; Interior door(s), frames(s), glass pane(s), and/or hardware not maintained in good repair. Namely, damaged bedroom doors and front door, including front door tr; Previously finished surface(s) have marks, stains, graffiti, smoke damage, painted slogans and/or other defacements. Namely, staining on bathroom ceiling.; The cupboard is not maintained in good repair and good working order. Namely, missing knobs, loose cabinet doors, drawers not closing properly in kitchen.; The electrical connections are not maintained in good working order. Namely, missing electrical cover.; The ventilation system or unit is not kept in good repair and maintained in good working condition at all times. Namely, loose ventilation cover in bathroom.
Aug 11, 2026 · 2757 KIPLING AVE - By-law investigation26 217716 PRS 00 IRRescheduled
Property Standards
Aug 11, 2026 · 2757 KIPLING AVE - By-law investigation26 169963 PRS 00 IRClosed
Property Standards
May 29, 2026 · 2757 KIPLING AVE - By-law investigation26 176343 PRS 00 IVClosed
Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.Areas of the ceiling have damaged or detiorated materials in the form of peelin; Repair(s) does not reasonably match existing wall(s)Some walls were not painted the same colour as the surrounding wall; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.Several Areas of the walls in the unit have the following. -Peeling paint -bubb
May 22, 2026 · 2757 KIPLING AVE
Show 37 older records
- By-law investigation26 165697 PRS 00 IRClosed
Property Standards
May 22, 2026 · 2757 KIPLING AVE - By-law investigation26 143415 PRS 00 IRClosed
Property Standards
Apr 14, 2026 · 2757 KIPLING AVE - By-law investigation26 123696 HEA 00 IVClosed
Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one (21) degrees Celsius.
Mar 1, 2026 · 2757 KIPLING AVE - By-law investigation26 123009 HEA 00 IRClosed
Adequate Heat
Mar 1, 2026 · 2757 KIPLING AVE - By-law investigation26 121042 PRS 00 IVClosed
Order Issued Property Standards: Previously finished surface(s) have marks, stains, graffiti, smoke damage, painted slogans and/or other defacements.; Previously finished wall(s) have marks, stains, graffiti, smoke damage, painted slogans and/or other defacements.; The supplied facility in or on the property is not constructed, installed and/or maintained so that it will function safely and effectively.; Vanity is not maintained in a satisfactory condition.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.
Feb 17, 2026 · 2757 KIPLING AVE - By-law investigation26 118081 PRS 00 IRClosed
Property Standards
Feb 17, 2026 · 2757 KIPLING AVE - By-law investigation26 108509 HEA 00 IVClosed
Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one (21) degrees Celsius.
Jan 22, 2026 · 2757 KIPLING AVE - By-law investigation26 107639 HEA 00 IRClosed
Adequate Heat
Jan 22, 2026 · 2757 KIPLING AVE - By-law investigation25 267771 PRS 00 IVClosed
Order Issued Property Standards: The dwelling does not have a heating system capable of maintaining a room temperature of twenty-one degrees Celsius(21?C).
Dec 18, 2025 · 2757 KIPLING AVE - By-law investigation25 267738 PRS 00 IRClosed
Property Standards
Dec 18, 2025 · 2757 KIPLING AVE - By-law investigation25 264601 HEA 00 IRClosed
Adequate Heat
Dec 9, 2025 · 2757 KIPLING AVE - By-law investigation25 255543 PRS 00 IVClosed
Order Issued Property Standards: The cupboard is not maintained in good repair and good working order.; The kitchen fixture(s) and/or fitting is not maintained in good repair and good working order.; The supplied facility in or on the property is not kept in a satisfactory working condition.
Nov 7, 2025 · 2757 KIPLING AVE - By-law investigation25 250856 PRS 00 IRClosed
Property Standards
Nov 7, 2025 · 2757 KIPLING AVE - By-law investigation25 246594 PRS 00 IVClosed
Order Issued Property Standards: Ceiling not maintained clean.; The supplied facility in or on the property is not constructed, installed and/or maintained so that it will function safely and effectively.; Wall(s) not maintained clean.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.
Oct 27, 2025 · 2757 KIPLING AVE - By-law investigation25 245610 PRS 00 IRClosed
Property Standards
Oct 27, 2025 · 2757 KIPLING AVE - By-law investigation25 240439 HEA 00 IRClosed
Adequate Heat
Oct 16, 2025 · 2757 KIPLING AVE - By-law investigation25 240435 PRS 00 IRClosed
Property Standards
Oct 16, 2025 · 2757 KIPLING AVE - By-law investigation25 206605 PRS 00 IRClosed
Property Standards
Aug 7, 2025 · 2757 KIPLING AVE - By-law investigation25 136762 PRS 00 IRClosed
Property Standards
Mar 30, 2025 · 2757 KIPLING AVE - By-law investigation24 253413 PRS 00 IRClosed
Property Standards
Dec 24, 2024 · 2757 KIPLING AVE - By-law investigation24 250817 PRS 00 IVClosed
Order Issued Property Standards: Door providing access to a parking or storage garage has not been equipped with a latch that will prevent entry to the garage except by the use of a key, coded ; The exterior door is not capable of being locked or otherwise secured from inside the building. Namely, rear exterior door to the garbage bins.
Dec 3, 2024 · 2757 KIPLING AVE - By-law investigation24 246239 HEA 00 IRClosed
Adequate Heat
Dec 3, 2024 · 2757 KIPLING AVE - By-law investigation24 246118 PRS 00 IRClosed
Property Standards
Dec 3, 2024 · 2757 KIPLING AVE - By-law investigation24 247741 HEA 00 IVClosed
Notice Issued Adequate Heat
Nov 29, 2024 · 2757 KIPLING AVE - By-law investigation24 244975 HEA 00 IRClosed
Adequate Heat
Nov 29, 2024 · 2757 KIPLING AVE - Building permit22 104246Cancelled
HVAC - Proposed Legalization of 5 exist'g units that were built by previous owner.
Jan 14, 2022 · 2757 KIPLING AVE - Building permit20 195637Closed
Proposal for concrete repairs and waterprooing to underground garage, podium decks and drive ramps at 2737 and 2757 Kipling Ave.
Nov 4, 2020 · 2757 KIPLING AVE - Building permit20 136876Closed
Proposal for localized concrete repairs, door replacement, waterproofing replacement.
May 25, 2020 · 2757 KIPLING AVE - Building permit19 226151Closed
Localized concrete and waterproofing repairs at the podium deck & P1 parking garage level at the electrical room
Oct 24, 2019 · 2757 KIPLING AVE - Building permit19 145391Closed
Proposed balcony rehabilitation, localized balcony slab and shear wall concrete repairs, total of 324 units.
Jun 14, 2019 · 2757 KIPLING AVE - Building permit19 141857Closed
Proposal to install a backflow prevention device in an existing apartment building
May 13, 2019 · 2757 KIPLING AVE - Building permit17 125764Closed
Fire alarm panel replacement, voice communication control systems and addressable modules/devices. All existing conventional devices and fire alarm speakers remain existing
Apr 4, 2017 · 2757 KIPLING AVE - Building permit09 165788Closed
Underground parking garage repairs at 3 levels
Sep 8, 2009 · 2757 KIPLING AVE - Building permit09 154857Closed
To repair 252 balcony concrete floors at front elevation of existing apartment building.
Aug 10, 2009 · 2757 KIPLING AVE - Building permit03 187954Closed
Balcony repairs to apartment building. Total of 90 balcony surface repairs. See lead file permit 03 184511 for drawings .
May 20, 2004 · 2757 KIPLING AVE - Building permit01 128885Closed
Balcony repairs to apartment building.
May 8, 2001 · 2757 KIPLING AVE - Building permit00 172039Closed
Balcony and outside walls repairs to apartment residential building.
Dec 6, 2000 · 2757 KIPLING AVE
Check before you build
Site-specific exception 900.8.10(92)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Former City of Etobicoke By-law No. 1807.
Lot facts
- Area
- 17,597 m²
- Frontage
- 167.1 mestimated, irregular lot
- Depth
- 136.8 mestimated, irregular lot
- Street
- Kipling Ave
- Corner lot
- No
- Public lane
- None
- House footprint
- 2,105 m²roof up to 64.8 m
- Back yard
- 38 mhouse to rear lot line
- Side yards
- 39.9 m and 44.7 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- 20%
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 0
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To convert the existing storage space and vacant areas into 8 new dwelling units. A total of 333 dwelling units will be provided.
2777 KIPLING AVE · Jun 30, 2022 · 154 m away
Latest activity nearby
- Zoning review
Not Started
2737 KIPLING AVE · Oct 29, 2026 · 165 m away - Building permit
Proposed interior alterations for loadbearing wall removal and construction of new bathroom on main floor
55 MARYHILL DR · Sep 26, 2025 · 198 m away - Building permit
Proposal for multiple projects (basement walkout stair and interior alterations).
25 MOFFATT CRT · Aug 11, 2025 · 154 m away - Building permit
Proposed interiro alterations
20 BEACONHILL RD · Jul 30, 2025 · 279 m away - Building permit
Proposeed Interior alterations and construct garage door from existing sunroom.
20 BEACONHILL RD · Jun 27, 2025 · 279 m away - Building permit
Interior alterations and proposed garage door from existing sunroom
20 BEACONHILL RD · Jun 4, 2025 · 279 m away - Building permit
Proposal for repairs and waterproofing to underground garage.
2777 KIPLING AVE · Nov 20, 2024 · 154 m away - Building permit
Proposal for a backwater valve.
2 BEACONHILL RD · Jun 19, 2024 · 138 m away - Building permit
REVISION#1: LEVEL 1 AND 2 PLAN LAYOUT CHANGESPROPOSED: INTERIOR ALTERATIONS TO CREATE A SECOND AND THIRD DWELLING UNIT TO THE EXISTING SINGLE FAMILY DWELLING.
3 BEACONHILL RD · Apr 25, 2024 · 183 m away - Building permit
PROPOSED: Sprinkler System Installation
2737 KIPLING AVE · Nov 10, 2023 · 165 m away
Neighbourhood: Mount Olive-Silverstone-Jamestown
About the area around the lot, not the lot itself.
- Nearest station
- Stevenson Station21 min walk
- Nearest TTC stop
- Kipling Ave at Beaconhill Rd2 min walk
- Nearest cycling route
- Kipling Ave Bicycle TrlMulti-Use Trail - Boulevard, 1 min walk
- Nearest traffic count
- 6,866 vehicles in 8 hKipling Ave / Beaconhill Rd / Kipling Ave Bicycle Trl, 140 m away, Feb 8, 2022
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Rowntree Mills Park1 min walk
- North Kipling Park4 min walk
- North Humber Park4 min walk
Schools within 1 km
- NORTH KIPLING JR MDL SCHOOL English Public 6 min walk
- VENERABLE JOHN MERLINI CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
- JOHN D PARKER JR SCHOOL English Public 13 min walk
- ST ANGELA CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
- NORTH ALBION COLLEGIATE INSTITUTE English Public 14 min walk
- SMITHFIELD MDL SCHOOL English Public 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Mount Olive-Silverstone-Jamestown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,500 | $84,500 |
| Households that own their home | 46% | 54% |
| Population (2021) | 31,345 | 16,813 |
| Homes built in 1960 or before | 14% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Mount Olive-Silverstone-Jamestown | City median |
|---|---|---|
| Assault | 788.6 | 636.3 |
| Robbery | 107.3 | 69.5 |
| Homicide | 2.9 | 5.3 |
| Shootings | 20.3 | 10.5 |
| Auto theft | 275.4 | 192.6 |
| Theft over $5,000 | 26.1 | 46.1 |
| Break and enter | 55.1 | 172.8 |
| Theft from vehicles | 130.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.