HousePrecheckCheck an address

2685 Kingston RdToronto · zoning, lot size and permit records

Also 2685 Kingston Rd

≈ 169.0 × 268.8 m33,905 m²on Kingston Rdcorner, also on Brimley Rd S

Not a home

St John Henry Newman Catholic High School (Future Site)

The City's school locations place St John Henry Newman Catholic High School (Future Site) on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelRecent records on this lot: 24 226036 (The existing Scarborough Foreign Mission building will be partially demolished with the..., 2024); 21 168207 (Proposal to construct a new 3 storey secondary school with 1 level Basement (St. John H..., 2021); 20 144828 ESC 20 SA (Redevelopment of existing school site. Demolition of existing school and construction o..., 2020). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 14 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N50 m
≈ 169.0 m frontage≈ 268.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 226036 (The existing Scarborough Foreign Mission building will be partially demolished with the..., 2024); 21 168207 (Proposal to construct a new 3 storey secondary school with 1 level Basement (St. John H..., 2021); 20 144828 ESC 20 SA (Redevelopment of existing school site. Demolition of existing school and construction o..., 2020).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 14 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 224672 ELS 00 IRClosed

    Election Signs

    Aug 24, 2026 · 2685 KINGSTON RD
  • By-law investigation25 208329 WST 00 IRClosed

    Waste

    Aug 11, 2025 · 2685 KINGSTON RD
  • Building permit24 226036Under Reviewdemolition

    The existing Scarborough Foreign Mission building will be partially demolished with the remaining portion to form part of the new school St. John Henry Newman secondary school.

    Oct 15, 2024 · 2685 KINGSTON RD
  • Building permit20 156191Closed

    REVISION TO CHANGE FOOTINGS OF GROUND SIGN.**St John Newman Catholic Secondary School****New School Coming Soon**

    Mar 25, 2022 · 2685 KINGSTON RD
  • Building permit21 168207Under Review

    Proposal to construct a new 3 storey secondary school with 1 level Basement (St. John Henry Newman Catholic HS). It will incorporate the existing Scarborough Foreign Mission Building which will be partially demolished with the remaining portion to form part of the new School.

    Jun 9, 2021 · 2685 KINGSTON RD
  • Zoning review20 144828 PSPClosed
    Nov 13, 2020 · 2685 KINGSTON RD
  • Development application20 144828 ESC 20 SANOAC Issued

    Redevelopment of existing school site. Demolition of existing school and construction of a new secondary school.

    May 13, 2020 · 2685 KINGSTON RD · City file
  • Zoning review20 143054 ZPRClosed
    May 7, 2020 · 2685 KINGSTON RD
Show 6 older records
  • Building permit15 140101Closed

    To install 2 Backflow prevention devices. Device "A" on a 3" supply line and device "B" on a 2" supply line as per applicant.

    Apr 14, 2015 · 2685 KINGSTON RD
  • Building permit11 146748Closed

    install 1 30" lift from one floor to another in retirement residence

    May 13, 2011 · 2685 KINGSTON RD
  • Building permit08 209058Closed

    install solar hot water system to pre-heat domestic water

    Jan 15, 2009 · 2685 KINGSTON RD
  • Building permit06 129239Closed

    replace existing retaining wall @ rear (south of property)

    May 15, 2006 · 2685 KINGSTON RD
  • Building permit05 132414Closed

    REVISION TO FRONT ENTRY TO IMPROVE STAIR EXIT (SEE ATTACHED NOTE)

    Feb 10, 2006 · 2685 KINGSTON RD
  • Building permit04 117218Closed

    HVAC - INTERIOR RENOVATION TO MISSION SCARBORO MISSIONS - Interior Alterations

    Mar 22, 2004 · 2685 KINGSTON RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
33,905 m²
Frontage
169 mestimated, irregular lot
Depth
268.8 mestimated, irregular lot
Street
Kingston Rd
Corner lot
Yes, also on Brimley Rd S268.8 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: honey locust (27 cm), apple (20 cm), maple, norway (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%14 of 15 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
2
Development applications
6

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To legalize and maintain interlock paving in the south side yard and in the east rear yard. The existing dwelling will remain unchanged. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on April 8 2026.

    131 CHINE DR · Aug 12, 2026 · 432 m away
  • Minor varianceApproved

    To construct a one-storey rear addition with a second storey rear balcony on the north side of the exiting dwelling, as well as a new rear deck.

    24 ST QUENTIN AVE · Jul 8, 2026 · 219 m away
  • Minor varianceApproved

    To demolish the existing one-storey dwelling and to construct a new two-storey dwelling.

    91 EASTVILLE AVE · Jan 16, 2025 · 470 m away
  • Minor varianceApproved

    To construct a new 2-storey dwelling.

    90 GRADWELL DR · May 1, 2024 · 334 m away
  • Minor varianceApproved

    To construct a garden suite in the rear yard.

    39 THATCHER AVE · Apr 3, 2024 · 165 m away

Latest activity nearby

  • Building permit

    Proposed roof mounted solar panel installation

    57 THATCHER AVE · Nov 23, 2026 · 179 m away
  • Zoning review

    Notice Sent

    9 THATCHER AVE · Sep 22, 2026 · 218 m away
  • Building permit

    REV 01: BALCONYProposal for rear addition and new deck

    24 ST QUENTIN AVE · Aug 14, 2026 · 219 m away
  • Building permit

    REVISION - revised plan - Room #9Proposal for fire damage repairs in one room, including replacement for loadbearing walls and roof joists.

    2733 KINGSTON RD · Jul 23, 2026 · 168 m away
  • Minor varianceApproved

    To construct a one-storey rear addition with a second storey rear balcony on the north side of the exiting dwelling, as well as a new rear deck.

    24 ST QUENTIN AVE · Jul 8, 2026 · 219 m away
  • Building permit

    Proposed change of use from Motel to Assembly for Prayer

    2740 KINGSTON RD · Jul 2, 2026 · 231 m away
  • Building permitmultiplex, new building, new house

    Revision 01: Revision to permit (as bubbled)Proposal to construct a two stroey three unit dwelling with a rear yard deck and a basement walkout.

    47 THATCHER AVE · Jun 18, 2026 · 162 m away
  • Building permit

    Proposed localized concrete repairs and window replacement

    1 BRIMLEY RD · Jun 10, 2026 · 296 m away
  • Minor variancePending

    Cancelled

    24 ST QUENTIN AVE · Apr 24, 2026 · 219 m away
  • Zoning review

    Application On Hold

    24 ST QUENTIN AVE · Mar 27, 2026 · 219 m away

Neighbourhood: Cliffcrest

About the area around the lot, not the lot itself.

Nearest station
Scarborough GO Station20 min walk
Nearest TTC stop
Kingston Rd at Brimley Rd2 min walk
Nearest cycling route
Kingston RdSharrows, 1 min walk
Nearest traffic count
30,679 vehicles in 14 hKingston Rd / Brimley Rd / Brimley Rd S, 160 m away, Sep 25, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Bluffer's Park4 min walk
Barkdene Park8 min walk
Totts Tot Lot10 min walk

Schools within 1 km

  • ST JOHN HENRY NEWMAN CATHOLIC HIGH SCHOOL (FUTURE SITE) English Separate 1 min walk
  • ST THERESA SHRINE CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • ST JOHN HENRY NEWMAN CATHOLIC HIGH SCHOOL English Separate 4 min walk
  • R H KING ACADEMY English Public 11 min walk
  • JOHN A LESLIE PUBLIC SCHOOL English Public 12 min walk
  • CHINE DRIVE PUBLIC SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCliffcrestMedian neighbourhood
Median household income (2020)$92,000$84,500
Households that own their home64%54%
Population (2021)16,13016,813
Homes built in 1960 or before44%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCliffcrestCity median
Assault803.6636.3
Robbery127.569.5
Shootings11.110.5
Auto theft271.6192.6
Theft over $5,00038.846.1
Break and enter188.4172.8
Theft from vehicles465.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.