HousePrecheckCheck an address

2716 St Clair Ave EToronto · zoning, lot size and permit records

Residential townhouse · RT (x221)≈ 41.1 × 89.7 m2,830 m²on St Clair Ave Ecorner, also on St Columba Plbacks onto Ln E O Connor N St Clair

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 2 development applications open within 300 m, up to 16 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 41.1 m frontage≈ 89.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit01 162864Closed

    HVAC system for Designated Smoking Area

    Aug 29, 2001 · 2716 ST CLAIR AVE E
  • Building permit01 162849Closed

    Designated Smoking Area

    Aug 29, 2001 · 2716 ST CLAIR AVE E

Check before you build

  • Site-specific exception 900.5.10(221)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.5.10(221)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    On 2716 St. Clair Ave. E., Section 7.5.4.16, of the former Borough of East York zoning by-law 6752.

By-law 569-2013, Chapter 900

Lot facts

Area
2,830 m²
Frontage
41.1 mestimated, irregular lot
Depth
89.7 mestimated, irregular lot
Street
St Clair Ave E
Corner lot
Yes, also on St Columba Pl89.7 m along it
Public lane
Ln E O Connor N St Clair, 58.2 m along it
Max height
—
Max lot coverage
—
  • Zone RT (x221) (Residential Townhouse). Chapter 10, section 10.60 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust shademaster (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%25 of 25 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
3

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 25 variance decisions: more than at 57% of Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Back water valve installation

    22 JOANITH DR · Nov 12, 2026 · 206 m away
  • Building permitmultiplex, secondary suite

    Revision No.1: REVISION TO CONVERT ALL EXTERIOR EXISTING BASEMENT AND MAIN FLOOR WALLS TO NEW WALLSProposal for a rear 2 storey addition, 2nd floor addition, rear deck, underpinning and interior alterations to create a duplex

    14 JOANITH DR · Sep 9, 2026 · 164 m away
  • Zoning review

    Closed

    2642 ST CLAIR AVE E · Aug 19, 2026 · 227 m away
  • Zoning review

    Closed

    2642 ST CLAIR AVE E · Aug 19, 2026 · 227 m away
  • Building permitsecondary suite

    Revision 01: Revision to permit (as bubbled)____________________________________________________________________________________Proposal for interior alterations, rear wood deck, two storey rear and side addition including second-storey addition over the existing one-storey single-family detached dwelling.

    138 GLENWOOD CRES · Aug 5, 2026 · 188 m away
  • Zoning review

    Closed

    2701 ST CLAIR AVE E · Jul 29, 2026 · 118 m away
  • Building permit

    Proposed rear yard second floor addition to an existing 2-storey and underpinning. single family dwelling.

    173 GLENWOOD CRES · Jul 21, 2026 · 173 m away
  • Building permitmultiplex

    Convert dwelling into three units, interior alterations, second floor addition, front porch and rear deck.

    186 GLENWOOD CRES · Jul 2, 2026 · 149 m away
  • Building permit

    Proposal for sunroom addition to rear of 3rd floor apartment with new roof over

    855-857 O'CONNOR DR · Jun 19, 2026 · 57 m away
  • Zoning review

    Closed

    971 O'CONNOR DR · May 25, 2026 · 244 m away

Neighbourhood: O'Connor-Parkview

About the area around the lot, not the lot itself.

Nearest station
Main Street Station33 min walk
Nearest TTC stop
St Clair Ave East at St Columba Pl1 min walk
Nearest cycling route
Taylor Creek TrlMulti-Use Trail - Entrance, 7 min walk
Nearest traffic count
16,892 vehicles in 14 hSt Clair Ave E / St Columba Pl, 70 m away, Feb 25, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Parkview Gardens4 min walk
Taylor Creek Park7 min walk
Topham Park7 min walk

Schools within 1 km

  • ABACUS MONTESSORI Private 2 min walk
  • SELWYN ELEMENTARY SCHOOL English Public 7 min walk
  • GORDON A BROWN MDL SCHOOL English Public 8 min walk
  • PRESTEIGN HEIGHTS ELEMENTARY SCHOOL English Public 8 min walk
  • PARKSIDE ELEMENTARY SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureO'Connor-ParkviewMedian neighbourhood
Median household income (2020)$77,000$84,500
Households that own their home46%54%
Population (2021)18,40516,813
Homes built in 1960 or before48%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleO'Connor-ParkviewCity median
Assault755.6636.3
Robbery43.669.5
Shootings4.810.5
Auto theft179.2192.6
Theft over $5,00038.746.1
Break and enter77.5172.8
Theft from vehicles193.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.