Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
19 development applications open within 300 m
Good to know19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 94 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
No permits, applications or Committee of Adjustment files on this lot in the City's open records.
Check before you build
Site-specific exception 900.11.10(2377)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
1 part for other addresses
- B On 35 Charles St. W., former City of Toronto by-laws 57-67 and 296-70.
Lot facts
- Area
- 2,798 m²
- Frontage
- 32.2 m
- Depth
- 87.5 m
- Street
- St Nicholas St
- Corner lot
- Yes, also on St Mary St87.5 m along it
- Public lane
- La Scala Lane, 39.4 m along it
- House footprint
- 807 m²
- Back yard
- 7 mhouse to rear lot line
- Side yards
- 0 m and 9.5 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 8house, garage, sheds
- Max height
- 46 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 6.0 (c1.0; r6.0) SS1 (x2377) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 96%24 of 25 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 35
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 25 variance decisions: more than at 57% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.
1235 BAY ST · Oct 14, 2026 · 375 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.
27-29 YORKVILLE AVE · Jul 15, 2026 · 395 m away - Minor varianceApproved
To alter the existing 52-storey mixed-use building (approved under Site Specific Zoning By-law 331-2006) by converting the southeast and southwest terraces on the penthouse level (Penthouse Unit 1) into habitable space (terrace enclosures).
50 YORKVILLE AVE · Mar 26, 2025 · 450 m away - Minor varianceApproved
To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.
593 YONGE ST · Nov 27, 2024 · 289 m away - Minor varianceApproved
To convert the existing two-and-one-half-storey townhouse into a mixed-use building.
11 GLOUCESTER ST · Nov 27, 2024 · 284 m away
Latest activity nearby
- Building permit
Proposal to convert existing rental unit to a restaurant - add washrooms and a kitchen, add a mezzanine for mechanical unit and equipment; add interior walls, ceilings and related mechanical items.
2 DUNDONALD ST · Nov 25, 2026 · 299 m away - Zoning review
Application On Hold
649 YONGE ST · Nov 23, 2026 · 159 m away - Building permit
Proposal for new Sprinklers System on the 3rd floor public corridor.
60 BLOOR ST W · Nov 19, 2026 · 271 m away - Building permit
One wall sign.***SIGNATURE HAIR STUDIO***
665 YONGE ST · Nov 18, 2026 · 144 m away - Building permit
Proposed Hydro Vault Repairs
1001 BAY ST · Nov 13, 2026 · 273 m away - Building permit
1 Wall Sign*****RUDSAK******
55 BLOOR ST W · Nov 10, 2026 · 217 m away - Building permit
Proposal to convert the second floor of Da.Si.Mar Shawarma into a coffee shop with a maximum seating capacity of 30 people
673 YONGE ST · Nov 5, 2026 · 147 m away - Building permit
Proposal for interior alterations to accommodate new office
22 ST JOSEPH ST · Nov 4, 2026 · 216 m away - Building permit
REV: Proposed revision for ventilation adjustments based on as-built conditionProposal to replace heating plant, domestic hot water heating, potable water distribution, ventilation and air conditioning systems.
2 GLOUCESTER ST · Nov 3, 2026 · 236 m away - Building permit
Renovation to the first floor of existing retail space (Holt Renfrew) to base building condition for fitout by future tenant. Scope of work includes demolition and construction of non-loading bearing partitions as well as related mechanical and electrical work. Future tenant interior alterations by separate permit.
50 BLOOR ST W · Nov 2, 2026 · 284 m away
Neighbourhood: Bay-Cloverhill
About the area around the lot, not the lot itself.
- Nearest station
- Bloor Station5 min walk
- Nearest TTC stop
- Bay St at Charles St West2 min walk
- Nearest cycling route
- Bay StSharrows - Arterial - Connector, 2 min walk
- Nearest traffic count
- 1,550 vehicles in 8 hSt Nicholas St / St Mary St, 60 m away, Oct 11, 2000
- Serious collisions within 500 m
- 132021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 5 with cyclists
- Parks
- St. Mary Street Parkette1 min walk
- Clover Hill Park3 min walk
- George Hislop Park3 min walk
Schools within 1 km
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 6 min walk
- ST JOSEPH'S COLLEGE SCHOOL English Separate 7 min walk
- ROSEDALE DAY SCHOOL Private 7 min walk
- TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 7 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 8 min walk
- THE YMCA ACADEMY SECONDARY SCHOOL Private 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bay-Cloverhill | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $58,400 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 16,670 | 16,813 |
| Homes built in 1960 or before | 4% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bay-Cloverhill | City median |
|---|---|---|
| Assault | 601.9 | 636.3 |
| Robbery | 74.7 | 69.5 |
| Auto theft | 16.6 | 192.6 |
| Theft over $5,000 | 87.2 | 46.1 |
| Break and enter | 286.4 | 172.8 |
| Theft from vehicles | 145.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.