HousePrecheckCheck an address

274 Humberline DrToronto · zoning, lot size and permit records

Employment · E 1.0123.2 × 130.9 m15,867 m²on Humberline Drcorner, also on Claireville Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
123.2 m frontage130.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B44/04E (To obtain consent to sever the land into two industrial lots, 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit14 176143Closed

    Installation of a 350KW photovoltaic solar collector on the roof of the existing building

    Jun 27, 2014 · 274 HUMBERLINE DR
  • Building permit11 146751Closed

    Interior alterations to office area * McLeish Corr-A-Box*

    Jul 14, 2011 · 274 HUMBERLINE DR
  • Building permit11 127346Closed

    (1) premise isolation on existing 2" water service and (6) expansion tanks for (6) existing hot water tanks located throughout the industrial building.

    Mar 24, 2011 · 274 HUMBERLINE DR
  • Consent (lot split)B44/04EApproved

    To obtain consent to sever the land into two industrial lots.

    Oct 14, 2004 · 274 HUMBERLINE DR
  • Zoning review04 135928 ZPRClosed
    May 17, 2004 · 274 HUMBERLINE DR
  • Zoning review04 135924 ZPRClosed
    May 17, 2004 · 274 HUMBERLINE DR
  • Building permit97 085639Closed

    TRIM RECOVERY SYSTEM TO INDUSTRIAL BLDG.

    Jul 15, 1997 · 274 HUMBERLINE DR

Lot facts

Area
15,867 m²
Frontage
123.2 m
Depth
130.9 m
Street
Humberline Dr
Corner lot
Yes, also on Claireville Dr130.9 m along it
Public lane
None
House footprint
7,438 m²roof up to 19.2 m
Back yard
15.6 mhouse to rear lot line
Side yards
9.4 m and 23.3 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 14 City trees in front of this lot. The City's street tree inventory lists 14 trees at this address: linden (52 cm), linden, littleleaf (47 cm), honey locust (40 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To create 17 additional parking spaces located at the front of the existing building.

    41 CLAIREVILLE DR · Aug 1, 2024 · 361 m away
  • Minor varianceApproved

    To permit a parking deficiency to facilitate the development of a proposed one-storey warehouse building.

    145 CARRIER DR · May 25, 2023 · 395 m away
  • Minor varianceApproved

    To construct a new loading facility on the north side of the existing industrial building.

    330 HUMBERLINE DR · Apr 11, 2019 · 459 m away
  • Minor varianceApproved

    To permit a parking deficiency for a Software Development and Processing use.

    310 HUMBERLINE DR · Nov 22, 2018 · 257 m away

Latest activity nearby

  • Zoning review

    Closed

    6850 FINCH AVE W · Sep 22, 2026 · 300 m away
  • Building permit

    Proposed Installation design of the residential washer & dryer, purchased by the Toronto Fire Services for Fire Station in accordance with Provincial and City requirements.

    267 HUMBERLINE DR · Jan 31, 2025 · 162 m away
  • Building permit

    Rooftop solar PV panels installation

    279 HUMBERLINE DR · Jan 13, 2025 · 181 m away
  • Building permit

    Sprinkler System Upgrades to comply with FM Global Standards, Existing sprinkler heads will be replaced with ESFR heads as required by use of warehouse.

    279 HUMBERLINE DR · Apr 5, 2024 · 181 m away
  • Building permit

    Installation of new fire alarm system

    315 HUMBERLINE DR · Jan 3, 2024 · 293 m away
  • Zoning review

    Closed

    25 CLAIREVILLE DR · Oct 11, 2023 · 232 m away
  • Building permit

    Alternative Solution for the design of exposure sprinklers, for 'COVERTECH FABRICATING"

    279 HUMBERLINE DR · Oct 10, 2023 · 181 m away
  • Zoning review

    Cancelled

    25 CLAIREVILLE DR · Feb 1, 2023 · 232 m away
  • Development application

    Please note, the October 2023 submission is a significant revision to the proposal initially submitted. The proposal has now been altered to be an addition to the existing building rather than an entirely new building on the Subject Property. The new addition, proposed at the rear (southern) end of the building, would add approximately 4841.92m2 of additional space over two floors, with an overall height of 12.49m and a length of 35.97m from the rear main wall of the existing building. It would result in a total GFA of 14,622.72m2 for the entire building. There is a small two-storey addition at the front of the existing building as well.

    25 CLAIREVILLE DR · Jan 25, 2022 · 242 m away · City file
  • Building permitmultiplex

    REVISION - as per the drawingsHVAC - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2

    310 HUMBERLINE DR · Sep 20, 2021 · 257 m away

Neighbourhood: West Humber-Clairville

About the area around the lot, not the lot itself.

Nearest station
Westmore Station26 min walk
Nearest TTC stop
Claireville Dr (South) at Humberline Dr2 min walk
Nearest cycling route
West Humber TrlMulti-Use Trail, 8 min walk
Nearest traffic count
11,767 vehicles in 14 hClaireville Dr / Humberline Dr (South), 110 m away, Sep 30, 2025
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Trca Lands ( 1)7 min walk
Humber Arboretum8 min walk
Finch - Humberline Sportsfields8 min walk

2021 Census

FigureWest Humber-ClairvilleMedian neighbourhood
Median household income (2020)$92,000$84,500
Households that own their home65%54%
Population (2021)33,30016,813
Homes built in 1960 or before13%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest Humber-ClairvilleCity median
Assault933636.3
Robbery152.469.5
Homicide2.75.3
Shootings26.710.5
Auto theft1320.6192.6
Theft over $5,000245.946.1
Break and enter347.5172.8
Theft from vehicles545.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.