HousePrecheckCheck an address

269 Gerrard St EToronto · zoning, lot size and permit records

Commercial residential · CR 1.5 (c1.0; r1.0) SS2 (x1906)≈ 31.3 × 34.8 m865 m²on Gerrard St Ebacks onto Drovers Lane

Not a home

Parliament St Branch Library

The City of Toronto's real estate inventory lists Parliament St Branch Library here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A public buildingVisitors and traffic in its open hours; usually quiet at night.
  • Permits or applications open on this parcelRecent records on this lot: 26 146900 (NEW INSTALLATION OF FIRE BACK FLOW PREVENTER, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 26 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
N10 m
≈ 31.3 m frontage≈ 34.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 146900 (NEW INSTALLATION OF FIRE BACK FLOW PREVENTER, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit26 146900Permit Issued

    NEW INSTALLATION OF FIRE BACK FLOW PREVENTER

    May 6, 2026 · 269 GERRARD ST E
  • Building permit17 157284Closed

    Installation of a rooftop photovoltaic array on an existing building

    Jun 5, 2017 · 269 GERRARD ST E
  • Building permit00 156259Closed

    Replace fire alarm system. "historical"

    Jun 29, 2000 · 269 GERRARD ST E

Check before you build

  • Site-specific exception 900.11.10(1906)

    Needs a closer look

    5 site-specific rules and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1906)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, any part of a building above the first storey must be used for residential use. [TO: 438-86; 12(2) 101]

  2. Rule B

    On a lot , a vehicle fuel station , vehicle service shop , or vehicle washing establishment is not a permitted use if the front lot line setback is greater than 1.5 metres; and [TO: 438-86; 12(2) 196]

  3. Rule C

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86; (C) Section 12(2) 196 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 207 of former City of Toronto By-law 438-86

  5. Rule E

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  6. Older by-law A

    On the lands, any part of a building above the first storey must be used for residential use. [TO: 438-86; 12(2) 101]

  7. Older by-law B

    On a lot , a vehicle fuel station , vehicle service shop , or vehicle washing establishment is not a permitted use if the front lot line setback is greater than 1.5 metres; and [TO: 438-86; 12(2) 196]

  8. Older by-law C

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86; (C) Section 12(2) 196 of former City of Toronto By-law 438-86

  9. Older by-law D

    Section 12(2) 207 of former City of Toronto By-law 438-86

  10. Older by-law E

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
865 m²
Frontage
31.3 mestimated, irregular lot
Depth
34.8 mestimated, irregular lot
Street
Gerrard St E
Corner lot
No
Public lane
Drovers Lane, 30.9 m along it
House footprint
321 m²roof up to 11.8 m
Back yard
3.7 mhouse to rear lot line
Side yards
0 m and 12.8 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
4house, garage, sheds
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 1.5 (c1.0; r1.0) SS2 (x1906) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
98%39 of 40 decisions
Garden suite permits
0
Laneway suite permits
3
Multiplex permits
21
Development applications
15

Within 300 m, last 10 years. 24 suite and multiplex permits: more than at 91% of Toronto houses (median 3). 40 variance decisions: more than at 75% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).

    183 CARLTON ST · Jul 22, 2026 · 308 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

    311 SHERBOURNE ST · Jun 3, 2026 · 320 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.

    325 GERRARD ST E · Oct 1, 2025 · 258 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached building (currently vacant and with the front and rear portion of the building, abutting Doctor O Lane, attached below grade) by converting it to a mixed-use building (service hub for the Indigenous community) with four dwelling units and community and office space on the basement, first, and second floors, by constructing front and side (west) basement additions, an enlarged ground floor terrace (at the west portion of the building), three new dormers at the rear portion of the second floor, and a rear second floor balcony at the east portion of the building. There will be a total of four residential dwelling units within this building.

    209 CARLTON ST · Jul 30, 2025 · 258 m away
  • Minor varianceApproved

    To alter the existing three-storey commercial building (containing office uses) by converting the west half of the first storey, and the second and third storeys into a hotel use with a common use area located on the ground floor. The existing east half of the building and the existing pharmacy (located on the ground floor) will be maintained. There will be a total of 39 hotel rooms within this mixed-use building.

    311 SHERBOURNE ST · May 7, 2025 · 320 m away

Latest activity nearby

  • Zoning review

    Not Started

    405 PARLIAMENT ST · Nov 23, 2026 · 95 m away
  • Building permitsecondary suite

    CONSTRUCT 1 HOUR FRR WALL IN BASEMENT TO SEPARATE FIRST FLOOR UNIT FROM BASEMENT UNIT [Basement & first floor separate commercial and 2nd & 3rd Residential)

    440 PARLIAMENT ST · Nov 20, 2026 · 160 m away
  • Building permit

    Proposed fire damages repair

    223 CARLTON ST · Nov 18, 2026 · 245 m away
  • Building permitlaneway suite

    Proposal to construct a new laneway suite (Unit # R)

    9 SPRUCE ST · Nov 12, 2026 · 167 m away
  • Minor variancePending

    In Progress

    306 GERRARD ST E · Nov 10, 2026 · 136 m away
  • Building permit

    Proposal to lower the existing basement via underpinning, interior alterations unfinished basement renovation in single family dwelling

    231 SEATON ST · Nov 10, 2026 · 239 m away
  • Building permit

    FS - Sprinkler Shop Drawing - Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building

    209 CARLTON ST · Nov 9, 2026 · 258 m away
  • Building permit

    PROPOSAL TO REPLACE DAMAGED SECOND FLOOR DECK PLATFORM FRAMINGEXISTING DECK POSTS AND FOUNDATIONS TO REMAIN UNCHANGED

    416 ONTARIO ST · Nov 6, 2026 · 188 m away
  • Building permit

    Electromagnetic locks for a proposed multi-unit residential building. (2 Maglocks)

    227 GERRARD ST E · Nov 4, 2026 · 207 m away
  • Building permitmultiplex

    Proposal for the legalization of the 5th unit at the existing 4th unit building.

    216 GERRARD ST E · Nov 2, 2026 · 257 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station19 min walk
Nearest TTC stop
Parliament St at Gerrard St East1 min walk
Nearest cycling route
Gerrard St EBike Lane, 1 min walk
Nearest traffic count
18,435 vehicles in 14 hGerrard St E / Parliament St (South), 70 m away, Jul 9, 2024
Serious collisions within 500 m
112021–2026, killed or seriously injured: 2 fatal, 9 with pedestrians, 0 with cyclists
Parks
Anniversary Park1 min walk
Oak Street Parkette3 min walk
Winchester Square Park6 min walk

Schools within 1 km

  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 2 min walk
  • SPRUCECOURT JR PUBLIC SCHOOL English Public 7 min walk
  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 9 min walk
  • MONSIGNOR FRASER - ST MARTIN CAMPUS English Separate 11 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 11 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.