HousePrecheckCheck an address

26 Maitland StToronto · zoning, lot size and permit records

Also 22A Maitland St, 22B Maitland St, 22C Maitland St, 22D Maitland St, 22E Maitland St and 3 more

Commercial residential · CR 2.0 (c0.0; r2.0) SS1 (x773)44.3 × 52.5 m2,303 m²on Maitland St

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 23 130802 STE 13 SA (Site Plan application to permit a 56-storey residential building, containing 532 dwelli..., 2023); 21 233900 STE 13 CD (*** Draft Plan of Condominium to create 502 residential units and 1 commercial unit, 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 23 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.
N20 m
44.3 m frontage52.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 130802 STE 13 SA (Site Plan application to permit a 56-storey residential building, containing 532 dwelli..., 2023); 21 233900 STE 13 CD (*** Draft Plan of Condominium to create 502 residential units and 1 commercial unit, 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0153/25TEY (To alter the development standards for the 40-storey mixed-use building (as approved un..., 2025).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 23 development applications open within 300 m

    Good to know

    23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Minor varianceA0153/25TEYApproved

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

    Apr 23, 2025 · 26 MAITLAND ST
  • Development application23 130802 STE 13 SANOAC Issued

    Site Plan application to permit a 56-storey residential building, containing 532 dwelling units, including 55 rental replacement units.

    Apr 4, 2023 · 34-42 MAITLAND ST · City file
  • Development application22 243087 STE 13 OZClosed

    This application proposes to amend the Official Plan and Zoning By-law to permit a 56-storey residential building, containing 532 dwelling units, including 55 rental replacement units.

    Dec 29, 2022 · 34-42 MAITLAND ST · City file
  • Development application21 233900 STE 13 CDDraft Plan Approved

    *** Draft Plan of Condominium to create 502 residential units and 1 commercial unit.

    Nov 3, 2021 · 26 MAITLAND ST · City file
  • Development application19 240163 STE 13 SAClosed

    Site Plan Approval application to facilitate the development of the site for a 40 storey plus partial 41st storey (129.2 m, mechanical penthouse inclusive) mixed-use building containing 220 square metres of non-residential floor area and 502 residential dwelling units. Related planning applications include rezoning 19 240160 STE 13 OZ.

    Oct 23, 2019 · 26 MAITLAND ST · City file
  • Development application19 240160 STE 13 OZClosed

    LPAT approved Official Plan/Zoning By-law Amendment application to facilitate the development of the site for a 40 storey plus partial 41st storey (129.2 m, mechanical penthouse inclusive) mixed-use building containing 220 square metres of non-residential floor area and 502 residential dwelling units.

    Oct 23, 2019 · 26 MAITLAND ST · City file
  • Building permit17 278922Closeddemolition

    Proposal to demolish existing office and backfill to grade.

    Jul 26, 2018 · 26 MAITLAND ST
  • Building permit16 203113Closed

    Proposal to install 1 backflow prevention device.

    Aug 24, 2016 · 26 MAITLAND ST
Show 2 older records
  • Building permit03 141144Closed

    make interior alters to 1st, 2nd and 3rd floors of existing office .

    Jul 2, 2003 · 26 MAITLAND ST
  • Zoning review81 029820 LTOClosed
    Jan 15, 1981 · 26 MAITLAND ST

Check before you build

  • Site-specific exception 900.11.10(773)

    Needs a closer look

    27 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(773)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 20 and 26 Maitland Street, if the requirements of By-law 88-2023(OLT), are complied with, a building or structure may be constructed, used or enlarged in compliance with Regulations

  2. Rule B

    to (AA) below; (B) Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum of 106.21 metres and elevation of the highest point of the building or structure

  3. Rule C

    Despite Regulations 40.10.20.10(1)(A) and 40.10.20.20(1)(A) the only non-residential uses permitted are as follows: (i) Art gallery ; (ii) Artist studio ; (iii) Automated banking machine ; (iv) Education use ; (v) Financial institution ; (vi) Massage therapy ; (vii) Medical office; (viii) Office; (ix) Personal service shop ; (x) Day nursery ; (xi) Eating establishment ; (xii) Retail service ; (xiii) Retail store; and (xiv) Take-out eating establishment

  4. Rule D

    A maximum of 532 dwelling units are permitted on the lot , of which: (i) a minimum of 15 percent of the total number of dwelling units must have two or more bedrooms; (ii) a minimum of 10 percent of the total number of dwelling units must have three or more bedrooms; (iii) an additional minimum 15 percent of the total number of dwelling units must be a combination of dwelling units that have two or more bedrooms or that may be converted into two or three bedroom dwelling units through the use of accessible or adaptable design measures such as knock out panels; and (iv) any dwelling units with three or more bedrooms provided to satisfy (ii) above are not included in the provision required by (i) above

  5. Rule E

    Despite Regulation 40.10.40.40(1), the permitted maximum gross floor area is 33,800 square metres, of which: (i) the permitted maximum gross floor area for residential uses is 33,500 square metres; (ii) the permitted maximum gross floor area for non-residential uses is 300 square metres; (iii) the required minimum gross floor area for non-residential uses is 200 square metres; (iv) no gross floor area for residential uses may be located above the 40th storey , with the exception of amenity space

  6. Rule F

    Despite Regulation 40.10.40.1(1), five (5) dwelling units , residential amenity space , and residential lobby access may be located on the first storey of a building , adjacent to non-residential uses

  7. Rule G

    Despite Regulation 40.10.40.10(5), the required minimum height of the first storey , as measured between the floor of the first storey and the ceiling of the first storey, is 2.7 metres

  8. Rule H

    Despite Regulation 40.10.40.10(1), the permitted maximum height of a building or structure is the number following the HT symbol in metres as shown on Diagram 3 of By-law 88-2023(OLT)

  9. Rule I

    Despite Regulations 40.5.40.10(3) to (8) and (H) above, the following equipment and structures may project beyond the permitted maximum height of a building : (i) Parapets, guardrails, balustrades, safety railings, bollards, vents, stacks, fences, privacy screens, landscape elements (including green roofs ), terraces, thermal insulation and roof ballast, flues, access roof hatch, outdoor furniture, structures on the roof used for outside or open-air recreation including an outdoor pool, retaining walls, to a maximum of 1.8 metres; (ii) Mechanical equipment, elevator overruns, canopies, heating, cooling or ventilating equipment or a fence, wall or structure enclosing such elements; washing equipment, to a maximum of 3.6 metres; and (iii) Wind screen, architectural decorative elements, to a maximum of 6.0 metres

  10. Rule J

    Despite Regulation 40.10.40.50(1), a building with 20 or more dwelling units must provide amenity space in accordance with the following: (i) a minimum of 4.0 square metres of amenity space for each dwelling unit , of which: (a) a minimum of 1,000 square metres of the requirement in (i) above must be outdoor amenity space which must be located adjoining or directly accessible to indoor amenity space ; and (b) no more than 25 percent of the outdoor component may be a green roof

  11. Rule K

    Regulation 40.10.40.50(2), with respect to amenity space for buildings with non residential uses in SS1 Areas, does not apply

  12. Rule L

    Despite Regulation 40.10.40.70(1), the required minimum building setbacks are as shown in metres on Diagram 3 of By-law 88-2023(OLT)

  13. Rule M

    Despite Regulation 40.10.40.80(1), the required separation of main walls are as shown in metres on Diagram 3 of By-law 88-2023(OLT)

  14. Rule N

    Despite Clause 40.10.40.60 and (L) and (M) above, the following elements may encroach into the required minimum building setbacks and main wall separation distances as follows: (i) Architectural fins, lighting fixtures, windows sills, balustrades, vents, decorative architectural features, to a maximum extent of 0.5 metres; (ii) Balconies, roof overhangs, heating, cooling or ventilating equipment, window washing equipment, to a maximum extent of 1.8 metres; and (iii) Canopies, to a maximum extent of 2.5 metres

  15. Rule O

    Regulation 40.10.50.10(3) with respect to a 1.5 metre strip of soft landscaping along any part of a lot line abutting another lot in the Residential Zone category or Residential Apartment Zone category, does not apply

  16. Rule P

    Despite Regulation 40.10.90.40(1) vehicle access to a loading space may be from a street

  17. Rule Q

    Despite Regulation 40.10.100.10(1)(A) vehicle access to the lot may be from a street

  18. Rule R

    Despite Regulation 200.5.10.1(1) and Table 200.5.10.1, parking spaces must be provided and maintained on the lot in accordance with the following minimum requirements: (i) 0.15 parking spaces for each dwelling unit for residents; (ii) 0.035 parking spaces for each dwelling unit for residential visitors; (iii) A minimum of 2 parking spaces shall be provided for non-residential uses; and (iv) a maximum of two (2) "car-share parking spaces" may be provided

  19. Rule S

    Despite Regulation 200.5.10.1(1), "car-share parking spaces" may replace parking spaces otherwise required for residential occupants, subject to the following: (i) a reduction of four resident occupant parking spaces will be permitted for each "car-share parking space" provided and that the maximum reduction permitted be capped by the application of the following formula: (a) 4 multiplied by (total number of dwelling units divided by 60), rounded down to the nearest whole number; (ii) for the purpose of this exception, "car-share" means the practice whereby a number of people share the use of one or more motor vehicles and such "car-share" motor vehicles are made available to at least the occupants of the building for short-term rental, including hourly rental; and (iii) for the purpose of this exception, "car-share parking space" means a parking space exclusively reserved and signed for a vehicle used only for "car-share" purposes

  20. Rule T

    A maximum of 10 percent of the required parking spaces may be small car parking spaces with the following dimensions: (i) A minimum length of 5.3 metres; (ii) A minimum width of 2.4 metres; and (iii) A minimum vertical clearance of 1.8 metres

  21. Rule U

    Despite Regulation 200.15.1(1) and 200.15.15.4(1), an accessible parking space must have the following minimum dimensions: (i) Length of 5.6 metres; (ii) Width of 3.4 metres; (iii) Vertical clearance of 2.0 metres; and (iv) The entire length of an accessible parking space must be adjacent to a 1.5 metre wide accessible barrier free aisle or path

  22. Rule V

    Despite Regulation 200.15.1(4) , accessible parking spaces may be located within the below-ground parking garage provided they are located a maximum of 20 metres from an entrance to an elevator lobby with one or more passenger elevator(s) that provide access to the first storey of the building

  23. Rule W

    Despite Regulation 220.5.10.1(2), one Type "G" loading space and one Type "C" loading space are required

  24. Rule X

    Despite Regulation 230.5.1.10(6), "long-term" bicycle parking spaces for non residential uses may be located outside

  25. Rule Y

    Regulation 230.10.1.20(2), with respect to the location of "short-term" bicycle parking spaces , does not apply

  26. Rule Z

    Despite Regulation 230.5.1.10(10), "long-term" and "short-term" bicycle parking spaces may be located in a stacked bicycle parking space

  27. Rule AA

    Despite Regulation 230.5.1.10(4)(A)(i) and (ii), a stacked bicycle parking space may have the following dimensions: (i) A minimum length of 1.5 metres; and (ii) A minimum width of 0.4 metres.

By-law 569-2013, Chapter 900

Lot facts

Area
2,303 m²
Frontage
44.3 m
Depth
52.5 m
Street
Maitland St
Corner lot
No
Public lane
None
House footprint
896 m²roof up to 17.5 m
Back yard
14.9 mhouse to rear lot line
Side yards
3.2 m and 11.6 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
30 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 2.0 (c0.0; r2.0) SS1 (x773) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%31 of 31 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
46

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 31 variance decisions: more than at 64% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 176 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

    20 MAITLAND ST · Apr 1, 2026 · 25 m away
  • Minor varianceApproved

    To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

    27 GROSVENOR ST · Jul 30, 2025 · 297 m away
  • Minor varianceApproved

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

    26 MAITLAND ST · Apr 23, 2025 · 6 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

    510 YONGE ST · Mar 19, 2025 · 161 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards for the previously approved two-tower mixed-use development (approved under Site Specific Zoning By-law 1096-2021), by reducing the height of a portion of the first storey (to include a mezzanine level located between the first and second storeys). There will be a total of 767 rental dwelling units (of which 30.4% (233 units) will be affordable rental units), as well as a childcare center on this lot. A related Site Plan Control application (under File Number 19 127591 STE 13 SA) has received Notice of Approval conditions.

    27 GROSVENOR ST · Nov 25, 2026 · 297 m away
  • Building permit

    Proposal for interior alterations to lobby, main corridor, bar & restaurant at ground floor.

    475 YONGE ST · Nov 17, 2026 · 209 m away
  • Building permit

    INTERIOR ALTERATIONS TO GROUND FLOOR VACANT COMMERCIAL UNIT 3 FOR PROPOSED COFFEE SHOP: 'DARKHORSE ESPRESSO'

    484 YONGE ST · Nov 16, 2026 · 223 m away
  • Building permit

    Proposed interior alterations for dental office

    16 WELLESLEY ST W · Nov 10, 2026 · 224 m away
  • Building permit

    Interior alteration to combine an existing gym room and adjacent pool room into one fitness room.

    475 YONGE ST · Nov 10, 2026 · 209 m away
  • Building permit

    Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor

    9 ST NICHOLAS ST · Nov 9, 2026 · 235 m away
  • Building permit

    1 projecting sign**SHIRIN JAAN**

    508 YONGE ST · Nov 5, 2026 · 163 m away
  • Building permit

    2 Wall Sign****AXIA STATION****

    608 YONGE ST · Nov 5, 2026 · 242 m away
  • Building permit

    1 Wall Sign

    522 YONGE ST · Nov 2, 2026 · 151 m away
  • Building permit

    1 Wall Sign*****XI NOODLE HOUSE*****

    510 YONGE ST · Nov 2, 2026 · 161 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station2 min walk
Nearest TTC stop
Wellesley Station - Southbound Platform1 min walk
Nearest cycling route
Wellesley St ECycle Track, 2 min walk
Nearest traffic count
12,053 vehicles in 14 hYonge St / Maitland St / Breadalbane St, 130 m away, Oct 16, 2024
Serious collisions within 500 m
132021–2026, killed or seriously injured: 2 fatal, 9 with pedestrians, 1 with cyclists
Parks
Alexander Street Parkette1 min walk
Paul Kane House Parkette2 min walk
Dr. Lillian McGregor Park3 min walk

Schools within 1 km

  • THE YMCA ACADEMY SECONDARY SCHOOL Private 3 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 4 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 5 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 5 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 6 min walk
  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.