HousePrecheckCheck an address

2552 Keele StToronto · zoning, lot size and permit records

Residential multiple · RM (f21.0; a925; d0.85) (x474)51.0 × 49.3 m2,510 m²on Keele St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 29 rental units, built 1954More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • City upkeep score: 92 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
51.0 m frontage49.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 221275 PRS 00 IV (Order Issued Property Standards: A window in a stairway that extends to less than 1,070..., 2026); 26 221245 PRS 00 IR (Property Standards, 2026); 26 173508 000 00 IR (Adequate Heat, 2026); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 92 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 29 units, built 1954).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 221275 PRS 00 IVClosed

    Order Issued Property Standards: A window in a stairway that extends to less than 1,070 millimetres above the landing is protected by a guard that is less than 1,070 millimetres high measured t

    Aug 17, 2026 · 2552 KEELE ST
  • By-law investigation26 221245 PRS 00 IRClosed

    Property Standards

    Aug 17, 2026 · 2552 KEELE ST
  • By-law investigation26 173508 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 2552 KEELE ST
  • By-law investigation26 173507 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 2552 KEELE ST
  • Building permit09 151220Closed

    Install backflow prevention device and expansion tank in existing residential apartment building.

    Dec 10, 2009 · 2552 KEELE ST

Check before you build

  • Site-specific exception 900.6.10(474)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(474)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
2,510 m²
Frontage
51 m
Depth
49.3 m
Street
Keele St
Corner lot
No
Public lane
None
House footprint
879 m²roof up to 16.4 m
Back yard
12.8 mhouse to rear lot line
Side yards
4.5 m and 5.7 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 21 m. Frontage is about 51.0 m: meets the zone minimum. Source
  • Minimum lot area 925 m². Lot area is 2,510 m²: meets the minimum. Source
  • Zone RM (f21.0; a925; d0.85) (x474) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: hawthorn (8 cm), oak, bur (5 cm), pear chanticleer (5 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%13 of 13 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
1
Development applications
2

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new deck in the rear yard.

    31 DONOFREE RD · May 15, 2025 · 311 m away
  • Minor varianceApproved

    To construct two-storey rear and south east side additions and to include a new attached garage.

    2580 KEELE ST · Sep 14, 2021 · 114 m away
  • Minor varianceApproved

    To construct a second storey rear addition.

    2582 KEELE ST · Oct 6, 2020 · 120 m away
  • Minor varianceApproved

    To enclose a portion of the existing front porch and to construct a new deck in the rear yard.

    65 ERIE ST · Jul 4, 2019 · 242 m away
  • Minor varianceApproved

    To construct a rear detached garage.

    2582 KEELE ST · Oct 12, 2017 · 120 m away

Latest activity nearby

  • Building permit

    Proposed new installation of exterior backwater valve in the front of the house

    429 MAPLE LEAF DR · Nov 17, 2026 · 234 m away
  • Minor variancePending

    In Progress

    429 MAPLE LEAF DR · Oct 30, 2026 · 234 m away
  • Zoning review

    Notice Sent

    429 MAPLE LEAF DR · Aug 27, 2026 · 234 m away
  • Zoning review

    Notice Sent

    429 MAPLE LEAF DR · Aug 27, 2026 · 234 m away
  • Building permit

    Proposal for installation of a backwater valve in a house

    31 JAY ST · Aug 17, 2026 · 279 m away
  • Building permit

    Install inside Backwater Valve, no sump pump

    11 MACLEOD ST · Jul 22, 2026 · 182 m away
  • Building permit

    The proposal involves the addition of a second storey to an existing one-storey single-detached dwelling, along with related interior and exterior modifications. Scope includes deck, integral garage,and front porch

    2 MACLEOD ST · Jul 16, 2026 · 159 m away
  • Building permit

    Proposal to add the roof for the existing front porch

    52 JAY ST · Jun 25, 2026 · 243 m away
  • Building permitdemolition

    Proposal to demolish existing Single Family Dwelling and construct new three storey detached houseplex with 4 dwelling units.

    428 MAPLE LEAF DR · Jun 22, 2026 · 198 m away
  • Building permitmultiplex, new building, new house

    Proposal to demolish existing Single Family Dwelling and construct new three storey detached houseplex with 4 dwelling units.

    428 MAPLE LEAF DR · Jun 19, 2026 · 198 m away

Neighbourhood: Maple Leaf

About the area around the lot, not the lot itself.

Nearest station
Yorkdale Station45 min walk
Nearest TTC stop
Keele St at Maple Leaf Dr3 min walk
Nearest traffic count
2,926 vehicles in 8 hRustic Rd / Erie St, 150 m away, Sep 29, 2015
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Queen's Greenbelt5 min walk
North Park5 min walk
Ernie Lustig - Rainbow Park8 min walk

Schools within 1 km

  • ECOLE ELEMENTAIRE MATHIEU DA COSTA French Public 7 min walk
  • ST FIDELIS CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • ST FRANCIS XAVIER CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • MAPLE LEAF PUBLIC SCHOOL English Public 13 min walk
  • P T MONTESSORI SCHOOL Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMaple LeafMedian neighbourhood
Median household income (2020)$82,000$84,500
Households that own their home55%54%
Population (2021)9,84516,813
Homes built in 1960 or before38%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMaple LeafCity median
Assault379.6636.3
Robbery26.569.5
Shootings8.810.5
Auto theft309192.6
Theft over $5,0005346.1
Break and enter79.5172.8
Theft from vehicles220.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.