HousePrecheckCheck an address

260 Eighth StToronto · zoning, lot size and permit records

236.2 × 355.0 m81,565 m²on New Toronto Stcorner, also on Eighth St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 24 173799 WET 03 SA (The project proposal seeks to construct 2 one-storey industrial warehouse and distribut..., 2024). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 26 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
N50 m
236.2 m frontage355.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 211169 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 173799 WET 03 SA (The project proposal seeks to construct 2 one-storey industrial warehouse and distribut..., 2024).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 Committee of Adjustment files on this lot

    Good to know

    4 approved. A0403/24EYK (To construct two new warehouse buildings, 2026); B33/16EYK (To obtain consent to sever the lot into two lots, 2016); B51/13EYK (To obtain consent to sever the property into two industrial lots, 2013); and 2 more.

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 204752 ZZUClosed
    Jul 20, 2026 · 260 EIGHTH ST
  • Minor varianceA0403/24EYKApproved

    To construct two new warehouse buildings.

    Jun 25, 2026 · 260 EIGHTH ST
  • By-law investigation25 214138 LGW 00 IVClosed

    Notice Issued Long Grass

    Aug 21, 2025 · 260 EIGHTH ST
  • By-law investigation25 214128 LGW 00 IRClosed

    Long Grass and Weeds

    Aug 21, 2025 · 260 EIGHTH ST
  • By-law investigation25 211169 PRS 00 IRClosed

    Property Standards

    Aug 15, 2025 · 260 EIGHTH ST
  • Zoning review24 173799 PSPClosed
    Feb 21, 2025 · 260 EIGHTH ST
  • Development application24 173799 WET 03 SAUnder Review

    The project proposal seeks to construct 2 one-storey industrial warehouse and distribution buildings with accessory office. The existing unoccupied three-storey building (Heritage) is proposed to remain and be incorporated into the development.

    Jul 3, 2024 · 124 BIRMINGHAM ST · City file
  • Zoning review24 161256 ZAPNotice Sent
    Jun 7, 2024 · 260 EIGHTH ST
Show 15 older records
  • Zoning review21 150880 ZZUClosed
    May 6, 2021 · 260 EIGHTH ST
  • Consent (lot split)B33/16EYKApproved

    To obtain consent to sever the lot into two lots.

    Jul 7, 2016 · 260 EIGHTH ST
  • Zoning review16 117388 ZPRClosed
    Feb 17, 2016 · 260 EIGHTH ST
  • Zoning review14 119630 PSPClosed
    Feb 20, 2014 · 260 EIGHTH ST
  • Development application14 118282 WET 06 SAClosed

    Proposed development of a 1-storey, 21 753 m2 building to be used as a Data Processing Facility (Data Centre). Application represents Phase 1 of a two phase development and excludes the designated heritage building at 124 Birmingham.

    Feb 18, 2014 · 260 EIGHTH ST
  • Consent (lot split)B51/13EYKApproved

    To obtain consent to sever the property into two industrial lots.

    Sep 12, 2013 · 260 EIGHTH ST
  • Zoning review13 150404 ZPRClosed
    Apr 15, 2013 · 260 EIGHTH ST
  • Zoning review10 163153 PSPClosed
    Apr 26, 2010 · 260 EIGHTH ST
  • Zoning review10 133210 ZPRClosed
    Mar 16, 2010 · 260 EIGHTH ST
  • Consent (lot split)B29/08EYKPending
    Apr 11, 2008 · 260 EIGHTH ST
  • Zoning review07 246265 ZPRClosed
    Jul 23, 2007 · 260 EIGHTH ST
  • Consent (lot split)B107/05EYKApproved

    To obtain consent to sever the land into 2 industrial lots.

    Dec 15, 2005 · 260 EIGHTH ST
  • Zoning review04 193896 ZPRClosed
    Nov 19, 2004 · 260 EIGHTH ST
  • Building permit01 164886Closed

    Replace Sani - Sewer to office.

    Aug 13, 2001 · 260 EIGHTH ST
  • Building permit00 356619Closed

    Storm and sani to vacant land of industrial building.

    Feb 8, 2001 · 260 EIGHTH ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
81,565 m²
Frontage
236.2 m
Depth
355 m
Street
New Toronto St
Corner lot
Yes, also on Eighth St355 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 55 City trees in front of this lot. The City's street tree inventory lists 55 trees at this address: maple, norway superform (55 cm), maple, norway (50 cm), maple, norway (50 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
5

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct two new warehouse buildings.

    260 EIGHTH ST · Jun 25, 2026 · 95 m away
  • Minor varianceApproved

    To construct a new laneway house in the rear yard.

    150 SIXTH ST · Nov 7, 2024 · 456 m away
  • Minor varianceApproved

    To construct a third storey rear addition.

    273 SIXTH ST · Jul 18, 2024 · 352 m away
  • Minor varianceApproved

    To construct a new two-storey rear yard addition and a new second storey rear addition above the existing dwelling.

    277 SIXTH ST · Jun 6, 2024 · 352 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    168 FIFTH ST · Mar 28, 2024 · 490 m away

Latest activity nearby

  • Building permit

    Interior alteration to existing suite. Addition of Washroom

    50 ETTA WYLIE RD · Oct 5, 2026 · 223 m away
  • Zoning review

    Closed

    260 EIGHTH ST · Jul 20, 2026 · 95 m away
  • Minor varianceApproved

    To construct two new warehouse buildings.

    260 EIGHTH ST · Jun 25, 2026 · 95 m away
  • Building permit

    This project consists of installation of a back flow preventer device on sprinkler system in an existing distribution facility. OBC class F.

    205 NEW TORONTO ST · May 21, 2026 · 245 m away
  • Building permit

    Proposal for domestic hot water recirculation pipe replacement.

    10 GARNETT JANES RD · Feb 12, 2026 · 277 m away
  • Zoning review

    Closed

    50 ETTA WYLIE RD · Jan 29, 2026 · 223 m away
  • Zoning review

    Closed

    260 EIGHTH ST · Nov 19, 2025 · 95 m away
  • Building permit

    1 WALL SIGN**Canadian Helen Keller Centre**

    150 EIGHTH ST · Nov 12, 2025 · 280 m away
  • Building permit

    2 WALL SIGNS and 1 WINDOW SIGN**Canadian Helen Keller Centre**

    150 EIGHTH ST · Oct 30, 2025 · 280 m away
  • Zoning review

    Closed

    50 ETTA WYLIE RD · Sep 17, 2025 · 223 m away

Neighbourhood: New Toronto

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station27 min walk
Nearest TTC stop
Birmingham St at Eighth St4 min walk
Nearest cycling route
Birmingham StCycle Track, 3 min walk
Nearest traffic count
8,406 vehicles in 8 hIslington Ave / Birmingham St, 290 m away, Mar 24, 2021
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Jordon Carter Memorial Park3 min walk
Birmingham Street Parkette4 min walk
Sixth Street Park5 min walk

Schools within 1 km

  • CHILDREN'S URBAN ENRICHMENT STUDIO Private 7 min walk
  • ST JOSAPHAT CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • SEVENTH STREET JR SCHOOL English Public 10 min walk
  • SECOND STREET JR MDL SCHOOL English Public 13 min walk
  • LAKESHORE COLLEGIATE INSTITUTE English Public 13 min walk
  • THE HOLY TRINITY SCHOOL English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNew TorontoMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home44%54%
Population (2021)11,34516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNew TorontoCity median
Assault903.2636.3
Robbery76.569.5
Shootings15.310.5
Auto theft145.4192.6
Theft over $5,00091.946.1
Break and enter183.7172.8
Theft from vehicles244.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.