HousePrecheckCheck an address

27 Phipps StToronto · zoning, lot size and permit records

≈ 46.3 × 39.0 m665 m²on Phipps St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 16 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
≈ 46.3 m frontage≈ 39.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
665 m²
Frontage
46.3 mestimated, irregular lot
Depth
39 mestimated, irregular lot
Street
Phipps St
Corner lot
No
Public lane
None
House footprint
665 m²
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
7house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%30 of 30 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    42

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

      508 CHURCH ST · Sep 9, 2026 · 481 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

      20 MAITLAND ST · Apr 1, 2026 · 284 m away
    • Minor varianceApproved

      To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

      27 GROSVENOR ST · Jul 30, 2025 · 293 m away
    • Minor varianceApproved

      To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

      26 MAITLAND ST · Apr 23, 2025 · 300 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

      510 YONGE ST · Mar 19, 2025 · 250 m away

    Latest activity nearby

    • Minor variancePending

      To alter the development standards for the previously approved two-tower mixed-use development (approved under Site Specific Zoning By-law 1096-2021), by reducing the height of a portion of the first storey (to include a mezzanine level located between the first and second storeys). There will be a total of 767 rental dwelling units (of which 30.4% (233 units) will be affordable rental units), as well as a childcare center on this lot. A related Site Plan Control application (under File Number 19 127591 STE 13 SA) has received Notice of Approval conditions.

      27 GROSVENOR ST · Nov 25, 2026 · 293 m away
    • Zoning review

      Application Acceptable

      95 ST JOSEPH ST · Nov 24, 2026 · 183 m away
    • Building permit

      Proposed Hydro Vault Repairs

      1001 BAY ST · Nov 13, 2026 · 76 m away
    • Building permit

      Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler.

      900 BAY ST · Nov 12, 2026 · 194 m away
    • Building permit

      Proposal for sprinklers for Hearst Tower Level 8-11.

      900 BAY ST · Nov 10, 2026 · 194 m away
    • Building permit

      Proposal for sprinklers for Hepburn Tower Level 3-7.

      900 BAY ST · Nov 10, 2026 · 194 m away
    • Building permit

      Proposed interior alterations for dental office

      16 WELLESLEY ST W · Nov 10, 2026 · 82 m away
    • Building permit

      Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor

      9 ST NICHOLAS ST · Nov 9, 2026 · 89 m away
    • Building permit

      Proposal for sprinklers for Hearst Tower Level 8-10.

      900 BAY ST · Nov 9, 2026 · 194 m away
    • Building permit

      Proposal for sprinklers for Hearst Tower Level 3-7.

      900 BAY ST · Nov 9, 2026 · 194 m away

    Neighbourhood: Bay-Cloverhill

    About the area around the lot, not the lot itself.

    Nearest station
    Wellesley Station3 min walk
    Nearest TTC stop
    Wellesley St West at Bay St1 min walk
    Nearest cycling route
    Wellesley St WCycle Track, 1 min walk
    Nearest traffic count
    13,053 vehicles in 8 hBay St / Wellesley St W, 90 m away, Jun 21, 2023
    Serious collisions within 500 m
    112021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 1 with cyclists
    Parks
    Dr. Lillian McGregor Park1 min walk
    Breadalbane Park2 min walk
    Clover Hill Park2 min walk

    Schools within 1 km

    • THE YMCA ACADEMY SECONDARY SCHOOL Private 3 min walk
    • ST JOSEPH'S COLLEGE SCHOOL English Separate 3 min walk
    • TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 6 min walk
    • THE ABELARD CENTRE FOR EDUCATION Private 8 min walk
    • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 9 min walk
    • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBay-CloverhillMedian neighbourhood
    Median household income (2020)$58,400$84,500
    Households that own their home30%54%
    Population (2021)16,67016,813
    Homes built in 1960 or before4%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBay-CloverhillCity median
    Assault601.9636.3
    Robbery74.769.5
    Auto theft16.6192.6
    Theft over $5,00087.246.1
    Break and enter286.4172.8
    Theft from vehicles145.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.