HousePrecheckCheck an address

2707 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c0.5; r3.0) SS2 (x2272)11.2 × 28.6 m308 m²on Yonge St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 48 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 2 development applications open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
  • 3 open by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 249968 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 249950 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 237495 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
11.2 m frontage28.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 open by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 249968 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 249950 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 237495 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 185638 PRS 00 IR (Property Standards, 2026); 26 126144 PRS 00 IR (Property Standards, 2026); 26 114700 HEA 00 IR (Adequate Heat, 2026); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 48 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 249968 PRS 00 IRRescheduled

    Property Standards

    Oct 6, 2026 · 2707 YONGE ST
  • By-law investigation26 249950 PRS 00 IRRescheduled

    Property Standards

    Oct 6, 2026 · 2707 YONGE ST
  • By-law investigation26 237495 PRS 00 IRRescheduled

    Property Standards

    Sep 14, 2026 · 2707 YONGE ST
  • By-law investigation26 185638 PRS 00 IRClosed

    Property Standards

    Jun 16, 2026 · 2707 YONGE ST
  • By-law investigation26 126144 PRS 00 IRClosed

    Property Standards

    Mar 7, 2026 · 2707 YONGE ST
  • By-law investigation26 114700 HEA 00 IRClosed

    Adequate Heat

    Feb 8, 2026 · 2707 YONGE ST
  • By-law investigation25 105230 HEA 00 IRClosed

    Adequate Heat

    Jan 15, 2025 · 2707 YONGE ST
  • Building permit21 128347Closed

    Proposal to install a Backflow prevention device for existing apartment building

    Apr 23, 2021 · 2707 YONGE ST
Show 1 older records
  • Building permit18 125521Closed

    Proposed: Add smoke detectors and heat detector

    Apr 13, 2018 · 2707 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2272)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2272)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 107 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 269 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  4. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 107 of former City of Toronto By-law 438-86

  5. Older by-law B

    Section 12(2) 269 of former City of Toronto By-law 438-86

  6. Older by-law C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

4 parts for other addresses
  • D On the lands municipally known as 2709 to 2741 Yonge St. in 1993, Section 12(1) 345 of former City of Toronto By-law 438-86
  • E On 2709-2741 Yonge St., City of Toronto by-law 1171-08.
  • D On the lands municipally known as 2709 to 2741 Yonge St. in 1993, Section 12(1) 345 of former City of Toronto By-law 438-86
  • E On 2709-2741 Yonge St., City of Toronto by-law 1171-08.
By-law 569-2013, Chapter 900

Lot facts

Area
308 m²
Frontage
11.2 m
Depth
28.6 m
Street
Yonge St
Corner lot
No
Public lane
None
House footprint
182 m²roof up to 16.6 m
Back yard
0.4 mhouse to rear lot line
Side yards
0.1 m and 3.2 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 3.0 (c0.5; r3.0) SS2 (x2272) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
93%40 of 43 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
1
Development applications
6

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 43 variance decisions: more than at 78% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To seek amendment to a previously approved 7-Storey mid-rise building to increase the number of units, height, and gross floor area and modify building setbacks and decrease the number of parking spaces. Note: This application was previously deferred at the Committee of Adjustment hearing on August 28, 2025.

    2851 YONGE ST · Feb 5, 2026 · 373 m away
  • Minor varianceApproved

    To construct a new 9 storey mixed use building. with 1 ground-floor commercial unit and 22 residential dwelling units.

    2722 YONGE ST · Nov 6, 2025 · 108 m away
  • Minor varianceApproved

    To alter the existing building by adding a rear second storey addition.

    2561 YONGE ST · Oct 23, 2025 · 357 m away
  • Minor varianceApproved

    This application proposes a technical variance to By-law 897-2020 to facilitate the Severance Application (File # B0009/24NY).

    2781 YONGE ST · Jul 4, 2024 · 188 m away
  • Minor varianceApproved

    To construct 1 storey slab on grade rear addition to an existing ground floor retail unit

    2551 YONGE ST · Jul 4, 2024 · 407 m away

Latest activity nearby

  • Minor variancePending

    To construct a two-storey and second storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations. Please note this application was previously deferred Thursday, September 17, 2026 in order to allow for proper notice of the application to be provided.

    34 CRAIGHURST AVE · Dec 10, 2026 · 193 m away
  • Minor variancePending

    To alter the existing two-storey detached dwelling by constructing a two-storey front and rear additions, and a new front porch and rear deck.

    12 STIBBARD AVE · Nov 26, 2026 · 242 m away
  • Zoning review

    Closed

    2647 YONGE ST · Oct 27, 2026 · 148 m away
  • Zoning review

    Closed

    2615 YONGE ST · Oct 26, 2026 · 241 m away
  • Building permit

    Proposed interior alterations to an existing finished basement including staged underpinning of existing foundation walls, installation of new structural steel beams and columns, new reinforced concrete slab-on-grade, and associated plumbing and drainage systems including sump pump and backwater valve. No change to building footprint or building height.

    3 BLYTHWOOD CRES · Oct 16, 2026 · 253 m away
  • Building permit

    Proposal for interior alterations to the basement of an existing commercial building.

    2610 YONGE ST · Sep 22, 2026 · 223 m away
  • Building permit

    Proposed front and rear addition with a rear deck and front porch. Second floor and roof level to be raised.

    12 STIBBARD AVE · Sep 11, 2026 · 242 m away
  • Building permitdemolition

    Proposal to demolish the existing single detached home on site to facilitate the redevelopment of the new approved retirement & rental building.

    19 ALEXANDRA BLVD · Sep 10, 2026 · 97 m away
  • Building permitdemolition

    Proposal to demolish the existing mixed use building on site to facilitate the redevelopment of the new approved retirement & rental building.

    2676 YONGE ST · Sep 10, 2026 · 45 m away
  • Building permit

    Proposal for underpinning.

    12 STIBBARD AVE · Aug 26, 2026 · 242 m away

Neighbourhood: Lawrence Park South

About the area around the lot, not the lot itself.

Nearest station
Lawrence Station15 min walk
Nearest TTC stop
Yonge St at Lytton Blvd1 min walk
Nearest cycling route
Duplex AveSigned Route (No Pavement Markings), 4 min walk
Nearest traffic count
12,590 vehicles in 8 hYonge St / Blythwood Rd, 50 m away, Feb 2, 2022
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Snider Parkette1 min walk
Blythwood Ravine Park5 min walk
Lawrence Park Ravine5 min walk

Schools within 1 km

  • BLYTH ACADEMY SCHOOL - LAWRENCE PARK Private 2 min walk
  • ST CLEMENTS SCHOOL Private 8 min walk
  • ST CLEMENTS EARLY LEARNING Private 8 min walk
  • JOHN FISHER JR PUBLIC SCHOOL English Public 10 min walk
  • JOHN ROSS ROBERTSON JR PUBLIC SCHOOL English Public 12 min walk
  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureLawrence Park SouthMedian neighbourhood
Median household income (2020)$162,000$84,500
Households that own their home69%54%
Population (2021)14,96016,813
Homes built in 1960 or before69%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleLawrence Park SouthCity median
Assault200.2636.3
Robbery35.369.5
Auto theft176.6192.6
Theft over $5,00041.246.1
Break and enter288.5172.8
Theft from vehicles88.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.