HousePrecheckCheck an address

2662 Bloor St WToronto · zoning, lot size and permit records

Residential apartment · RA (x70)≈ 57.5 × 112.2 m4,652 m²on Old Mill Trlcorner, also on Bloor St W

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 20 223005 (Propose to install new security door at the bottom of the E tower stainrwell, c/w card..., 2020, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Old MillThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 57.5 m frontage≈ 112.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (19% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (13% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 20 223005 (Propose to install new security door at the bottom of the E tower stainrwell, c/w card..., 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (15% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit20 223005Permit Issued

    Propose to install new security door at the bottom of the E tower stainrwell, c/w card access reader and automatic door opener.

    Dec 29, 2020 · 2662 BLOOR ST W
  • Building permit05 119977Closed

    To install two magnetic locks to P1and P2 level of new residential building.

    Apr 26, 2005 · 2662 BLOOR ST W
  • Zoning review03 100617 ZSVClosed
    Jan 7, 2003 · 2662 BLOOR ST W
  • Zoning review02 192383 ZPRClosed
    Nov 27, 2002 · 2662 BLOOR ST W
  • Building permit02 161953Closed

    To install two magnetic locks to new residential building.

    Sep 13, 2002 · 2662 BLOOR ST W
  • Zoning review01 183862 ZSVClosed
    Oct 9, 2001 · 2662 BLOOR ST W
  • Building permit01 205411Closednew building

    THIS IS A RECREATION (NOT EXACT) OF C90536 A NEW 121 SUITE APARTMENT BUILDING

    Jul 4, 2001 · 2662 BLOOR ST W
  • Building permit99 083855Closed - Dormantnew building

    NEW 121 SUITE APARTMENT BUILDING

    Jul 4, 2001 · 2662 BLOOR ST W
Show 2 older records
  • Building permit99 083991Closed - Dormant

    FIXT./SANI/STORM & WATER - NEW APT BLDG.

    May 2, 2000 · 2662 BLOOR ST W
  • Building permit99 116373Closed

    Related Permits: Foundation permit only Permit# 99-111016-- Part of Bldg. Permit application C90536 (Supper Structure) Roll # 2860 ***** WAS 2666 Bloor St. W. now 2662 Bloor St. W. *********

    Dec 16, 1999 · 2662 BLOOR ST W

Check before you build

  • Site-specific exception 900.7.10(70)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(70)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of Etobicoke by-law 1996-205.

By-law 569-2013, Chapter 900

Lot facts

Area
4,652 m²
Frontage
57.5 mestimated, irregular lot
Depth
112.2 mestimated, irregular lot
Street
Old Mill Trl
Corner lot
Yes, also on Bloor St W112.2 m along it
Public lane
None
Max height
14 m
Max lot coverage
40%
  • Major Transit Station Area: Old Mill. The lot is inside the Old Mill Major Transit Station Area approved by the Province (Site and Area Specific Policy 635). Source
  • Zone RA (x70) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct two new above and below grade station elevators that will be located along the north and south sides. This addition will accommodate the existing subway station.

    2672 BLOOR ST W · Mar 24, 2022 · 57 m away

Latest activity nearby

  • Building permit

    Interior renovations to lawfully existing dwelling unit in lawfully existing building.

    71-73 OLD MILL RD · Oct 8, 2026 · 234 m away
  • Zoning review

    Notice Sent

    2679 BLOOR ST W · Sep 30, 2026 · 268 m away
  • Zoning review

    Cancelled

    2679 BLOOR ST W · Sep 28, 2026 · 268 m away
  • Zoning review

    Notice Sent

    2679 BLOOR ST W · Sep 28, 2026 · 268 m away
  • Building permitdemolition

    Construct New Single Family Detached stucco and stone house with integral three car garage, outdoor swimming pool and associated landscaping

    76 OLD MILL RD · Jul 8, 2026 · 288 m away
  • Building permitnew building, new house

    Construct New Single Family Detached stucco and stone house with integral three car garage, outdoor swimming pool and associated landscaping

    76 OLD MILL RD · Jul 8, 2026 · 288 m away
  • Building permit

    Proposed garage ramp restoration repairs.

    40 OLD MILL RD · May 25, 2026 · 205 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage, and a pool in the front yard.

    76 OLD MILL RD · Jan 29, 2026 · 288 m away
  • Building permit

    REVISION 03 - Shoring and Excavation Work To Add Two New Elevators To The Existing Station.REVISION 02 - Revision work involves shoring and micropile work as the excavation support systemREVISION 01 - Proposed changes the building permit documentation include the location and construction assembly of the south wall. The south wall has shifted north into the corridor and the assembly of the wall has been revised from cast-in-place concrete to 140mm concrete masonry with a sintered ceramic rainscreen cladding. The fire resistance rating of the exposed building face has been updated to 1hr on drawing AF03 to be consistent with the requirements of OBC Table 3.2.3.7 as noted on AA02. To add 2 new elevators to TTC's Old Mill Station to accommodate Accessibility_ 110 m2 above garde and 148 m2 below. Shoring for excavation 37 mSee 22-141983 ALT

    2672 BLOOR ST W · Dec 10, 2025 · 57 m away
  • Zoning review

    Closed

    76 OLD MILL RD · Oct 27, 2025 · 288 m away

Neighbourhood: Kingsway South

About the area around the lot, not the lot itself.

Nearest station
Old Mill Station1 min walk
Nearest TTC stop
Bloor St West at Old Mill Trail1 min walk
Nearest cycling route
Bloor St WCycle Track, 1 min walk
Nearest traffic count
17,525 vehicles in 14 hBloor St W / Old Mill Trl, 80 m away, May 13, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
King's Mill Park1 min walk
Home Smith Park3 min walk
Humber Marshes4 min walk

Schools within 1 km

  • BLYTH ACADEMY SCHOOL - ETOBICOKE Private 11 min walk
  • ST PIUS X CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
  • SUMMIT MICRO SCHOOL Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKingsway SouthMedian neighbourhood
Median household income (2020)$184,000$84,500
Households that own their home81%54%
Population (2021)8,85516,813
Homes built in 1960 or before59%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKingsway SouthCity median
Assault513.1636.3
Robbery2969.5
Auto theft125.9192.6
Theft over $5,00058.146.1
Break and enter271.1172.8
Theft from vehicles48.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.