HousePrecheckCheck an address

275 Yorkland RdToronto · zoning, lot size and permit records

≈ 49.5 × 90.1 m3,513 m²on Herons Hill Waycorner, also on Yorkland Rd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.4 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 12 257246 (Sprinklers for new 27 storey residential tower with 318 units and 5 levels of under gro..., 2013, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 49.5 m frontage≈ 90.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2013

    Needs a closer look

    Still open in the City's records: 12 257246 (Sprinklers for new 27 storey residential tower with 318 units and 5 levels of under gro..., 2013, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 192304 PRS 00 IV (Order Issued Property Standards: Floor and/or floor covering not kept in a clean and sa..., 2026); 26 168827 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 192304 PRS 00 IVClosed

    Order Issued Property Standards: Floor and/or floor covering not kept in a clean and sanitary condition. Namely, the carpet in one bedroom was not in sanitary condition.

    May 28, 2026 · 275 YORKLAND RD
  • By-law investigation26 168827 PRS 00 IRClosed

    Property Standards

    May 28, 2026 · 275 YORKLAND RD
  • Building permit20 163665Closed

    Proposed localized repairs to the underground parking garage including, concrete repairs, waterproofing repairs, and expansion joint repairs

    Aug 4, 2020 · 275 YORKLAND RD
  • Building permit14 265032Closed

    Proposed installation of ten (10) electromagnetic locking devices.

    Dec 22, 2014 · 275 YORKLAND RD
  • Zoning review14 122927 PCDClosed
    Apr 24, 2014 · 275 YORKLAND RD
  • Development application14 116727 NNY 33 CDClosed

    This is an application to register a standard condominium comprised of a 33-storey tower, with five levels of underground parking, having a total of 402 residential units, and 453 parking spaces.

    Feb 12, 2014 · 275 YORKLAND RD
  • Building permit12 257246Inspection

    Sprinklers for new 27 storey residential tower with 318 units and 5 levels of under ground parking.

    Nov 7, 2013 · 275 YORKLAND RD
  • Building permit10 272513Closed

    HVAC - New 27 storey residential tower with 318 units and 5 levels of under ground parking. Increased to 33 storeys and 402 units and 5 levels of underground parking.

    Oct 2, 2013 · 275 YORKLAND RD
Show 5 older records
  • Development application13 219804 NNY 33 OZClosed

    To amend the Official Plan and Zoning By-law Section 37 provisions dealing with the timing for construction of a commercial building on the south side of the new public road prior to occupancy of the third residential building.

    Aug 13, 2013 · 2025 SHEPPARD AVE E
  • Development application13 200501 NNY 33 SAClosed

    Revised plans date stamped July 3, 2014

    Jul 8, 2013 · 2025 SHEPPARD AVE E
  • Building permit11 204544Cancelled

    To erect and display five ground signs each on the northery, southerly and westerly frontage of the property in conjunction with a proposed condominium sales centre. **Yorkland at Heron's Hill**

    Jun 1, 2011 · 275 YORKLAND RD
  • Zoning review10 172370 PSPCancelled
    May 10, 2010 · 275 YORKLAND RD
  • Development application10 165327 NNY 33 SAClosed

    Construction of 30-storey condominium building and a 3-4 storey podium with 366 residential units. This is the third and final phase of the mixed-use development to the north of the new public road through the site.

    Apr 28, 2010 · 275 YORKLAND RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,513 m²
Frontage
49.5 mestimated, irregular lot
Depth
90.1 mestimated, irregular lot
Street
Herons Hill Way
Corner lot
Yes, also on Yorkland Rd90.1 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: elm, princeton (8 cm), maple, freeman marmo (8 cm), maple, freeman marmo (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit an increase in the total number of storeys for Building "A" and Building "B", as indicated in the attached Schedule, as portions of the subject buildings include a mezzanine level above the ground floor, which under the North York Zoning By-law, are considered as a storey.

    2135 SHEPPARD AVE E · Nov 19, 2020 · 405 m away
  • Minor varianceApproved

    To permit an increase to the proposed number of units and a reduction in the number of resident parking spaces.

    2135 SHEPPARD AVE E · Nov 8, 2017 · 405 m away
  • Minor varianceApproved

    To construct an enclosed vehicular access ramp for Building 'D' Phase One.

    2135 SHEPPARD AVE E · Jun 22, 2017 · 405 m away
  • Minor varianceApproved

    To permit 104 parking spaces for the commercial school area.

    271 YORKLAND BLVD · Sep 8, 2016 · 185 m away
  • Minor varianceRefused

    To permit an increase in the number of new dwelling units (16) located within Blocks "A" and "E" in the Parkway Forest Master Plan, prior to the removal of the third holding symbol ("H-3"). A total of 1,226 residential units are proposed prior to the removal of the "H-3" symbol. Upon the removal of the "H-3" holding symbol by City Council up to 1,556 residential units may be constructed.

    106 PARKWAY FOREST DR · May 28, 2014 · 393 m away

Latest activity nearby

  • Building permit

    Proposal for interior alterations with mechanical, electrical and plumbing work to suit new layout in suite 201 for the Terry Fox Foundation.

    2005 SHEPPARD AVE E · Nov 19, 2026 · 129 m away
  • Building permit

    INTERIOR ALTERATIONS WITH MECHANICAL, ELECTRICAL AND PLUMBING WORK TO SUIT NEW LAYOUT IN SUITE 401 FOR THE TERRY FOX FOUNDATION.

    2001 SHEPPARD AVE E · Aug 12, 2026 · 107 m away
  • Building permit

    Rev 01; Modification to 5th floor hvac HVAC - Proposal for interior alterations to existing office space - Floor 6, "GM Financial"

    2001 SHEPPARD AVE E · Jul 31, 2026 · 107 m away
  • Zoning review

    Closed

    259 YORKLAND RD · Jul 24, 2026 · 121 m away
  • Building permit

    Proposal for interior alterations of existing office suites. Work includes new interior partitions for offices and meeting rooms within existing spaces.

    2001 SHEPPARD AVE E · Jul 16, 2026 · 107 m away
  • Building permit

    Proposed addition of new demising wall in existing office (Unit 401-402)

    2001 SHEPPARD AVE E · Jun 18, 2026 · 107 m away
  • Building permit

    Addition of new demising wall in existing office space - UNIT 401/402

    2001 SHEPPARD AVE E · Jun 5, 2026 · 107 m away
  • Building permit

    HVAC - PROPOSED INTERIOR ALTERATIONS INCLUDING NEW PARTITIONS AND DOOR ASSEMBLIES

    2001 SHEPPARD AVE E · Apr 15, 2026 · 107 m away
  • Building permit

    Proposal for interior alterations to office

    2005 SHEPPARD AVE E · Mar 2, 2026 · 129 m away
  • Building permit

    Proposal for interior alterations to existing office

    2001 SHEPPARD AVE E · Oct 28, 2025 · 107 m away

Neighbourhood: Henry Farm

About the area around the lot, not the lot itself.

Nearest station
Don Mills Station12 min walk
Nearest TTC stop
1900 Sheppard Ave East2 min walk
Nearest traffic count
9,900 vehicles in 8 hYorkland Rd / Herons Hill Way, 60 m away, Jul 16, 2012
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
David Caplan Park6 min walk
Old Sheppard Park6 min walk
Parkway Forest Park7 min walk

Schools within 1 km

  • NORTH TORONTO CHRISTIAN SCHOOL Private 3 min walk
  • CESTAR HIGH SCHOOL Private 3 min walk
  • ABU HURAIRA ISLAMIC CENTRE AND ACADEMY Private 5 min walk
  • OXFORD COLLEGE OF CANADA SECONDARY SCHOOL Private 7 min walk
  • MUIRHEAD PUBLIC SCHOOL English Public 7 min walk
  • ELITE ACADEMIC SECONDARY SCHOOL Private 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHenry FarmMedian neighbourhood
Median household income (2020)$79,500$84,500
Households that own their home39%54%
Population (2021)19,84016,813
Homes built in 1960 or before5%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHenry FarmCity median
Assault286.8636.3
Robbery51.169.5
Homicide3.95.3
Shootings3.910.5
Auto theft192.5192.6
Theft over $5,00027.546.1
Break and enter55172.8
Theft from vehicles94.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.