Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
5 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 250003 HEA 00 IR (Adequate Heat, 2026); 26 241633 PRS 00 IR (Property Standards, 2026); 26 225749 PRS 00 IR (Property Standards, 2026); and 2 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations7 development applications open within 300 m
Good to know7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 100 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 72 units, built 1929).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- By-law investigation26 250003 HEA 00 IRClosed
Adequate Heat
Oct 6, 2026 · 262 JARVIS ST - By-law investigation26 241633 PRS 00 IRClosed
Property Standards
Sep 22, 2026 · 262 JARVIS ST - By-law investigation26 225749 PRS 00 IRClosed
Property Standards
Aug 25, 2026 · 262 JARVIS ST - By-law investigation26 219981 PRS 00 IRClosed
Property Standards
Aug 14, 2026 · 262 JARVIS ST - By-law investigation25 181488 PRS 00 IRClosed
Property Standards
Jun 22, 2025 · 262 JARVIS ST - Building permit25 122859Closed
Proposal for installation of heat pump.
Mar 5, 2025 · 262 JARVIS ST - Building permit13 187576Closed
Proposal to install 2 backflow prevention devices in existing apartment building.
Jun 20, 2013 · 262 JARVIS ST - Building permit01 189640Closed
alter plan as approved by installing emergency light, pull stations, poc & exit sign and delete proposed construction of secondary basement exit
Jul 24, 2002 · 262 JARVIS ST
Show 2 older records
- Building permit01 172536Closed
Install 14 Sprinkler heads in the basement.
Feb 11, 2002 · 262 JARVIS ST - Zoning review84 026640 LTOClosedJul 10, 1984 · 262 JARVIS ST
Check before you build
Site-specific exception 900.11.10(2091)
Needs a closer look1 site-specific rule and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 256 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 1,062 m²
- Frontage
- 22.1 m
- Depth
- 48.3 m
- Street
- Jarvis St
- Corner lot
- No
- Public lane
- None
- House footprint
- 569 m²roof up to 22 m
- Back yard
- 3.5 mhouse to rear lot line
- Side yards
- 3.8 m and 4.2 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c2.0; r4.0) SS1 (x2091) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: ginkgo (56 cm), ginkgo (32 cm), ginkgo (17 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%17 of 17 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 1
- Multiplex permits
- 7
- Development applications
- 22
Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 300 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 393 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 477 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 474 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 325 m away
Latest activity nearby
- Zoning review
Not Started
319 GEORGE ST · Nov 26, 2026 · 165 m away - Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 268 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 66 m away - Building permit
1 Wall Sign***** T-DOT DENTAL*****
306 JARVIS ST · Nov 17, 2026 · 239 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 231 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 231 m away - Building permit
REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
355 CHURCH ST · Oct 30, 2026 · 216 m away - Building permit
Proposal to install a maglock in existing office space.
355 CHURCH ST · Oct 28, 2026 · 216 m away - Building permit
Proposal to construct pedestrian ramp.
117 PEMBROKE ST · Oct 27, 2026 · 267 m away - Building permit
Proposed storage addition on the parking area in the building
105 CARLTON ST · Oct 15, 2026 · 286 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station8 min walk
- Nearest TTC stop
- Carlton St at Jarvis St5 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 1 min walk
- Nearest traffic count
- 12,199 vehicles in 8 hJarvis St / Gerrard St E, 90 m away, Dec 3, 2022
- Serious collisions within 500 m
- 202021–2026, killed or seriously injured: 2 fatal, 14 with pedestrians, 4 with cyclists
- Parks
- Allan Gardens2 min walk
- Toronto Metropolitan University Square6 min walk
- Arena Gardens6 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 5 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
- TAIE INTERNATIONAL INSTITUTE SCHOOL Private 5 min walk
- LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 6 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.