HousePrecheckCheck an address

265 Alton Towers CrclToronto · zoning, lot size and permit records

IPW (x79)50.6 × 120.7 m6,068 m²on Alton Towers Crcl

Not a home

A place of worship

The zoning by-law sets this parcel aside for a place of worship. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A place of worshipParking and traffic around services, often at weekends.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
50.6 m frontage120.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A238/07SC (The applicant proposes to construct an addition to house a choir area on the east side..., 2007).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Zoning review12 137689 ZPRClosed
    Mar 15, 2012 · 265 ALTON TOWERS CRCL
  • Building permit08 197846Closed

    HVAC - construct addition to the southeast side of the nave

    Apr 7, 2009 · 265 ALTON TOWERS CRCL
  • Minor varianceA238/07SCApproved

    The applicant proposes to construct an addition to house a choir area on the east side of the existing Church of the Prince of Peace. In 1986 and 1996, the Committee approved variances for reduced rates of parking and allowed 92 parking spaces on-site. A lease agreement exists between the Church and the adjacent Separate School site for an additional 30 spaces.

    Aug 22, 2007 · 265 ALTON TOWERS CRCL
  • Zoning review07 242426 ZPRClosed
    Jul 12, 2007 · 265 ALTON TOWERS CRCL

Check before you build

  • Site-specific exception 900.34.10(79)

    Needs a closer look

    3 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.34.10(79)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that abuts a street is 3.0 metres

  2. Rule B

    Parking spaces must be provided at a minimum rate of 7.7 for each 100 square metres of gross floor area

  3. Rule C

    The maximum height of a building is the height of the building that lawfully existed on the date of the enactment of this By-law, excluding any spire, belfry or similar architectural feature.

By-law 569-2013, Chapter 900

Lot facts

Area
6,068 m²
Frontage
50.6 m
Depth
120.7 m
Street
Alton Towers Crcl
Corner lot
No
Public lane
None
House footprint
1,537 m²roof up to 8.7 m
Back yard
57.2 mhouse to rear lot line
Side yards
2.9 m and 8 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
40%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone IPW (x79) (Institutional Place of Worship). Chapter 80, section 80.50 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    3 Ground Signs ** TIM HORTONS **

    240 ALTON TOWERS CRCL · May 15, 2026 · 213 m away
  • Zoning review

    Re-Examined

    240 ALTON TOWERS CRCL · Jan 27, 2026 · 213 m away
  • Building permit

    REPLACEMENT OF EXISTING WINDOW AND SKYLIGHT WITH NEW

    380 GOLDHAWK TRL · Jul 25, 2024 · 262 m away
  • Building permit

    Proposal to construct interior alterations to set up a Herbs Steam Store

    240 ALTON TOWERS CRCL · Jun 25, 2024 · 213 m away
  • Building permit

    Proposed Fire alarm panel replacement and installation and programming for Elevator recall as per ASME 17.1-2010/CSA B144-10 Safety Code for Elevators

    240 ALTON TOWERS CRCL · Jun 17, 2024 · 213 m away
  • Building permit

    Install first party ground sign

    410 GOLDHAWK TRL · Jun 5, 2024 · 157 m away
  • Building permit

    1 Ground Sign

    410 GOLDHAWK TRL · May 23, 2024 · 157 m away
  • Building permit

    Interior Alterations to Group D suite - new dental office

    240 ALTON TOWERS CRCL · Jun 6, 2023 · 213 m away
  • Building permit

    Replacement of existing DX cooling coil and condensing unit serving air handling system

    255 ALTON TOWERS CRCL · Oct 18, 2022 · 85 m away
  • Zoning review

    Closed

    240 ALTON TOWERS CRCL · Sep 29, 2022 · 213 m away

Neighbourhood: Milliken

About the area around the lot, not the lot itself.

Nearest TTC stop
McCowan Rd at Milliken Wells Shopping Centre5 min walk
Nearest cycling route
Milliken Park TrlMulti-Use Trail - Existing Connector, 6 min walk
Nearest traffic count
5,636 vehicles in 14 hAlton Towers Crcl / Goldhawk Trl (North), 170 m away, Jun 16, 2026
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Goldhawk Park1 min walk
Milliken Park6 min walk
Muirlands Park11 min walk

Schools within 1 km

  • PRINCE OF PEACE CATHOLIC ELEMENTARY SCHOOL English Separate 1 min walk
  • BANTING AND BEST PUBLIC SCHOOL English Public 4 min walk
  • ECOLE ELEMENTAIRE LAURE RIESE French Public 4 min walk
  • AGNES MACPHAIL PUBLIC SCHOOL English Public 10 min walk
  • THE DIVINE INFANT CATHOLIC ELEMENTARY SCHOOL & MSGR FRASIER NORTHEAST English Separate 12 min walk
  • PORT ROYAL PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMillikenMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home88%54%
Population (2021)23,98016,813
Homes built in 1960 or before2%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMillikenCity median
Assault334.2636.3
Robbery197.569.5
Shootings1910.5
Auto theft607.7192.6
Theft over $5,000125.346.1
Break and enter254.5172.8
Theft from vehicles398.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.