Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 26 Cumberland St
26 Cumberland St is on a 8.7 m by 20.5 m lot on Cumberland St in Annex. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.
The City has 6 records on this lot since 1996. That is more than at 95% of Toronto houses. In 2017, a building permit was filed: "Proposed demolition of existing 2-storey multiple unit building, foundation removal and backfill to grade". Status: closed. In 2016, a development application was filed: "A site plan contorl application for two linked towers at 64 and 41 storeys with a 2 and 7 storey podium. a total of 1,228 parking spaces are provided (810…". Status: closed. In 2014, a development application was filed: "To obtain an official plan ammendment (see related rezoning file: 12 191650 ste 27 oz) to permit a mixed-use development with a podium building and a 40 and…". Status: closed. Nothing on file is open right now.
Within 300 m, 20 development applications are open (the tallest up to 94 storeys). Within 300 m, the Committee of Adjustment decided 27 minor variance applications in the last 10 years and approved 96%. Bay station is a 2-minute walk.
Summary
What the City's records show on this house
- Zoning not in By-law 569-2013Moderate
- 20 development applications open within 300 mLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2017-11-07 | Building permit17 244393 | Proposed demolition of existing 2-storey multiple unit building, foundation removal and backfill to grade. | Closed | |
| 2016-05-13 | Development application16 155457 STE 27 SA | A Site Plan Contorl application for two linked towers at 64 and 41 storeys with a 2 and 7 storey podium. A total of 1,228 parking spaces are provided (810 replacement Toronto Parking Authority spaces and 418 residential spaces). The residential parking are provided on levels 3-6 of the podium and the Parking Authority spaces are located in a below-grade garage accessed from Yorkville Avenue and Cumberland Street. | Closed | |
| 2014-06-13 | Development application14 173892 STE 27 OZ | To obtain an Official Plan Ammendment (See related rezoning file: 12 191650 STE 27 OZ) to permit a mixed-use development with a podium building and a 40 and 62-storey towers. A total of 1100 dwelling units are proposed, and the ground floor of the podium will be non-residential uses. A total of 1136 parking spaces will be provided below grade and above grade including an 800 Toronto Parking Authority facility. | Closed | |
| 2012-06-12 | Development application12 191650 STE 27 OZ | To construct a mixed-use development with a podium building and a 40 and 62-storey towers. A total of 1100 dwelling units are proposed, and the ground floor of the podium will be non-residential uses. A total of 1136 parking spaces will be provided below grade and above grade including an 800 Toronto Parking Authority facility. | Closed | |
| 2002-06-21 | Zoning review02 149426 LTO | No description on file | Closed | |
| 1996-03-12 | Building permit96 013787 | INSTALL FIXTURES GROUND FLOOR UNIT 26 2 SHAMPOO S., 1 STAINLESS STEEL S., 1 F.D. SS BUILDING PERMIT MAY BE REQUIRED FOR CHANGE OF USE | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- Ln W Yonge S Yorkville, 35.7 m along it
- House footprint
- 174 m²
- Back yard
- 0 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 20 development applications open within 300 m, up to 94 storeys
- 1 suite and multiplex permits within 300 m in 10 years
- 27 minor variance decisions within 300 m, 96% approved
What this part means for this house, in plain EnglishUnlock
20 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bay StationNearest station2 min walk
- Bay St at Cumberland St - Bay StationNearest TTC stop2 min walk
- Yonge StNearest cycling route2 min walk
- McDonald International Academy SchoolSchool6 min walk
- Jesse Ketchum Jr & Sr Public SchoolSchool6 min walk
- Humber College - International Graduate SchoolSchool6 min walk
- Rosedale Day SchoolSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist