HousePrecheckCheck an address

275 Albany AveToronto · zoning, lot size and permit records

Also 436 Dupont St, 440 Dupont St, 450 Dupont St

49.1 × 67.2 m3,043 m²on Albany Avecorner, also on Dupont St

Not a single house

Several homes on one parcel

4 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 4 homes on one parcel of 0.3 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • Permits or applications open on this parcelStill open in the City's records: 18 149007 (Stand alone excavation and shoring for soil remediation. 275 ALBANY AVE & 420 DUPONT ST, 2018, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 16 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N20 m
49.1 m frontage67.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2018

    Needs a closer look

    Still open in the City's records: 18 149007 (Stand alone excavation and shoring for soil remediation. 275 ALBANY AVE & 420 DUPONT ST, 2018, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 166055 GRA 00 IVNotice Issued

    Notice Issued Graffiti

    May 16, 2026 · 275 ALBANY AVE
  • By-law investigation26 161737 GRA 00 IRNotice Issued

    Graffiti

    May 16, 2026 · 275 ALBANY AVE
  • Building permit22 192075Closed

    One illuminated sign and one projecting sign

    Aug 18, 2022 · 275 ALBANY AVE
  • Building permit21 160901Closed

    REVISION - revised layout for relocation of washrooms, vestibule doors are now double swing doorsProposal for interior alterations for office. Unit 105 "scotiabank"

    Jul 13, 2022 · 275 ALBANY AVE
  • Building permit18 138486Cancellednew building

    REVISION - revise the material of garage door from metal to rubber and remove fire rating requirements for door S1Proposal to construct a 9 storey mixed use building with 216 residential units, retail shell at grade, and 2 levels of underground parking.

    Sep 14, 2021 · 275 ALBANY AVE
  • Development application20 210283 STE 11 CDClosed

    Draft Plan of Condominium for 216 residential units in the approved 9-storey mixed-use building.

    Oct 23, 2020 · 275 ALBANY AVE · City file
  • Building permit18 149007Inspection

    Stand alone excavation and shoring for soil remediation. 275 ALBANY AVE & 420 DUPONT ST.

    Aug 31, 2018 · 275 ALBANY AVE
  • Building permit17 164580Closed

    To erect and display two non-illuminated wall signs, in conjunction with a new condo development.**BIANCA**

    May 30, 2017 · 275 ALBANY AVE
Show 6 older records
  • Zoning review16 193621 PSPClosed
    Jul 25, 2016 · 275 ALBANY AVE
  • Development application16 193621 STE 20 SAClosed

    Application for official plan amendment and rezoning in order to permit the redevelopment of the Site for a 9-storey mixeduse development comprising approximately 245 condominium apartments and 2097 square metres of grade related retail space.

    Jul 19, 2016 · 275 ALBANY AVE · City file
  • Building permit15 255944Closeddemolition

    Proposal to demolish existing 3 storey industrial building.

    Dec 15, 2015 · 275 ALBANY AVE
  • Zoning review15 256733 POZClosed
    Dec 10, 2015 · 275 ALBANY AVE
  • Development application15 256733 STE 20 OZClosed

    Application for official plan amendment and rezoning in order to permit the redevelopment of the Site for a 12-storey mixeduse development comprising approximately 296 condominium apartments and 2301 square metres of grade related retail space.

    Nov 25, 2015 · 275 ALBANY AVE
  • Building permit13 234627Closed

    Proposal to install 1 backflow prevention device in an exisitng food products factory - Wings Food Products

    Oct 8, 2013 · 275 ALBANY AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,043 m²
Frontage
49.1 m
Depth
67.2 m
Street
Albany Ave
Corner lot
Yes, also on Dupont St67.2 m along it
Public lane
None
House footprint
526 m²
Back yard
0 mhouse to rear lot line
Side yards
9.4 m and 13.3 mhouse to side lot lines
Buildings on the lot
28house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    91%32 of 35 decisions
    Garden suite permits
    0
    Laneway suite permits
    4
    Multiplex permits
    13
    Development applications
    11

    Within 300 m, last 10 years. 17 suite and multiplex permits: more than at 85% of Toronto houses (median 3). 35 variance decisions: more than at 69% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To construct a new rear two-storey detached ancillary building (containing a garden suite) with a new rear walkway and two bicycle parking spaces in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit in the ancillary building). The existing two-storey ancillary building (shed) will be demolished.

      179 HOWLAND AVE · Oct 21, 2026 · 302 m away
    • Minor varianceApproved

      To alter the existing rear one-storey ancillary building (containing studio space) by constructing a complete second storey addition with a side (north) access staircase. This ancillary building will not be used as habitable space.

      140 WALMER RD · Aug 12, 2026 · 412 m away
    • Minor varianceApproved

      To construct a new three-storey apartment building with front and rear balconies (located on the second and third storeys), front and rear basement walkouts, front and rear porches, exterior stairs (at the northwest, northeast, and southeast corners of the building), and a raised planter with concrete wall at the southwest corner. There will be a total of 12 residential dwelling units on this corner lot.

      574 DAVENPORT RD · Jul 22, 2026 · 404 m away
    • Minor varianceApproved

      To alter the existing two-storey townhouse dwelling by constructing a rear second storey addition (above the rear one-storey portion of the dwelling).

      871 PALMERSTON AVE · Jul 15, 2026 · 321 m away
    • Minor varianceApproved

      To alter the existing three-storey semi-detached dwelling by constructing a front one-storey addition (enclosing a portion of the existing covered porch into habitable space).

      145 HOWLAND AVE · Jun 3, 2026 · 423 m away

    Latest activity nearby

    • Building permit

      Commercial vehicle impact repairs

      468 DUPONT ST · Nov 20, 2026 · 95 m away
    • Building permit

      Proposal for structural impact damage restoration.

      472 DUPONT ST · Nov 3, 2026 · 112 m away
    • Zoning review

      Cancelled

      420 DUPONT ST · Oct 19, 2026 · 48 m away
    • Building permitmultiplex

      Proposal to remove existing basment walkout & replace it with new one in existing 2-unit building.

      503 BRUNSWICK AVE · Oct 16, 2026 · 261 m away
    • Zoning review

      Closed

      430 DUPONT ST · Oct 6, 2026 · 35 m away
    • Building permit

      Interior renovations to existing 2.5 storey single family townhouse.

      204 HOWLAND AVE · Oct 2, 2026 · 200 m away
    • Building permit

      Proposal to install backwater valve

      271 ALBANY AVE · Sep 17, 2026 · 52 m away
    • Zoning review

      Closed

      1205 BATHURST ST · Aug 14, 2026 · 251 m away
    • Zoning review

      Closed

      430 DUPONT ST · Aug 13, 2026 · 35 m away
    • Building permit

      Proposed window replacement, back patio fence, and interior alterations to existing mixed use building

      1085 BATHURST ST · Aug 12, 2026 · 138 m away

    Neighbourhood: Annex

    About the area around the lot, not the lot itself.

    Nearest station
    Dupont Station8 min walk
    Nearest TTC stop
    Dupont St at Howland Ave1 min walk
    Nearest cycling route
    Howland AveBike Lane, 1 min walk
    Nearest traffic count
    18,909 vehicles in 14 hDupont St / Howland Ave, 90 m away, Aug 13, 2024
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Cawthra Playground4 min walk
    Vermont Square Park5 min walk
    Jean Sibelius Square6 min walk

    Schools within 1 km

    • GEORGE BROWN COLLEGE - CASA LOMA CAMPUS College 5 min walk
    • ROYAL ST GEORGES COLLEGE SCHOOL - ADVANCEMENT Private 8 min walk
    • ROYAL ST GEORGE'S COLLEGE SCHOOL - JR SCHOOL Private 8 min walk
    • ROYAL ST GEORGES COLLEGE SCHOOL - MAIN ADDRESS Private 9 min walk
    • ROYAL ST GEORGES COLLEGE SCHOOL - SEE HOUSE Private 9 min walk
    • ROYAL ST GEORGE'S COLLEGE- SR SCHOOL Private 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureAnnexMedian neighbourhood
    Median household income (2020)$85,000$84,500
    Households that own their home41%54%
    Population (2021)29,30016,813
    Homes built in 1960 or before40%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleAnnexCity median
    Assault1080.9636.3
    Robbery80.569.5
    Homicide5.25.3
    Shootings5.210.5
    Auto theft116.9192.6
    Theft over $5,000114.346.1
    Break and enter387.1172.8
    Theft from vehicles220.9188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.