HousePrecheckCheck an address

26 Gulliver RdToronto · zoning, lot size and permit records

Residential apartment · RA (f30.0; a1375; d1.5)33.5 × 108.8 m3,530 m²on Gulliver Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 53 rental units, built 1963More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 2 development applications open within 300 m, up to 6 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
33.5 m frontage108.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (30% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (25% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (30% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 173464 000 00 IR (Adequate Heat, 2026); 26 173463 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A317/15EYK (To convert the existing underground garage into 7 dwelling units, 2015).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 6 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (6 storeys, 53 units, built 1963).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 173464 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 26 GULLIVER RD
  • By-law investigation26 173463 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 26 GULLIVER RD
  • By-law investigation25 167272 WST 00 IRClosed

    Waste

    May 29, 2025 · 26 GULLIVER RD
  • Building permit22 107081Closed

    Interior alterations to convert a storage in the first floor into new apartment on an existing rental apartment building

    Oct 6, 2022 · 26 GULLIVER RD
  • Building permit21 134606Closed

    Interior alterations to convert storage room on the 6th floor into a residential apartment unit 600 (Only one dwelling unit added)

    May 5, 2021 · 26 GULLIVER RD
  • Building permit18 195151Closed

    Proposal to install backflow prevention device.

    Aug 14, 2018 · 26 GULLIVER RD
  • Minor varianceA317/15EYKApproved

    To convert the existing underground garage into 7 dwelling units.

    Jul 16, 2015 · 26 GULLIVER RD
  • Zoning review14 255491 ZZCIssuance Pending
    Nov 23, 2014 · 26 GULLIVER RD
Show 2 older records
  • Building permit13 103315Closed

    Balcony slab repair-apartment building.

    Feb 5, 2013 · 26 GULLIVER RD
  • Building permit95 251155Closed

    FIRE RETROFIT

    Jan 12, 1996 · 26 GULLIVER RD

Lot facts

Area
3,530 m²
Frontage
33.5 m
Depth
108.8 m
Street
Gulliver Rd
Corner lot
No
Public lane
None
House footprint
902 m²roof up to 27.7 m
Back yard
41 mhouse to rear lot line
Side yards
7.2 m and 8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 30 m. Frontage is about 33.5 m: meets the zone minimum. Source
  • Minimum lot area 1375 m². Lot area is 3,530 m²: meets the minimum. Source
  • Zone RA (f30.0; a1375; d1.5) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
1
Development applications
2

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the basement of the existing building into 9 additional dwelling units.

    2050 KEELE ST · May 9, 2024 · 201 m away
  • Minor varianceApproved

    To construct a new three-storey stacked townhouse building with nine residential units. A previous Committee of Adjustment application (A377/10EYK) approved variances relating to parking.

    2110 KEELE ST · Nov 24, 2022 · 104 m away
  • Minor varianceApproved

    To convert the existing underground garage into 7 dwelling units.

    26 GULLIVER RD · Jul 16, 2015 · 21 m away

Latest activity nearby

  • Building permit

    INSIDE BACK WATER VALVE

    8 GOTHAM CRT · Nov 4, 2026 · 227 m away
  • Development application

    Proposed 6-storey addition to the existing self-storage building and development of four drive-up mini self-storage buildings.

    7-11 INGRAM DR · Nov 3, 2026 · 205 m away
  • Building permit

    INSTALL BACK WATER VALVE

    37 COMAY RD · Aug 14, 2026 · 281 m away
  • Zoning review

    Closed

    2221 KEELE ST · Jul 7, 2026 · 191 m away
  • Minor varianceApproved

    To legalize and to maintain the location of the existing building and the restaurant and office space within the building. The existing building encroaches beyond the rear and south side lot lines.

    2255 KEELE ST · Mar 12, 2026 · 270 m away
  • Zoning review

    Closed

    22 INGRAM DR · Dec 5, 2025 · 288 m away
  • Zoning review

    Notice Sent

    22 INGRAM DR · Oct 24, 2025 · 288 m away
  • Zoning review

    Application On Hold

    15 GOTHAM CRT · Oct 21, 2025 · 211 m away
  • Building permit

    Proposed balcony and canopy repair

    45 GULLIVER RD · Oct 20, 2025 · 144 m away
  • Building permit

    Proposal to convert storage and laundry area to a new dwelling unit with a new below grade walkout stairs. UNIT C12

    33 FLAMBOROUGH DR · Aug 14, 2025 · 274 m away

Neighbourhood: Brookhaven-Amesbury

About the area around the lot, not the lot itself.

Nearest station
Keelesdale Station16 min walk
Nearest TTC stop
Gulliver Rd at Comay Rd2 min walk
Nearest traffic count
2,367 vehicles in 8 hGulliver Rd / Comay Rd, 130 m away, Apr 12, 2022
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Westview Greenbelt1 min walk
Gulliver Park2 min walk
King Georges - Keele Parkette7 min walk

Schools within 1 km

  • IMMACULATE CONCEPTION CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • GEORGE ANDERSON PUBLIC SCHOOL English Public 11 min walk
  • CHARLES E WEBSTER JR PUBLIC SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBrookhaven-AmesburyMedian neighbourhood
Median household income (2020)$73,000$84,500
Households that own their home41%54%
Population (2021)17,49516,813
Homes built in 1960 or before30%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBrookhaven-AmesburyCity median
Assault610.9636.3
Robbery62.769.5
Homicide5.25.3
Shootings10.410.5
Auto theft193.2192.6
Theft over $5,0004746.1
Break and enter167.1172.8
Theft from vehicles182.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.