HousePrecheckCheck an address

2645 Kipling AveToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (f24.0; au67.0) (x96)≈ 115.5 × 137.6 m11,036 m²on Panorama Crtcorner, also on Kipling Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 15 243695 (Proposal for repairs on parking garage, repair of concrete garage slab, replacement of..., 2016, status Inspection); 05 182379 (Balcony repairs to an existing multi-residential condominium (204 balconies), 2005, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • 2 open by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 209410 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 158154 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • Major Transit Station Area: Mount OliveThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 115.5 m frontage≈ 137.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (3% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (1% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 2 open by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 209410 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 158154 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 15 243695 (Proposal for repairs on parking garage, repair of concrete garage slab, replacement of..., 2016, status Inspection); 05 182379 (Balcony repairs to an existing multi-residential condominium (204 balconies), 2005, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 15 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Notice Issued Prop Standards, Order Issued Property Standards, Property Standards): 26 218030 PRS 00 IR (Property Standards, 2026); 26 195041 PRS 00 IR (Property Standards, 2026); 26 178445 HEA 00 IR (Adequate Heat, 2026); and 12 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 218030 PRS 00 IRClosed

    Property Standards

    Aug 11, 2026 · 2645 KIPLING AVE
  • By-law investigation26 209410 PRS 00 IRRescheduled

    Property Standards

    Jul 27, 2026 · 2645 KIPLING AVE
  • By-law investigation26 195041 PRS 00 IRClosed

    Property Standards

    Jul 2, 2026 · 2645 KIPLING AVE
  • By-law investigation26 178445 HEA 00 IRClosed

    Adequate Heat

    Jun 5, 2026 · 2645 KIPLING AVE
  • By-law investigation26 196832 PRS 00 IVClosed

    Order Issued Property Standards: The property is not being kept free of pests.

    May 27, 2026 · 2645 KIPLING AVE
  • By-law investigation26 168156 PRS 00 IRClosed

    Property Standards

    May 27, 2026 · 2645 KIPLING AVE
  • By-law investigation26 163745 PRS 00 IRClosed

    Property Standards

    May 20, 2026 · 2645 KIPLING AVE
  • By-law investigation26 160967 PRS 00 IRClosed

    Property Standards

    May 14, 2026 · 2645 KIPLING AVE
Show 15 older records
  • By-law investigation26 158154 PRS 00 IRRescheduled

    Property Standards

    May 10, 2026 · 2645 KIPLING AVE
  • By-law investigation26 122758 PRS 00 IRClosed

    Property Standards

    Feb 28, 2026 · 2645 KIPLING AVE
  • By-law investigation25 231449 PRS 00 IRClosed

    Property Standards

    Sep 26, 2025 · 2645 KIPLING AVE
  • By-law investigation25 196566 PRS 00 IRClosed

    Property Standards

    Jul 19, 2025 · 2645 KIPLING AVE
  • By-law investigation25 255538 PRS 00 IVClosed

    Order Issued Property Standards: Dwelling unit window that is capable of being opened has no screen. Namely bedroom window missing screen.; Exterior door, window, skylight or basement hatchway not maintained in good repair. Specifically, balcony sliding screen door in disrepair. Screen door is off; Floor(s) and/or floor covering(s) not maintained free from trip or other hazardous condition. Namely, threshold floor transition to Master bedroom in disrepair ; Immediate action has not been taken to eliminate an unsafe condition. Namely, stove missing side panel and warmer drawer is mismatched and doesnt fit in the sto; Interior door hardware not maintained in good repair. Namley, Master Bedroom Closet door missing door handle.; Interior door(s), frames(s), glass pane(s), and/or hardware not maintained in good repair. Specifically, bedroom door handle in disrepair.; Interior lighting fixtures or lamps are not maintained. Specifically, Master Bedroom light fixture is not working.; Meals are being prepared in the room in which the required counter, backsplash and drain board are not made of a material impervious to water. Specifically, kit; Previously finished surface(s) in the public area of the property is not maintained in good repair. Specifically, kitchen counter top in between fridge and stov; The cupboard is not maintained in good repair and good working order. Namely, lower cupboard drawer, in between fridge and stove, missing handle/knob..; The floor and every appurtenance, surface cover and finish is not maintained. Specifically, flooring to wall missing baseboard and trim.; The supplied appliance(s) is not maintained in good repair and good working order. Specifically, kitchen stove missing side wall and has an unmatched warming d; The supplied facility in or on the property is not constructed, installed and/or maintained so that it will function safely and effectively. Namely, bathroom w; The supplied facility in or on the property is not kept in a satisfactory working condition. Specifically, dininig room light and fan fixture not functioning.; The window that is capable of being opened is not capable of being locked or otherwise secured from inside the building. Namely, bedroom window incapable of lo; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials. Specifically, hole in bedroom wall.

    Apr 22, 2025 · 2645 KIPLING AVE
  • By-law investigation25 147407 PRS 00 IRClosed

    Property Standards

    Apr 22, 2025 · 2645 KIPLING AVE
  • By-law investigation25 118372 HEA 00 IRClosed

    Adequate Heat

    Feb 18, 2025 · 2645 KIPLING AVE
  • By-law investigation24 251974 PRS 00 IVClosed

    Notice Issued Prop Standards: All repairs shall be made in a good workmanlike manner.; The electrical fixtures are not maintained in good working order.; The plumbing system is not kept free from leaks or defects.

    Dec 19, 2024 · 2645 KIPLING AVE
  • By-law investigation24 251966 PRS 00 IRClosed

    Property Standards

    Dec 19, 2024 · 2645 KIPLING AVE
  • Building permit15 243695Inspection

    Proposal for repairs on parking garage, repair of concrete garage slab, replacement of loose concrete and corroded rebars on P1 and P2.

    Mar 17, 2016 · 2645 KIPLING AVE
  • Building permit05 152082Closed

    Retrofit - Emergency propane stand-by gas supply system on roof of apartment building in existing mechanical enclosure (6 tanks)

    Dec 28, 2005 · 2645 KIPLING AVE
  • Building permit05 182379Inspection

    Balcony repairs to an existing multi-residential condominium (204 balconies).

    Oct 17, 2005 · 2645 KIPLING AVE
  • Building permit01 106971Closed

    Upgrade Domestic Hot Water Piping in Penthouse mechanical room

    Feb 1, 2001 · 2645 KIPLING AVE
  • Building permit98 084577Closed

    SHORING GARAGE SLAB TO APARTMENT BLDG.

    Aug 6, 1999 · 2645 KIPLING AVE
  • Building permit99 083639Closed - Dormant

    PARKING GARAGE REPAIRS TO APT. BUILDING

    Aug 6, 1999 · 2645 KIPLING AVE

Check before you build

  • Site-specific exception 900.8.10(96)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(96)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of Etobicoke By-law Nos. 1766 and 1805.

By-law 569-2013, Chapter 900

Lot facts

Area
11,036 m²
Frontage
115.5 mestimated, irregular lot
Depth
137.6 mestimated, irregular lot
Street
Panorama Crt
Corner lot
Yes, also on Kipling Ave137.6 m along it
Public lane
None
Max height
—
Max lot coverage
20%
  • Major Transit Station Area: Mount Olive. The lot is inside the Mount Olive Major Transit Station Area approved by the Province (Site and Area Specific Policy 705). Source
  • Minimum frontage 24 m. Frontage is about 115.5 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RAC (f24.0; au67.0) (x96) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust skyline (8 cm), honey locust skyline (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing swimming pool and unused storage lockers into 10 additional dwelling units, for a total of 186 residential units.

    40 STEVENSON RD · Mar 10, 2022 · 411 m away
  • Minor varianceApproved

    To convert the existing storage space into seven new dwelling units. A total of 235 dwelling units will be provided as well as a new fitness room and multipurpose room.

    46 PANORAMA CRT · Nov 16, 2021 · 387 m away

Latest activity nearby

  • Building permit

    Proposal for new elevator with enclosure and new ramp to stage from auditorium with new barrier free universal toilet room.

    2580 KIPLING AVE · Jun 12, 2026 · 155 m away
  • Building permit

    1 Ground Sign*****St. ANDREW CATHOLIC******ELEMENTARY SCHOOL

    2533 KIPLING AVE · May 29, 2026 · 295 m away
  • Zoning review

    Closed

    2533 KIPLING AVE · Feb 25, 2026 · 295 m away
  • Building permit

    1 Ground Sign

    2533 KIPLING AVE · Jan 16, 2026 · 295 m away
  • Building permit

    Replacement of Fire Alarm Control Panel and Devices

    2533 KIPLING AVE · Oct 20, 2025 · 295 m away
  • Building permit

    1 Ground Sign

    2533 KIPLING AVE · Aug 18, 2025 · 295 m away
  • Building permit

    Repairs of Underground Parking Garage and Installation of new Pedestrian-used Barrier-Free Accessible ramps at P1 & P2 Parking level.

    18 PANORAMA CRT · Jul 2, 2025 · 111 m away
  • Building permit

    Proposal for balcony and garage repairs. Replacement of all gaurdrails and local concrete repair for garage roof slab for an existing apartment buidling.

    2548 KIPLING AVE · Jul 22, 2024 · 255 m away
  • Building permitdemolition, new building, new house, secondary suite

    REVISION - add a 2nd suite in the basementpropose to demolish existing house and build a new 2 storey dwelling unit

    19 STRATHAVON DR · May 29, 2024 · 281 m away
  • Building permit

    New door operator and new chair lift

    21 PANORAMA CRT · Feb 23, 2024 · 195 m away

Neighbourhood: Mount Olive-Silverstone-Jamestown

About the area around the lot, not the lot itself.

Nearest station
Mount Olive Station8 min walk
Nearest TTC stop
Kipling Ave at Mount Olive Dr1 min walk
Nearest cycling route
Kipling Ave Bicycle TrlMulti-Use Trail - Boulevard, 1 min walk
Nearest traffic count
19,781 vehicles in 14 hKipling Ave / Mount Olive Dr / Panorama Crt / Kipling Ave Bicycle Trl, 90 m away, Jun 2, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Humberview Park1 min walk
Rowntree Mills Park2 min walk
Panorama Park3 min walk

Schools within 1 km

  • NORTH ALBION COLLEGIATE INSTITUTE English Public 3 min walk
  • ST ANDREW CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • HIGHFIELD JR SCHOOL English Public 8 min walk
  • NORTH KIPLING JR MDL SCHOOL English Public 8 min walk
  • ALBION LINC English Public 11 min walk
  • BEAUMONDE HEIGHTS JR MDL SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Olive-Silverstone-JamestownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home46%54%
Population (2021)31,34516,813
Homes built in 1960 or before14%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Olive-Silverstone-JamestownCity median
Assault788.6636.3
Robbery107.369.5
Homicide2.95.3
Shootings20.310.5
Auto theft275.4192.6
Theft over $5,00026.146.1
Break and enter55.1172.8
Theft from vehicles130.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.