HousePrecheckCheck an address

260 Yonge StToronto · zoning, lot size and permit records

Also 290 Yonge St, 33 Dundas St W

≈ 106.6 × 178.8 m12,612 m²on Dundas Sqcorner, also on Yonge St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 264348 (Installation of a seasonal decorative Christmas wreath (designated structure) attached..., 2026); 24 251212 (REV 1: PER ATTACHED DETAIL SHEETProposal for Alteration of existing retail suite, new i..., 2025); 25 158205 (2 Projecting Signs on the third storey, east elevation and 2 wall signs, third storey,o..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 13 development applications open within 300 m, up to 71 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N50 m
≈ 106.6 m frontage≈ 178.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 building permits open, the oldest since 2014

    Needs a closer look

    Still open in the City's records: 23 163805 (REVISION 01: escalator PitAdding new escalator Pit, 2023, status Revision Issued); 23 125387 (i)Alteration to existing base building fire protection sprinkler and standpipe system t..., 2023, status Inspection); 22 127084 (REV 01: reduced size of the opening in the floor slab on the 7th floor & revision to st..., 2022, status Revision Issued); and 2 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 264348 (Installation of a seasonal decorative Christmas wreath (designated structure) attached..., 2026); 24 251212 (REV 1: PER ATTACHED DETAIL SHEETProposal for Alteration of existing retail suite, new i..., 2025); 25 158205 (2 Projecting Signs on the third storey, east elevation and 2 wall signs, third storey,o..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 13 development applications open within 300 m

    Good to know

    13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

71 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 264348Permit Issued

    Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.

    Nov 6, 2026 · 260 YONGE ST
  • Building permit26 261058Cancelled

    1 overhanging structure sign**SIMONS CHRISTMAS WREATH**

    Oct 27, 2026 · 260 YONGE ST
  • Building permit26 255084Cancelled

    1 overhanging structure sign**SIMONS CHRISTMAS WREATH**

    Oct 15, 2026 · 260 YONGE ST
  • Building permit26 227124Cancelled

    1 overhanging structure sign**SIMONS**

    Aug 27, 2026 · 260 YONGE ST
  • Building permit25 265960Closed

    Proposal to modify fire alarm sequence of operation in existing multiple unit building.

    Dec 17, 2025 · 33 DUNDAS ST W
  • Building permit24 251212Revision Issued

    REV 1: PER ATTACHED DETAIL SHEETProposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distribution. New vertical transportation (elevator, staircase)

    Nov 5, 2025 · 260 YONGE ST
  • Building permit25 158205Permit Issued

    2 Projecting Signs on the third storey, east elevation and 2 wall signs, third storey,one on the east and one on the south elevation. (Approved as per variance # 25-173005)3 Wall Signs on the first storey, east elevation.**SIMONS**

    Sep 11, 2025 · 260 YONGE ST
  • Building permit24 102861Closed

    Rev 03 - Alterations to an existing storage space at the Toronto Eaton Centre converted to an office area for the Toronto Police Services.Rev 02 - Revised plansRevision #01 - Proposed alterations and renovations to re-demise the existing space at the Toronto Eaton Centre occupied by Nordstrom on Levels 3, 4 and 5 back to Base Building; including the demolition of the existing Facade for future Tenant Facades.Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.

    Jul 10, 2025 · 260 YONGE ST
Show 63 older records
  • Building permit25 179486Closed

    1 wall sign + 1 overhanging structure sign**EATALY**

    Jun 27, 2025 · 260 YONGE ST
  • Zoning review25 173005 ZMPUnder Review
    Jun 6, 2025 · 260 YONGE ST
  • Building permit25 123291Closed

    Proposed addition of Fire Hose Cabinet in sales area, fitting room adjustment (removed few stalls added more sales area), and new Fan coil unit in staff lounge.

    Apr 8, 2025 · 260 YONGE ST
  • Building permit24 243692Closed

    Revision 01 - see cover letter attached to drawingsNew tenant - Proposed interior/exterior alerations

    Mar 6, 2025 · 260 YONGE ST
  • Building permit25 122201Approved

    This Alternative Solution addresses the approach developed to permit the vertical stair opening within the Nike - Rise suite (CRU 300/A038S on Levels 3 and 4 of the Toronto Eaton Centre (TEC) located in Toronto, Ontario. It is proposed to have a 1.8 m wide by 3.7 m high vertical opening in the fire separation to allow movement of occupants to and from the stair. The total area of the vertical opening will be 6.7 m2. Refer to the LRI Report dated February 24, 2025 for more information.

    Feb 26, 2025 · 260 YONGE ST
  • Building permit25 102506Closed

    1 Roof Sign

    Feb 6, 2025 · 260 YONGE ST
  • Zoning review24 246543 LTOClosed
    Dec 4, 2024 · 260 YONGE ST
  • Building permit24 246891Cancelled

    Addition of fire hose cabinet (Previous permit #24 101073 BA)

    Dec 4, 2024 · 260 YONGE ST
  • Building permit24 203762Closed

    Plumbing - Interior alterations for structural work for plumbing rough-in only for new tenant

    Sep 20, 2024 · 260 YONGE ST
  • Building permit24 101073Closed

    Proposal for interior alterations for a new retail tenant - 'Winners' at Level 1 (Unit 2 / previously Unit N114B) in the Eaton Centre. [290 Yonge St / 1 / 33 Dundas St W]

    Mar 8, 2024 · 260 YONGE ST
  • Zoning review24 121430 LTOClosed
    Mar 4, 2024 · 33 DUNDAS ST W
  • Building permit23 163805Revision Issued

    REVISION 01: escalator PitAdding new escalator Pit

    Sep 13, 2023 · 260 YONGE ST
  • Zoning review23 179630 ZMPClosed
    Jul 25, 2023 · 260 YONGE ST
  • Building permit23 125387Inspection

    i)Alteration to existing base building fire protection sprinkler and standpipe system to accommadate new tenant space. ii)Re-instate sprinkler and standpipe to suite new layout on 6th and 7th floor at 33 Dundas for BMO tenant space

    Jun 28, 2023 · 33 DUNDAS ST W
  • Zoning review23 152391 ZPRClosed
    May 29, 2023 · 260 YONGE ST
  • Building permit22 216153Closed

    Plumbing - Proposed tenant fitout for Floors 6 and 7 at 33 Dundus Street West for BMO Offices, classrooms and Presentation Hall. Mechanical and Electrical work to suit.

    Feb 9, 2023 · 33 DUNDAS ST W
  • Building permit22 231457Closed

    To erect and display one illuminated wall sign**BMO**See ZSV (22-176477)

    Dec 5, 2022 · 260 YONGE ST
  • Building permit22 127084Revision Issued

    REV 01: reduced size of the opening in the floor slab on the 7th floor & revision to structural drawingsProposal for interior alterations for tenant improvement renovations on existing vacant Level 8 [6th Floor] & Level 9 [7th Floor] for an existing office tenant - 'BMO'. Scope: create an opening in the 7th floor slab for future Auditorium, add walkways / bridges on the 6th & 7th floors, add guard rails around the South Atrium on the 6th & 7th floors. (This proposal is tied to 21 106235 BLD 00 BA & BLD 01 BA.)

    Sep 1, 2022 · 260 YONGE ST
  • Zoning review22 188475 LTOClosed
    Aug 10, 2022 · 260 YONGE ST
  • Zoning review22 176477 ZSVClosed
    Jul 14, 2022 · 260 YONGE ST
  • Building permit22 148544Closed

    To erect and display one illuminated ground sign, displaying static copy located along the north frontage, perpendicular to Dundas St W. The sign contains two sign faces, each measuring 2.46 metres by 1.07 metres at a height of 2.74 metres.***BMO***

    Jun 17, 2022 · 260 YONGE ST
  • Zoning review22 151235 ZPRClosed
    May 25, 2022 · 260 YONGE ST
  • Zoning review20 196107 LTOClosed
    Sep 21, 2020 · 260 YONGE ST
  • Building permit19 203284Closed

    Proposal for the addition of wall mounted a/c units and a new exhaust fan

    Aug 19, 2019 · 260 YONGE ST
  • Building permit18 249641Closed

    Construct interior alterations to floors 25 & 26 for LINKEDIN (206m2)

    Nov 13, 2018 · 260 YONGE ST
  • Building permit18 134432Inspection

    Proposed removal of two existing VAV's and replacement with two new fan powered VAV boxes in an existing retail space (Nordstrom).

    Apr 20, 2018 · 260 YONGE ST
  • Building permit15 130360Closed

    Interior alterations to Claire's Ratail Store. Unit N-105

    Apr 8, 2015 · 260 YONGE ST
  • Zoning review14 220003 ZSVClosed
    Sep 10, 2014 · 290 YONGE ST
  • Building permit14 201627Closed

    To erect and display one illuminated wall sign, with static copy, located on the west facing first storey building wall, in conjunction with a commercial unit located on the premises. Applicant requested the second wall sign facing Dundas St W to be deleted from this file as it is not in compliance with Chapter 694, will apply for sign variance. **Sears**

    Aug 13, 2014 · 260 YONGE ST
  • Building permit14 145561Permit Issued

    To construct a rooftop patio accessory to the "Sears" office on the 7th FL

    May 7, 2014 · 290 YONGE ST
  • Zoning review12 281107 LTOClosed
    Nov 19, 2012 · 290 YONGE ST
  • Building permit08 122144Closed

    Demolish office partitions on multiple floors. Tenant: Sears.

    Apr 9, 2008 · 290 YONGE ST
  • Zoning review01 013340 LTOClosed
    Oct 16, 2001 · 290 YONGE ST
  • Zoning review01 013012 LTOClosed
    Jul 23, 2001 · 290 YONGE ST
  • Zoning review01 012044 LTOClosed
    Jan 8, 2001 · 290 YONGE ST
  • Zoning review00 013179 LTOClosed
    Dec 1, 2000 · 260 YONGE ST
  • Zoning review00 013079 LTOClosed
    Oct 26, 2000 · 290 YONGE ST
  • Zoning review00 013078 LTOClosed
    Oct 26, 2000 · 290 YONGE ST
  • Zoning review00 012978 LTOClosed
    Sep 13, 2000 · 290 YONGE ST
  • Zoning review00 012979 LTOClosed
    Sep 13, 2000 · 290 YONGE ST
  • Zoning review00 012528 LTOClosed
    May 9, 2000 · 260 YONGE ST
  • Building permit97 016221Closed

    SUPPLY & INSTALL HVAC TO DESIGNATED SMOKING AREA OF EXISTING RESTAURANT. DSA SEATING: 144 TOTAL: 1187 REFER TO #397044 FOR COST AND PLANS

    Apr 27, 1998 · 290 YONGE ST
  • Building permit97 015240Closed

    MAKE INTERIOR ALTERATIONS TO DESIGNATED SMOKING AREA OF EXISTING RESTAURANT. INCL NECESSARY VENTILATION SYST. MODN DSA SEATING 144 TOTAL SEATING 1187. JB

    Apr 27, 1998 · 290 YONGE ST
  • Zoning review98 025615 LTOClosed
    Feb 3, 1998 · 260 YONGE ST
  • Building permit98 012128Closed

    INSTALL MAGLOCKS ON 3 BELOW, 1ST FLOOR, 3RD FLOOR AND 7TH . BP

    Jan 7, 1998 · 290 YONGE ST
  • Zoning review97 027074 LTOClosed
    Nov 24, 1997 · 290 YONGE ST
  • Zoning review96 024788 LTOClosed
    Apr 3, 1996 · 260 YONGE ST
  • Zoning review95 025270 LTOClosed
    Jun 9, 1995 · 260 YONGE ST
  • Zoning review93 025877 LTOClosed
    Dec 13, 1993 · 290 YONGE ST
  • Zoning review93 025879 LTOClosed
    Dec 13, 1993 · 290 YONGE ST
  • Zoning review93 025878 LTOClosed
    Dec 13, 1993 · 290 YONGE ST
  • Zoning review93 025876 LTOClosed
    Dec 13, 1993 · 290 YONGE ST
  • Zoning review92 026151 LTOClosed
    Nov 2, 1992 · 260 YONGE ST
  • Zoning review91 027107 LTOClosed
    Nov 25, 1991 · 260 YONGE ST
  • Zoning review91 026395 LTOClosed
    Apr 29, 1991 · 260 YONGE ST
  • Zoning review90 028821 LTOClosed
    Sep 18, 1990 · 290 YONGE ST
  • Zoning review90 028809 LTOClosed
    Sep 12, 1990 · 260 YONGE ST
  • Zoning review90 028771 LTOClosed
    Aug 29, 1990 · 260 YONGE ST
  • Zoning review90 028633 LTOClosed
    Jul 6, 1990 · 260 YONGE ST
  • Zoning review90 028429 LTOClosed
    May 7, 1990 · 260 YONGE ST
  • Zoning review89 030539 LTOClosed
    Dec 7, 1989 · 260 YONGE ST
  • Zoning review89 030446 LTOClosed
    Oct 19, 1989 · 260 YONGE ST
  • Zoning review89 030445 LTOClosed
    Oct 19, 1989 · 260 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
12,612 m²
Frontage
106.6 mestimated, irregular lot
Depth
178.8 mestimated, irregular lot
Street
Dundas Sq
Corner lot
Yes, also on Yonge St178.8 m along it
Public lane
None
House footprint
12,049 m²
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
11house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%9 of 9 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    22

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

      332 YONGE ST · Oct 14, 2026 · 265 m away
    • Minor varianceApproved

      To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

      30 BOND ST · Jan 21, 2026 · 305 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

      130 ELIZABETH ST · Jan 14, 2026 · 401 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

      53 A MUTUAL ST · Oct 1, 2025 · 490 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

      241 CHURCH ST · Jul 30, 2025 · 377 m away

    Latest activity nearby

    • Zoning review

      Closed

      335 YONGE ST · Nov 23, 2026 · 256 m away
    • Building permit

      Proposed an interior alteration

      595 BAY ST · Nov 19, 2026 · 230 m away
    • Building permit

      INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO

      121 DUNDAS ST W · Nov 17, 2026 · 284 m away
    • Zoning review

      Closed

      220 YONGE ST · Nov 10, 2026 · 166 m away
    • Building permit

      Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401

      595 BAY ST · Nov 9, 2026 · 230 m away
    • Zoning review

      Not Started

      21 DUNDAS SQ · Nov 6, 2026 · 130 m away
    • Building permit

      Proposal to install and update the existing sprinkler system in the washrooms on the 22nd and 26th floors.

      20 QUEEN ST W · Nov 6, 2026 · 297 m away
    • Building permit

      Proposed interior alterations to existing tenant retail space.

      220 YONGE ST · Nov 6, 2026 · 166 m away
    • Building permit

      Proposal for interior alterations to an existing retail store to accommodate a new tenant.

      220 YONGE ST · Nov 6, 2026 · 166 m away
    • Building permit

      Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.

      260 YONGE ST · Nov 6, 2026 · 60 m away

    Neighbourhood: Yonge-Bay Corridor

    About the area around the lot, not the lot itself.

    Nearest station
    TMU Station3 min walk
    Nearest TTC stop
    Opposite 247 Yonge St - Toronto Eaton Centre1 min walk
    Nearest cycling route
    Shuter StBike Lane, 2 min walk
    Nearest traffic count
    7,255 vehicles in 14 hYonge St: Shuter St - Dundas Sq, 50 m away, Apr 12, 2025
    Serious collisions within 500 m
    142021–2026, killed or seriously injured: 2 fatal, 8 with pedestrians, 2 with cyclists
    Parks
    Trinity Square1 min walk
    Larry Sefton Park3 min walk
    Toronto Metropolitan University Square4 min walk

    Schools within 1 km

    • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 2 min walk
    • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 4 min walk
    • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 4 min walk
    • TMU - HEASLIP HOUSE University 4 min walk
    • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
    • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYonge-Bay CorridorMedian neighbourhood
    Median household income (2020)$68,500$84,500
    Households that own their home32%54%
    Population (2021)12,64516,813
    Homes built in 1960 or before2%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYonge-Bay CorridorCity median
    Assault3361.1636.3
    Robbery300.169.5
    Homicide125.3
    Shootings1210.5
    Auto theft162.1192.6
    Theft over $5,000210.146.1
    Break and enter552.2172.8
    Theft from vehicles402.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.