HousePrecheckCheck an address

25R Queens Quay EToronto · zoning, lot size and permit records

≈ 245.0 × 87.6 m1,892 m²on Queens Quay E

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 7 development applications open within 300 m, up to 95 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N50 m
≈ 245.0 m frontage≈ 87.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (79% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 95 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Development application10 147083 STE 28 OZClosed

    OPA and Rezoning application for 3 new mixed use building containing retail at grade / residential above and resident and public parking. - 3 buildings - 2 buildings at 13 stories and 1 building at 35 stories. - 614 units - 773 parking spaces - 4 levels below grade parking -

    Apr 7, 2010 · 25 R QUEENS QUAY E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,892 m²
Frontage
245 mestimated, irregular lot
Depth
87.6 mestimated, irregular lot
Street
Queens Quay E
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%2 of 2 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    19

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.

      7 YONGE ST · Sep 3, 2025 · 358 m away
    • Minor varianceApproved

      To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.

      7 YONGE ST · Apr 23, 2025 · 358 m away
    • Minor varianceApproved

      To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.

      20 BAY ST · Jan 15, 2025 · 414 m away
    • Minor varianceApproved

      To permit the reduction of residential parking spaces and types, residential amenity space provided, and tower heights to the 85 ,78, and 70-storey buildings, currently under review by Site Plan Control Application (File Number 20 19218252 STE 10 SA). There will be a total of 2,640 residential dwelling units (with 188 affordable units) within this block (Block4).

      55 LAKE SHORE BLVD E · Oct 23, 2024 · 443 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 674-2020(LPAT)), for an existing 25-storey commercial building (shown as Block 1 on Map 4), by permitting a clinic use.

      100 QUEENS QUAY E · Apr 17, 2024 · 356 m away

    Latest activity nearby

    • Building permit

      Alternative solution to provide specific design features engineered to protect and secure the building's floor openings and stairway.

      1 YONGE ST · Nov 10, 2026 · 251 m away
    • Building permit

      Proposed addition of fire detection devices and control relays for CSA B44 intelligentrecall capabilities (elevator modernization)

      1 HARBOUR SQ · Nov 10, 2026 · 253 m away
    • Zoning review

      Notice Sent

      1 YONGE ST · Oct 19, 2026 · 251 m away
    • Building permitnew building

      Revision to permit 25-182922 BLD for adjustment of elevation to include roof top HVAC unit on E-House #3Proposal to construct three new electrical houses (sheds) that contain electrical equipment for the new electric ferries - City of Toronto, "Jack Layton Ferry Terminal"See also 25 125348 ZAP.

      9 QUEENS QUAY W · Aug 24, 2026 · 192 m away
    • Building permit

      Toronto Star Building Renovation (Phase 2) includes proposed parking structural (Level 2-4), and gounod level retails

      1 YONGE ST · Aug 17, 2026 · 251 m away
    • Building permit

      Installation of a 20 ft x8 ft prefabricated coffee container, to be temporary placed on existing asphalt surface, for take out beverage service, including electrical connection, plumbing fixtures, hand wash sink, fresh water tank,grey water tank and beverages preparation equipment.Erect date 2026/July/01, Tear down date 2026/November/01

      7 QUEENS QUAY E · Jul 16, 2026 · 162 m away
    • Building permit

      Revision 04: Revision to permit (as bubbled)

      10 YONGE ST · Jun 19, 2026 · 298 m away
    • Zoning review

      Closed

      7 QUEENS QUAY E · Jun 10, 2026 · 162 m away
    • Building permit

      Revision: changes to kitchen and piano area

      29 QUEENS QUAY E · Apr 29, 2026 · 66 m away
    • Building permit

      Proposed 30x60 tent for harbour square plaza, jack layton ferry terminal, temporary tent installation may 4-6, 2026

      11 QUEENS QUAY W · Apr 24, 2026 · 244 m away

    Neighbourhood: St Lawrence-East Bayfront-The Islands

    About the area around the lot, not the lot itself.

    Nearest station
    Queens Quay/Ferry Docks Station6 min walk
    Nearest TTC stop
    Queens Quay East at Freeland St3 min walk
    Nearest cycling route
    Martin Goodman TrlMulti-Use Trail - Boulevard, 3 min walk
    Nearest traffic count
    12,888 vehicles in 14 hQueens Quay E / Freeland St, 200 m away, Sep 9, 2026
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 1 with cyclists
    Parks
    Pier 27 Promenade Park1 min walk
    50 Queens Quay East Park4 min walk
    Harbour Square Park Lands4 min walk

    Schools within 1 km

    • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 11 min walk
    • DOWNTOWN ALTERNATIVE SCHOOL English Public 13 min walk
    • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
    Median household income (2020)$87,000$84,500
    Households that own their home40%54%
    Population (2021)31,28516,813
    Homes built in 1960 or before3%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
    Assault1059.7636.3
    Robbery96.369.5
    Shootings4.510.5
    Auto theft24.6192.6
    Theft over $5,00078.446.1
    Break and enter163.5172.8
    Theft from vehicles163.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.