Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
6 building permits open, the oldest since 2016
Needs a closer lookStill open in the City's records: 21 245572 (Window replacement and concrete work, facade restoration and painting, 2021, status Permit Issued); 20 220460 (Proposed precast panel support repairs, 2020, status Permit Issued); 20 145062 (Proposed window and sliding door assembly replacement, 2020, status Permit Issued); and 3 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 25 270017 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations9 development applications open within 300 m
Good to know9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
12 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation25 270017 PRS 00 IRClosed
Property Standards
Dec 27, 2025 · 256 JARVIS ST - Zoning review24 140364 LTOClosedApr 25, 2024 · 256 JARVIS ST
- Building permit21 245572Permit Issued
Window replacement and concrete work, facade restoration and painting
Dec 22, 2021 · 256 JARVIS ST - Building permit20 220460Permit Issued
Proposed precast panel support repairs
Dec 31, 2020 · 256 JARVIS ST - Building permit20 145062Permit Issued
Proposed window and sliding door assembly replacement
Jul 24, 2020 · 256 JARVIS ST - Building permit20 100302Inspection
replace all domestic hot & cold warer vertical risers, horizontal connections at penthouse and ground floor levels & shut-off valves
Jan 24, 2020 · 256 JARVIS ST - Building permit19 102198Permit Issued
Proposal for the addition of fire alarm devices (2 manual pull stations at roof terrace level and heat detector in 2nd floor Janitor Room) in existing building. New fire alarm zone added for Roof Top Terrace.
Jan 24, 2019 · 256 JARVIS ST - Building permit16 233374Inspection
Interior alteration on the 1st floor of the existing office building.A portion of the grocery store use is proposed to become a take-out restaurant - TS
Oct 31, 2016 · 256 JARVIS ST
Show 4 older records
- Building permit11 163298Closed
Proposal to install one backflow prevention device in existing apartment condominium, with some commercial on ground floor.
Apr 7, 2011 · 256 JARVIS ST - Building permit04 161305Closed
Fire alarm system upgarde.
Aug 17, 2004 · 256 JARVIS ST - Zoning review01 196547 LTOClosedNov 20, 2001 · 256 JARVIS ST
- Zoning review98 025656 LTOClosedFeb 11, 1998 · 256 JARVIS ST
Check before you build
Site-specific exception 900.11.10(2091)
Needs a closer look1 site-specific rule and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 256 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 1,569 m²
- Frontage
- 35.9 m
- Depth
- 44.3 m
- Street
- Jarvis St
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c2.0; r4.0) SS1 (x2091) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 95%21 of 22 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 1
- Multiplex permits
- 7
- Development applications
- 25
Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 269 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 403 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 441 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 438 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 295 m away
Latest activity nearby
- Zoning review
Not Started
319 GEORGE ST · Nov 26, 2026 · 159 m away - Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 285 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 45 m away - Building permit
1 Wall Sign***** T-DOT DENTAL*****
306 JARVIS ST · Nov 17, 2026 · 275 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 249 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 249 m away - Building permit
REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
355 CHURCH ST · Oct 30, 2026 · 241 m away - Building permit
Proposal to install a maglock in existing office space.
355 CHURCH ST · Oct 28, 2026 · 241 m away - Building permit
Proposal to construct pedestrian ramp.
117 PEMBROKE ST · Oct 27, 2026 · 270 m away - Minor varianceApproved
To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.
185 GERRARD ST E · Oct 14, 2026 · 294 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station8 min walk
- Nearest TTC stop
- Dundas St East at Jarvis St4 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 2 min walk
- Nearest traffic count
- 14,566 vehicles in 8 hJarvis St: Dundas St E - Gerrard St E, 80 m away, Jun 17, 2010
- Serious collisions within 500 m
- 222021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 4 with cyclists
- Parks
- Allan Gardens3 min walk
- Toronto Metropolitan University Square6 min walk
- Arena Gardens6 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 6 min walk
- TAIE INTERNATIONAL INSTITUTE SCHOOL Private 6 min walk
- LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.