HousePrecheckCheck an address

270 Milan StToronto · zoning, lot size and permit records

Residential · R (d1.0) (x984)8.1 × 15.4 m123 m²on Milan St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 30 rental units, built 2005More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 3 development applications open within 300 m, up to 47 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
  • City upkeep score: 96 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Moss ParkThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N5 m
8.1 m frontage15.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 151922 PRS 00 IR (Property Standards, 2026); 26 118979 PRS 00 IR (Property Standards, 2026); 24 251258 PRS 00 IR (Property Standards, 2024).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A1180/22TEY (To eliminate the obligation to maintain not less than four parking spaces on the lands..., 2022).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 47 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 96 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 30 units, built 2005).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 151922 PRS 00 IRClosed

    Property Standards

    Apr 29, 2026 · 270 MILAN ST
  • By-law investigation26 118979 PRS 00 IRClosed

    Property Standards

    Feb 19, 2026 · 270 MILAN ST
  • By-law investigation24 251258 PRS 00 IRClosed

    Property Standards

    Dec 17, 2024 · 270 MILAN ST
  • Building permit23 147719Closed

    Chiller and cooling Tower Replacement

    Jul 11, 2023 · 270 MILAN ST
  • Minor varianceA1180/22TEYApproved

    To eliminate the obligation to maintain not less than four parking spaces on the lands municipally known as 393 Dundas Street East for the exclusive use of the occupants and visitors from the lands municipally known as 270 Milan Street.

    Nov 23, 2022 · 270 MILAN ST
  • Zoning review22 198093 ZAPClosed
    Aug 31, 2022 · 270 MILAN ST
  • Building permit14 251580Closed

    OTHER, PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING BUILDING - ST.JUDE COMMUNITY HOMES

    Dec 3, 2014 · 270 MILAN ST

Check before you build

  • Site-specific exception 900.2.10(984)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(984)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86.

  2. Rule B

    City of Toronto by-law 1098-2002.

  3. Older by-law A

    The lands must comply with exception 900.2.10(4). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86.

  4. Older by-law B

    City of Toronto by-law 1098-2002.

2 parts for other addresses
  • C On 102 Shuter Street and 220 George Street, City of Toronto by-law 68-2014(OMB).
  • C On 102 Shuter Street and 220 George Street, City of Toronto by-law 68-2014(OMB).
By-law 569-2013, Chapter 900

Lot facts

Area
123 m²
Frontage
8.1 m
Depth
15.4 m
Street
Milan St
Corner lot
No
Public lane
None
House footprint
122 m²
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x984) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
93%38 of 41 decisions
Garden suite permits
1
Laneway suite permits
1
Multiplex permits
10
Development applications
9

Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 41 variance decisions: more than at 76% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    185 GERRARD ST E · Oct 14, 2026 · 485 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck. The existing rear one-storey addition and rear deck will be demolished.

    320 ONTARIO ST · May 28, 2025 · 195 m away
  • Minor varianceApproved

    To alter the existing five-storey apartment building by converting one parking space (located on the B1 parking level) into a storage area use. There will be a total of 47 parking spaces on-site instead of 48 parking spaces.

    291 GEORGE ST · Apr 30, 2025 · 454 m away
  • Minor varianceApproved

    To convert the existing two-and-one-half-storey rowhouse into a 12-room rooming house by constructing a rear third storey addition with a balcony.

    268 SEATON ST · Jul 17, 2024 · 371 m away
  • Minor varianceApproved

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    238 BERKELEY ST · Jan 24, 2024 · 54 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for the 10-storey (39.95 m, including the mechanical penthouse) approved mixed-use building with a two-level underground parking garage, by increasing the building height to 16-storeys (58.4 m, including the mechanical penthouse), resulting in increased residential gross floor area, and modified setbacks. There will be a total of 32 vehicular parking spaces, including three obstructed resident parking spaces. There will be a total of 150 purpose-built rental residential dwelling units on this lot. A related Site Plan Control application (File Number 21 227303 STE 13 SA) is currently under review. This application is necessitated to further increase the building height (14-storeys and 51.65 m), and residential gross floor area approved in Minor Variance Decision A0395/24TEY.

    401 DUNDAS ST E · Nov 25, 2026 · 49 m away
  • Zoning review

    Not Started

    290 SHUTER ST · Nov 17, 2026 · 240 m away
  • Building permit

    Proposal to lower the existing basement via underpinning, interior alterations unfinished basement renovation in single family dwelling

    231 SEATON ST · Nov 10, 2026 · 258 m away
  • Building permit

    Basement underpinning

    321 ONTARIO ST · Oct 22, 2026 · 198 m away
  • Zoning review

    Closed

    234 PARLIAMENT ST · Oct 8, 2026 · 213 m away
  • Building permit

    Proposal for interior alterations to retail unit (alterations to interior finishes, accessibity upgrades, replacement of exterior doors and mechanical system upgrades).

    310 DUNDAS ST E · Sep 28, 2026 · 227 m away
  • Building permit

    1 wall sign**1 OAK DENTAL**

    1 OAK ST · Sep 23, 2026 · 290 m away
  • Building permit

    Proposal to reconstruct the existing garage while maintaining its existing footprint and overall dimensions.

    205 BERKELEY ST · Sep 9, 2026 · 191 m away
  • Building permit

    Proposed one maglock to hallway door.

    465 DUNDAS ST E · Sep 4, 2026 · 209 m away
  • Building permit

    Proposed removal and replacement of exterior staircases to residential units. Retaining walls are supporting current staircases and will need to also be removed and replaced.

    299 ONTARIO ST · Aug 31, 2026 · 136 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station17 min walk
Nearest TTC stop
Dundas St East at Ontario St1 min walk
Nearest cycling route
Shuter StCycle Track, 4 min walk
Nearest traffic count
136 vehicles in 8 hBerkeley St / Coatsworth St, 70 m away, Sep 18, 2007
Serious collisions within 500 m
152021–2026, killed or seriously injured: 3 fatal, 10 with pedestrians, 2 with cyclists
Parks
Ontario Street Parkette1 min walk
Moss Park5 min walk
Oak Street Parkette6 min walk

Schools within 1 km

  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 5 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 7 min walk
  • LIBERTY PREP SCHOOL Private 7 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 10 min walk
  • SPRUCECOURT JR PUBLIC SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.