HousePrecheckCheck an address

253 Wellesley St EToronto · zoning, lot size and permit records

Residential · R (d1.0) (x881)21.2 × 76.5 m1,390 m²on Wellesley St Ebacks onto Garner Lane

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 162610 (Proposal to repair the front porch of an existing apartment building. Footprint to be m..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 47 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
  • Major Transit Station Area: SherbourneThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
21.2 m frontage76.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2015

    Needs a closer look

    Still open in the City's records: 23 126706 (Work under this contract includes (but is not limited to): - Sister Wood studs, or if n..., 2023, status Permit Issued); 15 171940 (Repair and rewaterproofing of garage suspeneded slab and structural repairs, 2015, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 162610 (Proposal to repair the front porch of an existing apartment building. Footprint to be m..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 47 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit26 162610Inspection

    Proposal to repair the front porch of an existing apartment building. Footprint to be maintained.

    Jul 8, 2026 · 253 WELLESLEY ST E
  • Building permit23 126706Permit Issued

    Work under this contract includes (but is not limited to): - Sister Wood studs, or if not possible replace like-for-like, as per table 9.3.2.1 of the OBC, NO.2 Standard Stud

    Mar 28, 2023 · 253 WELLESLEY ST E
  • Building permit19 220869Closed

    Proposal for interior alterations to unit c of existing condo townhouse.

    Oct 7, 2019 · 253 WELLESLEY ST E
  • Building permit15 171940Inspection

    Repair and rewaterproofing of garage suspeneded slab and structural repairs

    Nov 18, 2015 · 253 WELLESLEY ST E

Check before you build

  • Site-specific exception 900.2.10(881)

    Needs a closer look

    1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(881)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4).

  2. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86

  3. Older by-law C

    On 253 Wellesley St. E., former City of Toronto by-law 326-87.

1 part for other addresses
  • B On 54 Aberdeen Ave., former City of Toronto by-law 234-69
By-law 569-2013, Chapter 900

Lot facts

Area
1,390 m²
Frontage
21.2 m
Depth
76.5 m
Street
Wellesley St E
Corner lot
No
Public lane
Garner Lane, 45.8 m along it
Max height
13 m
Max lot coverage
—
  • Major Transit Station Area: Sherbourne. The lot is inside the Sherbourne Major Transit Station Area approved by the Province (Site and Area Specific Policy 601). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x881) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%18 of 18 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
6
Development applications
7

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a side (south) two storey addition. Also, to construct rear ground floor and second storey bay windows, a rear second storey balcony, and a rear third storey rooftop pergola and terrace extension (above the second storey roof).

    380 BERKELEY ST · Jun 3, 2026 · 492 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.

    21 METCALFE ST · Apr 29, 2026 · 439 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor stair landing, and a side (south) basement walkout. The existing basement walkout and rear deck with be demolished, and a portion of the rear second storey roof will be reconstructed. Also, to construct one additional parking space (for a total of two parking spaces), abutting the laneway.

    388 BERKELEY ST · Feb 18, 2026 · 471 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).

    32 SALISBURY AVE · Jul 30, 2025 · 465 m away
  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.

    20 ABERDEEN AVE · Nov 6, 2024 · 295 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached mixed-use building by constructing a rear one-storey addition. There is one non-residential unit (eating establishment) occupying the basement and ground floor, and one residential dwelling unit occupying the second and third levels. The existing rear yard parking space will be removed.

    546 PARLIAMENT ST · Nov 25, 2026 · 193 m away
  • Building permit

    Fire Damage in a High-rise Residential Building: Removing and replacing all damaged interior finishes and partition walls, balcony windows and doors, and balcony railings in the affected unit. If further investigation confirms damage to the concrete balcony slab, it will be repaired or replaced.

    666 ONTARIO ST · Nov 25, 2026 · 280 m away
  • Building permit

    REVISION - EXIT STAIR FLIPPED TO RUN SOUTH WITH NEW LANDING/FOUNDATIONS, EXIT DOOR RELOCATED, 2 NEW WINDOWS IN WEST WALL. NO CHANGE TO USE OR AREA.Proposal for interior alteration to add a partial new floor area on the 2nd floor of the building; Health & Fitness Club ( Group D & A2).

    159 BLEECKER ST · Nov 25, 2026 · 168 m away
  • Building permit

    Building a 10' x 12' deck to replace the previously existing deck.

    27 WINCHESTER ST · Nov 19, 2026 · 252 m away
  • Zoning review

    Not Started

    311 WELLESLEY ST E · Nov 10, 2026 · 223 m away
  • Building permit

    Proposal to undertake Exterior Renovations (AODA), including modifications to exterior parking areas, line painting, stairs (guards, handrails, and tactile warning indicators), installation of permeable pavers, and curbs to improve accessibility and bring the site into compliance with AODA requirements.

    439 SHERBOURNE ST · Nov 3, 2026 · 219 m away
  • Building permit

    Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator from Ground floor to 3rd floor for the use of Unit #3, Roof access stair and enclosure, cladding change at 4th floor (from stucco to metal siding)Revision 02 - Partial 4th storey at rear (east side), Dwelling Unit #3 to become a storey unit (no changes in unit count), interior layout changes to suit as-built, structural upgrades to accommodate additional storey.Revision 01 - roof access stair and enclosure (no occupancy on roof, maintenance only)To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units

    549 PARLIAMENT ST · Oct 20, 2026 · 258 m away
  • Zoning review

    Closed

    209 WELLESLEY ST E · Oct 8, 2026 · 144 m away
  • Building permit

    1 wall sign**NAILHOLICS**

    540 PARLIAMENT ST · Sep 24, 2026 · 202 m away
  • Building permit

    Proposal for wholesale replacement of podium deck landscape finishes, wholesale waterproofing replacement, drainage system repairs, swimming pool demo, localized slab replacement, mechanical/electrical repairs

    200 WELLESLEY ST E · Sep 24, 2026 · 197 m away

Neighbourhood: Cabbagetown-South St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station11 min walk
Nearest TTC stop
Wellesley St East at Ontario St1 min walk
Nearest cycling route
Wellesley St ECycle Track, 1 min walk
Nearest traffic count
5,772 vehicles in 8 hWellesley St E / Ontario St, 70 m away, Apr 7, 2022
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 1 with cyclists
Parks
Winchester Park2 min walk
Bleecker Parkette2 min walk
Winchester Square Park5 min walk

Schools within 1 km

  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 2 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • ROSE AVENUE JR PUBLIC SCHOOL English Public 6 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 8 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 9 min walk
  • MONSIGNOR FRASER - ST MARTIN CAMPUS English Separate 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCabbagetown-South St.James TownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home45%54%
Population (2021)11,02016,813
Homes built in 1960 or before42%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCabbagetown-South St.James TownCity median
Assault1078.6636.3
Robbery145.369.5
Auto theft91.8192.6
Theft over $5,00022.946.1
Break and enter321.3172.8
Theft from vehicles229.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.