HousePrecheckCheck an address

255 McCaul StToronto · zoning, lot size and permit records

Also 20 Orde St, 261 McCaul St

35.5 × 77.2 m2,709 m²on Orde Stcorner, also on McCaul St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 25 268912 (Proposal to replace the existing fire pump.Convenience address is 263 McCaul St, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 31 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
N20 m
35.5 m frontage77.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2007

    Needs a closer look

    Still open in the City's records: 07 269204 (Permit for new fire protection sprinklers, standpipes and fire pump for level one to fo..., 2007, status Inspection); 07 262327 (Interior demolition to first, second and third floors for new Exam Centre and fourth fl..., 2007, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 268912 (Proposal to replace the existing fire pump.Convenience address is 263 McCaul St, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 31 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 268912Permit Issued

    Proposal to replace the existing fire pump.Convenience address is 263 McCaul St

    Feb 27, 2026 · 255 MC CAUL ST
  • Building permit24 178535Closed

    HVAC - Interior alterations - 4th floor room 457 and 457C

    Aug 15, 2024 · 255 MC CAUL ST
  • Building permit23 103274Closed

    Proposal to apply for two non illuminated wall signs.***UNIVERSITY OF TORONTO***

    Jan 31, 2023 · 255 MC CAUL ST
  • Building permit20 155059Closed

    To erect and display an illuminted static copy wall sign at the west elevation of a building inside the property. **Medicine**

    Jun 29, 2020 · 255 MC CAUL ST
  • Building permit19 143456Closed

    Proposal to install backflow prevention device for U of T study hall

    May 30, 2019 · 255 MC CAUL ST
  • Zoning review19 126648 ZPRClosed
    Mar 16, 2019 · 255 MC CAUL ST
  • Zoning review18 159775 ZPRClosed
    May 16, 2018 · 255 MC CAUL ST
  • Zoning review18 107625 ZPRClosed
    Jan 22, 2018 · 255 MC CAUL ST
Show 7 older records
  • Building permit16 202952Closed

    Proposal to install new solar panel arrays on flat roof top of existing 4 storey multiple unit building.

    Sep 19, 2016 · 255 MC CAUL ST
  • Building permit15 160900Closed

    Proposal for interior alterations to office space on the first floor of the existing university building. Convenience addres is 263 Mc Caul St.

    Jun 11, 2015 · 255 MC CAUL ST
  • Building permit12 246488Closed

    Interior alterations to existing office space on the 4th floor. University of Toronto. Convenience address - 263 MC CAUL ST

    Oct 16, 2012 · 255 MC CAUL ST
  • Building permit07 243123Closed

    Interior alterations to 1st, 2nd and 3rd for new Exam Centre and 4th floor for Offices, window and roofing membrane replacement and new internal stairs and elevators.**REVISION** - change fourth floor from demountable partitions to dry-wall.

    Jun 17, 2008 · 255 MC CAUL ST
  • Building permit07 269204Inspection

    Permit for new fire protection sprinklers, standpipes and fire pump for level one to four and roof level (entire building) - FEES paid under initial building permit.

    Nov 19, 2007 · 255 MC CAUL ST
  • Building permit07 262327Inspection

    Interior demolition to first, second and third floors for new Exam Centre and fourth floor for offices; window and roofing membrane replacement and new internal stairs and elevators at a former warehouse for the TDSB. **University of Toronto**

    Oct 4, 2007 · 255 MC CAUL ST
  • Zoning review07 253299 PSPClosed
    Aug 15, 2007 · 255 MC CAUL ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,709 m²
Frontage
35.5 m
Depth
77.2 m
Street
Orde St
Corner lot
Yes, also on McCaul St77.2 m along it
Public lane
None
House footprint
2,243 m²roof up to 19.4 m
Back yard
11.1 mhouse to rear lot line
Side yards
0 m and 0.7 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%15 of 15 decisions
    Garden suite permits
    0
    Laneway suite permits
    3
    Multiplex permits
    7
    Development applications
    17

    Within 300 m, last 10 years. 10 suite and multiplex permits: more than at 75% of Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new two-storey detached ancillary building (containing one garden suite), with a cantilevered second storey in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, and one unit within the ancillary building).

      23 ROSS ST · Apr 1, 2026 · 300 m away
    • Minor varianceApproved

      To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.

      292 DUNDAS ST W · Mar 4, 2026 · 467 m away
    • Minor varianceApproved

      To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.

      150 BEVERLEY ST · Nov 19, 2025 · 472 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.

      28 D'ARCY ST · Feb 26, 2025 · 361 m away
    • Minor varianceApproved

      To convert the existing three-storey mixed-use building (containing four residential dwelling units and non-residential uses within the basement and on the ground floor) into a hotel building (containing 10 units). There will be non-residential uses on the ground level with an outdoor patio, and a second level terrace.

      168 MC CAUL ST · Oct 23, 2024 · 302 m away

    Latest activity nearby

    • Building permit

      Proposed installation of one (1) electromagnetic lock on the shopping concourse level.

      700 UNIVERSITY AVE · Nov 25, 2026 · 146 m away
    • Building permit

      Proposed interior alteration of the exisitng CATH Lab room on floor 16 of the building and replacement of the existing equipment.

      600 UNIVERSITY AVE · Nov 25, 2026 · 223 m away
    • Building permit

      Proposal for interior fit-out of new office space in existing office space.

      700 UNIVERSITY AVE · Nov 23, 2026 · 146 m away
    • Building permit

      Proposal to replace existing fire-pump.

      170 COLLEGE ST · Nov 17, 2026 · 112 m away
    • Building permitsecondary suite

      Revision 01: interior alterations and a 3 storey addition at rear yard. Proposed interior layout modification and 3 storey addition/extension at rear yard. --Party Wall Admin Permits- 2026 216781 BLD 00 SR

      221 BEVERLEY ST · Nov 12, 2026 · 209 m away
    • Building permit

      Interior renovation project to update architectural finishes in the fourth floor ambulatory corridor. Architectural new works involve new rubber sheet flooring, painting and installing ceiling tiles. Demolition scope involves removal of existing floor and wall finishes, ceiling tiles and lights.

      600 UNIVERSITY AVE · Nov 10, 2026 · 223 m away
    • Building permitmultiplex

      Interior alteration to existing apartment 1&2 (first floor) of existing 3 storey Multi Tennant Residential detached dwelling. Replacement of existing basement stair enclosure.

      198 BEVERLEY ST · Nov 9, 2026 · 299 m away
    • Building permit

      Interior fit-out of new office space to existing Group D occupancy on 16th floor.

      700 UNIVERSITY AVE · Nov 6, 2026 · 146 m away
    • Building permit

      Revision 01: selective demo, new partitions, new door & frames, modification to power, lights HVAC, sprinkler & new millwork, new finishes.Selective demo, new partitions, new doors & frames, modifications to power, lights, HVAC, sprinkler, replace sink (one for one), new millwork, new finishes.

      150 COLLEGE ST · Nov 4, 2026 · 172 m away
    • Zoning review

      Not Started

      3 BALDWIN ST · Nov 3, 2026 · 270 m away

    Neighbourhood: Kensington-Chinatown

    About the area around the lot, not the lot itself.

    Nearest station
    Queen's Park Station3 min walk
    Nearest TTC stop
    College St at McCaul St2 min walk
    Nearest cycling route
    College StCycle Track, 1 min walk
    Nearest traffic count
    17,449 vehicles in 14 hCollege St / McCaul St, 90 m away, Oct 9, 2025
    Serious collisions within 500 m
    72021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 5 with cyclists
    Parks
    McCaul - Orde Parkette1 min walk
    Julius Deutsch Park6 min walk
    Lillian H. Smith Park7 min walk

    Schools within 1 km

    • RONALD MCDONALD HOUSE Private 1 min walk
    • ORDE STREET JR PUBLIC SCHOOL English Public 1 min walk
    • CORNERSTONE PREPARATORY SCHOOL - MAIN CAMPUS Private 6 min walk
    • BEVERLEY & SUBWAY ACADEMY TWO English Public 6 min walk
    • BRAEMAR COLLEGE PRIVATE SECONDARY SCHOOL Private 6 min walk
    • HEYDON PARK SECONDARY SCHOOL English Public 7 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureKensington-ChinatownMedian neighbourhood
    Median household income (2020)$62,000$84,500
    Households that own their home32%54%
    Population (2021)18,12016,813
    Homes built in 1960 or before26%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleKensington-ChinatownCity median
    Assault2017.5636.3
    Robbery19369.5
    Shootings21.910.5
    Auto theft118.4192.6
    Theft over $5,000219.346.1
    Break and enter443172.8
    Theft from vehicles850.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.