HousePrecheckCheck an address

271 Morrish RdHighland Creek, Toronto · City records before you offer

Residential multiple · RM (u16) (x308)≈ 16.2 × 29.7 m309 m²on Bush Gtcorner, also on Morrish Rd

Nothing to check before you offer in the City's records
N10 m
≈ 16.2 m frontage≈ 29.7 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 271 Morrish Rd

271 Morrish Rd is on a 16.2 m by 29.7 m lot on Bush Gt in Highland Creek. The zoning is RM. A site-specific exception, 900.6.10(308), changes some of the usual rules for this address. The lot also fronts Morrish Rd.

The City has 18 records on this lot since 2006. That is more than at 99% of Toronto houses. In 2007, a building permit was filed: "New townhouse unit 7". Status: closed. In 2007, a building permit was filed: "New townhouse unit 6". Status: closed. In 2007, a building permit was filed: "New townhouse unit 5". Status: closed. Nothing on file is open right now.

Within 300 m, 1 development application is open (the tallest up to 8 storeys). Within 300 m, the Committee of Adjustment decided 12 minor variance applications in the last 10 years and approved 83%. The nearest TTC stop is Old Kingston Rd at Morrish Rd West Side, a 3-minute walk.

Summary

What the City's records show on this house

  • Site-specific exception 900.6.10(308)Moderate
  • No permit for a second unit on fileLowFree check
  • 1 development application open within 300 mLowFree check
  • Highland Creek Community Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 4 units

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Clear

Open City files

How much in the City's records needs answers before an offer

  • No open orders or by-law investigations
  • No permits left open for years
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

18 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2007-10-09Building permit
05 153065
new townhouse unit 7Closed
2007-10-09Building permit
05 153064
new townhouse unit 6Closed
2007-10-09Building permit
05 153063
new townhouse unit 5Closed
2007-06-27Consent (lot split)
B008/07SC
The owners are requesting the consent of the Committee of Adjustment to convey land to create 16 lots for 14 townhouse dwellings and 2 semi-detached dwellings, and one parcel for a common element condominium consisting of a private roadway, sidewalk and three visitor parking spaces. The owners also propose to create easements for storm sewers and utilities. The proposed parcels are shown on the attached Proposed Lot Division plan. All of the proposed parcels are described in Schedule 'A' (attached).Approved
2007-04-26Zoning review
07 176091 PLO
No description on fileClosed
2006-11-29Building permit
05 153068
new townhouse unit 10Closed
2006-11-29Building permit
05 153067
new townhouse unit 9Closed
2006-11-29Building permit
05 153062
new townhouse unit 4Closed
2006-11-29Building permit
05 153061
new townhouse unit 3Closed
2006-11-29Building permit
05 153060
new townhouse unit #2Closed
2006-11-29Building permit
05 153059
new townhouse end unit #1Closed
2006-11-15Building permit
05 153066
new townhouse unit 8Closed
2006-10-30Building permit
05 153074
new townhouse unit 16Closed
2006-10-30Building permit
05 153073
new townhouse unit 15Closed
2006-10-30Building permit
05 153072
new townhouse unit 14Closed
2006-10-30Building permit
05 153071
new townhouse unit 13Closed
2006-10-30Building permit
05 153070
new townhouse unit 12Closed
2006-10-30Building permit
05 153069
new townhouse unit 11Closed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.6.10(308)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.6.10(308)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Highland Creek Community Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.6.10(308)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Limited

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 4 units: likely fits
  • Secondary suite: likely fits
  • No public lane, so no laneway suite

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 4 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
≈ 16.2 m frontage≈ 29.7 m deepon Bush Gt
Zone
RM (u16) (x308)
Height limit
—
Lot coverage limit
40%
Corner lot
Yes, also on Morrish Rd
Public lane
None
New house permit
2007
House footprint
182 m²
Back yard
4.6 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Some

Building nearby

How much neighbours are building and applying to change within 300 m

  • 1 development application open within 300 m, up to 8 storeys
  • 2 suite and multiplex permits within 300 m in 10 years
  • 12 minor variance decisions within 300 m, 83% approved

What this part means for this house, in plain EnglishUnlock

  1. 1 development application open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 4 of 8 categories
  • Theft over $5,000: 2.1 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Highland Creek neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$120,000median $84,500
Households that own their home86%median 54%
Population (2021)12,625median 16,813
Homes built in 1960 or before9%median 29%
Homes needing major repairs3%median 7%

Getting around and schools

  • Old Kingston Rd at Morrish Rd West SideNearest TTC stop3 min walk
  • Highland Creek DrNearest cycling route6 min walk
  • Highland Creek Public SchoolSchool10 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3575.6
  • Robberycity median 69.544.3
  • Homicidecity median 5.37.4
  • Shootingscity median 10.57.4
  • Auto theftcity median 192.6243.5
  • Theft over $5,000city median 46.195.9
  • Break and entercity median 172.8118.1
  • Theft from vehiclescity median 188.1214

More about Highland Creek

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 271 Morrish Rd

Nothing in the City's records needs answers before an offer on 271 Morrish Rd

The report lists the 15 record sets we checked and shows what the City allowed next door. You get it as a PDF for your agent and lawyer, and we watch the address for 90 days.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.