Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 open by-law investigation
Needs a closer lookNot resolved in the City's records: 26 240920 PRS 00 IR (Property Standards, 2026, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations14 building permits open, the oldest since 1996
Needs a closer lookStill open in the City's records: 23 183207 (Proposed outdoor generator installation to replace the existing, 2023, status Permit Issued); 23 183201 (Proposed outdoor generator installation to replace the existing, 2023, status Permit Issued); 20 207448 (Proposal to replace all main horizontal sanitary piping and some portion of sanitary ri..., 2020, status Permit Issued); and 11 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)19 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 239482 PRS 00 IR (Property Standards, 2026); 26 213030 PRS 00 IR (Property Standards, 2026); 26 202635 PRS 00 IV (Order Issued Property Standards: The storm drain is not being maintained free from defe..., 2026); and 16 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 130858 (Scope includes space heating system associated with the heating boilers, domestic hot w..., 2026); 25 264230 (Proposal for replacement of all plumbing and sanitary risers and branches piping from 3..., 2026); 25 101520 (Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Pe..., 2025); and 2 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications17 development applications open within 300 m
Good to know17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 82 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (16 storeys, 299 units, built 1964).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
76 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 240920 PRS 00 IRRescheduled
Property Standards
Sep 21, 2026 · 275 SHUTER ST - By-law investigation26 239482 PRS 00 IRClosed
Property Standards
Sep 17, 2026 · 275 SHUTER ST - By-law investigation26 213030 PRS 00 IRClosed
Property Standards
Aug 2, 2026 · 295 SHUTER ST - By-law investigation26 202635 PRS 00 IVClosed
Order Issued Property Standards: The storm drain is not being maintained free from defect and/or obstructions.Namely, the drain in the playground area is not working as intended.
Jul 13, 2026 · 275 SHUTER ST - By-law investigation26 201112 PRS 00 IRClosed
Property Standards
Jul 13, 2026 · 275 SHUTER ST - By-law investigation26 193474 PRS 00 IRClosed
Property Standards
Jun 29, 2026 · 275 SHUTER ST - By-law investigation26 186953 PRS 00 IRClosed
Property Standards
Jun 18, 2026 · 275 SHUTER ST - By-law investigation26 184836 PRS 00 IRClosed
Property Standards
Jun 15, 2026 · 275 SHUTER ST
Show 68 older records
- By-law investigation26 172189 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 295 SHUTER ST - By-law investigation26 172188 000 00 IRClosed
Property Standards
Jun 1, 2026 · 295 SHUTER ST - Minor varianceA0445/26TEYPendingMay 22, 2026 · 285 SHUTER ST
- By-law investigation26 143819 PRS 00 IRClosed
Property Standards
Apr 15, 2026 · 295 SHUTER ST - Building permit26 130858Permit Issued
Scope includes space heating system associated with the heating boilers, domestic hot water system (Including but not limited to associated domestic hot water boilers, piping infrastructure, gas service, venting, combustion air, recirculation pumps, drains, valves, sensors, gauges, DHW storage tanks, etc.) All associated electrical infrastructure to support the systems above. Upgrade the existing BAS to monitor and control all mechanical equipment in the buildings. All associated control infrastructure to support the systems above. All associated structural components to support the systems above.
Apr 13, 2026 · 275 SHUTER ST - By-law investigation26 126483 PRS 00 IRClosed
Property Standards
Mar 9, 2026 · 275 SHUTER ST - Building permit25 264230Inspection
Proposal for replacement of all plumbing and sanitary risers and branches piping from 3rd floor to penthouse and in all tenant units.
Jan 23, 2026 · 285 SHUTER ST - By-law investigation26 107222 PRS 00 IRClosed
Property Standards
Jan 20, 2026 · 275 SHUTER ST - By-law investigation25 258524 PRS 00 IRClosed
Property Standards
Nov 25, 2025 · 275 SHUTER ST - By-law investigation25 258024 PRS 00 IRClosed
Property Standards
Nov 24, 2025 · 275 SHUTER ST - By-law investigation25 255775 PRS 00 IRClosed
Property Standards
Nov 19, 2025 · 275 SHUTER ST - By-law investigation25 222629 PRS 00 IRClosed
Property Standards
Sep 9, 2025 · 275 SHUTER ST - By-law investigation25 189926 PRS 00 IRClosed
Property Standards
Jul 8, 2025 · 275 SHUTER ST - By-law investigation25 180614 PRS 00 IRClosed
Property Standards
Jun 20, 2025 · 275 SHUTER ST - Building permit25 101520Inspection
Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Penthouse Community Room and Laundry room
Apr 4, 2025 · 275 SHUTER ST - Building permit25 113113Under Review
Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Penthouse Community Room and Laundry room
Feb 5, 2025 · 275 SHUTER ST - By-law investigation25 108434 HEA 00 IRClosed
Adequate Heat
Jan 24, 2025 · 275 SHUTER ST - Building permit25 106634Refusal Notice
Replacement of all the boilers and equipment in mechanical room.
Jan 20, 2025 · 275 SHUTER ST - Building permit23 183207Permit Issued
Proposed outdoor generator installation to replace the existing.
Sep 26, 2023 · 275 SHUTER ST - Building permit23 183201Permit Issued
Proposed outdoor generator installation to replace the existing.
Sep 22, 2023 · 275 SHUTER ST - Building permit22 192367Closed
PROPOSAL FOR INTERIOR & EXTERIOR REPAIRS FOR THE RESTORATION OF THE CONCRETE ROOF OF THE EXISTING HYDRO VAULT, LOCATED AT & BELOW GRADE.
Oct 24, 2022 · 295 SHUTER ST - Building permit22 192349Closed
PROPOSAL FOR INTERIOR & EXTERIOR REPAIRS FOR THE RESTORATION OF THE CONCRETE ROOF OF THE EXISTING HYDRO VAULT, LOCATED AT & BELOW GRADE.
Oct 24, 2022 · 285 SHUTER ST - Zoning review21 219471 ZPRClosedSep 29, 2021 · 275 SHUTER ST
- Building permit20 207463Closed
Proposal to replace all main horizontal sanitary piping and some portion of sanitary risers in the basement, main floor and second floor. replacement of all kitchen sinks, water closets, lavatories, and shower heads c/w new isolation valves and access doors within dwelling units. 295 Shuter Street
Nov 25, 2020 · 275 SHUTER ST - Building permit20 207457Closed
Proposal to replace all main horizontal sanitary piping and some portion of sanitary risers in the basement, main floor and second floor. replacement of all kitchen sinks, water closets, lavatories, and shower heads c/w new isolation valves and access doors within dwelling units. 285 Shuter Street
Nov 24, 2020 · 275 SHUTER ST - Building permit20 207448Permit Issued
Proposal to replace all main horizontal sanitary piping and some portion of sanitary risers in the basement, main floor and second floor. replacement of all kitchen sinks, water closets, lavatories, and shower heads c/w new isolation valves and access doors within dwelling units. 275 Shuter Street
Nov 17, 2020 · 275 SHUTER ST - Building permit20 167853Inspection
Proposal to construct canopy in the existing bike enclosure for existing apartment building
Sep 16, 2020 · 275 SHUTER ST - Building permit20 167831Permit Issued
Proposal to construct 2 prefabricated aluminum bike rack structures for existing apartment building
Aug 12, 2020 · 275 SHUTER ST - Building permit20 167820Permit Issued
Proposal to construct 2 prefabricated aluminum bike rack structures for existing apartment building
Aug 12, 2020 · 275 SHUTER ST - Building permit20 165502Cancelled
Proposed interior alterations to suit new Toronto Community Tenant Services office
Jul 9, 2020 · 285 SHUTER ST - Building permit19 102857Inspection
Proposal to install single maglock on one door located on the gorund floor
Feb 25, 2019 · 285 SHUTER ST - Building permit19 115363Inspection
Installation of single maglock on one door, located on the ground floor
Feb 21, 2019 · 275 SHUTER ST - Building permit19 103067Inspection
Install 1 maglock for TCHC on one door located on the ground floor
Feb 19, 2019 · 275 SHUTER ST - Building permit19 102780Cancelled
Installation of two single maglocks on one door, located on the ground floor
Jan 9, 2019 · 275 SHUTER ST - Building permit18 265026Cancelled
Proposed 2 electromagnetic locks on ground floor.
Dec 5, 2018 · 275 SHUTER ST - Building permit18 265020Cancelled
Proposed 2 maglocks on ground floor.
Dec 5, 2018 · 285 SHUTER ST - Building permit18 265013Cancelled
Proposed 2 electromagnetic locks at ground level.
Dec 5, 2018 · 295 SHUTER ST - Building permit18 156663Closed
Installation of 250 kW CHeP System
Jun 12, 2018 · 295 SHUTER ST - Building permit18 156655Closed
Installation of 250 kW CHeP System
Jun 12, 2018 · 285 SHUTER ST - Building permit18 137343Closed
Installation of 250 KW CHEP System
Apr 18, 2018 · 275 SHUTER ST - Building permit18 133839Closed
Proposed alteration of heating distribution system to accept future CHP systems.
Apr 18, 2018 · 275 SHUTER ST - Building permit18 130253Closed
Proposal to install total of 4 maglocks, one on penthouse an 3 on first floor
Mar 20, 2018 · 285 SHUTER ST - Building permit18 130224Closed
Installation of 4 electromagnetic maglocks, 1 on the penthouse and 3 on the first floor
Mar 20, 2018 · 275 SHUTER ST - Building permit17 278730Closed
Proposal to install 4 maglocks in existing apartment building. Convenience address is 295 SHUTER ST.
Jan 30, 2018 · 275 SHUTER ST - Building permit16 260577Closed
Applicant proposed to remove and replace the existing fire alarm panel with a new fire alarm panel.
Dec 14, 2016 · 295 SHUTER ST - Building permit16 260036Closed
Fire Alarm panel replacement to Apartment Building.
Dec 14, 2016 · 275 SHUTER ST - Building permit16 259989Closed
FIRE PANEL REPLACEMENT
Dec 13, 2016 · 275 SHUTER ST - Building permit15 168675Closed
UPGRADE EXISTING OFFICE SPACE TO INCLUDE NEW BARRIER FREE WASHROOM
Jun 19, 2015 · 275 SHUTER ST - Building permit14 219743Closed
Hydro vault structural repair.
Oct 8, 2014 · 275 SHUTER ST - Building permit13 258044Inspection
Proposal to install a gas fired generator at grade in the generator room on the south side of the property. Proposal to include mechanical exhaust.
Nov 27, 2013 · 275 SHUTER ST - Building permit11 231958Closed
REVISION TO EXISTING BUILDING PERMIT - STRUCTURAL REVISION FOR SOLAR WALL PERMIT INCLUDES 275, 285 and 295Shuter st. Permit for structural support for new mechanical equipment. See seperate mechanial permit for other information. SEE 11 231977 MSA
Oct 24, 2011 · 275 SHUTER ST - Building permit11 273580Closed
Proposal to install 1 backflow prevention device in an existing apartment building.
Sep 26, 2011 · 275 SHUTER ST - Building permit11 231977Closed
PERMIT INCLUDES 275, 285 and 295 Shuter st. New mechanical permit for air handling equipment and solar wall. - see 11 231958 BLD for building permit. Permit for structural support for new mechanical equipment. See seperate mechanial permit for other information.
Aug 12, 2011 · 275 SHUTER ST - Building permit10 319763Closed - Dormant
HVAC - Interior alteration to the Penthouse level area to provide accessible access to the area and a retrofit of the ground floor washroom.. This proposal also includes the revamping of five (5) accessible parking spots., There are five (5) accessible spots existing on the property.
Jan 11, 2011 · 275 SHUTER ST - Building permit10 319703Closed - Dormant
HVAC - Interior alteration to the Penthouse level area to provide accessible access to the area and a retrofit of the ground floor washroom.. This proposal also includes the revamping of seven (7) accessible parking spots for the building known as 295 Shuter Street which is a convenience address for 275 Shuter Street., there are seven(7) accessible spots existing on the property.
Jan 11, 2011 · 295 SHUTER ST - Building permit10 319753Inspection
Interior alteration to the Penthouse level area to provide accessible access retrofit to the washroom located at the east side of the penthouse level close to the multi purpose room. This is a convenience address for 275 Shuter Street.
Dec 30, 2010 · 285 SHUTER ST - Building permit09 197472Closed
Proposal to install 1 back flow preventor in existing apartment building. Convenience address - 295 Shuter St.
Dec 29, 2009 · 275 SHUTER ST - Building permit07 184890Closed - Dormant
HVAC - Make interior alterations to lobby & superintendant office.
May 7, 2007 · 275 SHUTER ST - Building permit06 131328Closed
Make concrete repairs to podium deck(s) & waterproof.
May 8, 2006 · 275 SHUTER ST - Building permit02 131681Closed
Balcony Repairs - 130 balconies
Jun 19, 2002 · 275 SHUTER ST - Building permit01 196514Closed
install 6" water pipe and fire hydrant on private property. PLANS (Conv. address is 285 Shuter St)
Nov 27, 2001 · 275 SHUTER ST - Building permit00 329947Inspection
repair 130 balconies--work being done at 295 shuter st. --conv. address
Nov 15, 2000 · 275 SHUTER ST - Building permit00 124806Closed - Dormant
heating system upgrade, retrofit. replace hot water piping and radiators throughout building. ( conv. address is 285 Shuter St)fees based on flat rate of $250.00 plus $60.00 per hour.
May 11, 2000 · 275 SHUTER ST - Building permit97 021740Closed
REPALCE EXISTING HEATING PIPE CHASES THROUGH-OUT THE BUILDING JB
Oct 2, 1997 · 275 SHUTER ST - Building permit96 021548Inspection
CARRY OUT REMEDIAL WORK TO COMPLY WITH RETROFIT PROVISIONS OF THE FIRE CODE. (APPLICATION IS FOR 275, 285 AND 295 SHUTER STREET) COST OF CONSTRUCTION $108,500.00 - FEES COLLECTED UNDER 390977 EDC/DB MR. PETER AU IS FAMILIAR. EDC
Oct 18, 1996 · 275 SHUTER ST - Building permit96 020539Inspection
CARRY OUT REMEDIAL WORK TO COMPLY WITH THE RETROFIT PROVISIONS OF THE FIRE CODE. EDC (APPLICATION IS FOR 275, 285 AND 295 SHUTER STREET)
Oct 1, 1996 · 275 SHUTER ST - Building permit93 017607Closed
INSTALL MAGLOCKS. SF COST INCLUDED IN FILE 349604
Oct 7, 1993 · 275 SHUTER ST - Building permit93 017599Closed
CONSTRUCT ADDITIONS TO LOBBIES AND COMMON FACILITIES. SF
Oct 7, 1993 · 275 SHUTER ST
Check before you build
Site-specific exception 900.2.10(898)
Needs a closer look3 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On a lot , parking spaces for the permitted uses must be provided on the lot , if: (i) no parking space is within 6.0 metres of the lot line abutting Shuter St.; and (ii) an minimum of 3 parking spaces for every 4 dwelling units are provided
- Rule B
For the purposes of this provision, the area that this exception pertains to is considered to be one lot ; and [TO: 438-86; 12(1) 46]
- Rule C
The minimum parking rate for a building used for assisted housing is 0.3 parking spaces for each dwelling unit .
- Older by-law A
Section 12(1) 46 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(1) 66 of former City of Toronto By-law 438-86
1 part for other addresses
- C On 155 Sherbourne St., former City of Toronto by-laws 22956 and 22994.
Lot facts
- Area
- 40,861 m²
- Frontage
- 159.5 mestimated, irregular lot
- Depth
- 348.5 mestimated, irregular lot
- Street
- Seaton St
- Corner lot
- Yes, also on Shuter St348.5 m along it
- Public lane
- Ramsay Lane, 156.7 m along it
- House footprint
- 1,520 m²roof up to 57.4 m
- Back yard
- 113.7 mhouse to rear lot line
- Side yards
- 40.3 m and 69.8 mhouse to side lot lines
- Buildings on the lot
- 18house, garage, sheds
- Max height
- 11 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d2.0) (x898) (Residential). Chapter 10, section 10.10 of the by-law. Source
Around this lot
- Minor variances approved
- 97%33 of 34 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 4
- Development applications
- 31
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 34 variance decisions: more than at 68% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck. The existing rear one-storey addition and rear deck will be demolished.
320 ONTARIO ST · May 28, 2025 · 466 m away - Minor varianceApproved
To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.
238 BERKELEY ST · Jan 24, 2024 · 252 m away - Minor varianceApproved
To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.
238 BERKELEY ST · Jan 24, 2024 · 252 m away - Minor varianceApproved
To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.
238 BERKELEY ST · Jan 24, 2024 · 252 m away - Minor varianceApproved
To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.
238 BERKELEY ST · Jan 24, 2024 · 252 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the property into two lots (Building B and Building C) and to create new reciprocal stratified easements/rights-of-way.
90 ONTARIO ST · Nov 4, 2027 · 183 m away - Zoning review
Not Started
290 SHUTER ST · Nov 17, 2026 · 175 m away - Zoning review
Under Review
339 QUEEN ST E · Nov 6, 2026 · 214 m away - Building permit
Proposal to install mag lock.
275 QUEEN ST E · Nov 5, 2026 · 134 m away - Building permit
Proposal to renovate the existing ground floor sprinkler system for Shoppers Drug Mart tenant fit out.
275 QUEEN ST E · Oct 19, 2026 · 134 m away - Building permit
REV01: Proposed revision change of use to include the ground floor and interior alterations to ground floor to create retail spaceProposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes proposed to existing building GFA, height, or setbacks.
154 SHUTER ST · Oct 15, 2026 · 293 m away - Zoning review
Closed
234 PARLIAMENT ST · Oct 8, 2026 · 210 m away - Zoning review
Closed
275 QUEEN ST E · Oct 7, 2026 · 134 m away - Building permit
REVISION - revised drawingsProposed commercial kitchen ventilation system.
368 QUEEN ST E · Oct 5, 2026 · 275 m away - Building permit
Proposal for demolishing the commerical building due to unsafe conditions (Unsafe Order-26 215619 UNS 00 VI). Including the address 251 Queen St. E., the building is attached to 354 Richmond street
354 RICHMOND ST E · Oct 2, 2026 · 226 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station17 min walk
- Nearest TTC stop
- Queen St East at Ontario St1 min walk
- Nearest cycling route
- Shuter StCycle Track, 1 min walk
- Nearest traffic count
- 3,536 vehicles in 8 hOntario St / Shuter St, 60 m away, Jan 25, 2020
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 3 fatal, 8 with pedestrians, 2 with cyclists
- Parks
- Ontario Street Parkette3 min walk
- Moss Park4 min walk
- 40 Power St Park6 min walk
Schools within 1 km
- LIBERTY PREP SCHOOL Private 4 min walk
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 7 min walk
- ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
- LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 9 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 10 min walk
- NELSON MANDELA PARK PUBLIC SCHOOL English Public 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.