Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2527 Yonge St
2527 Yonge St is on a 6.1 m by 39.9 m lot on Yonge St in Mount Pleasant East. The zoning is CR. A site-specific exception, 900.11.10(530), changes some of the usual rules for this address.
The City has 13 records on this lot since 1999. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Rev 01 - revision interior alterations with revised hvac.proposal for interior alterations to convert second floor residential suite to medical office". Status: closed. In 2020, a building permit was filed: "Proposal to construct a rear two storey addition to existing mixed use building". Status: closed. In 2020, a building permit was filed: "Proposal to install a 3/4" rp backflow prevention device with expansion tank for main premise isolation". Status: closed. Nothing on file is open right now.
Within 300 m, 5 development applications are open (the tallest up to 27 storeys). Within 300 m, the Committee of Adjustment decided 31 minor variance applications in the last 10 years and approved 84%. Eglinton station is a 13-minute walk.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(530)Moderate
- 4 by-law investigations closed in the last two yearsLow
- 5 development applications open within 300 mLowFree check
- Yonge-Eglinton Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 4 by-law investigations closed in the last two years
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
4 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
13 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-07-28 | Building permit25 101321 | Rev 01 - Revision interior alterations with revised HVAC.Proposal for interior alterations to convert second floor residential suite to medical office. | Closed | |
| 2025-02-13 | By-law investigation25 117169 PRS 00 IR | Property Standards | Closed | |
| 2025-02-10 | By-law investigation25 115776 PRS 00 IV | Notice Issued Prop Standards | Closed | |
| 2025-02-10 | By-law investigation25 115114 PRS 00 IR | Property Standards | Closed | |
| 2025-01-20 | By-law investigation25 106631 HEA 00 IR | Adequate Heat | Closed | |
| 2024-10-17 | Zoning review24 227259 ZAP | No description on file | Application On Hold | |
| 2020-01-15 | Building permit19 186536 | Proposal to construct a rear two storey addition to existing mixed use building. | Closed | |
| 2020-01-06 | Building permit19 258262 | Proposal to install a 3/4" RP Backflow Prevention device with expansion tank for main premise isolation. | Closed | |
| 2019-04-18 | Minor varianceA0124/19NY | To construct a two-storey addition to the rear of the existing buidling. | Approved | |
| 2018-12-05 | Zoning review18 264836 ZZC | No description on file | Closed | |
| 1999-12-17 | Building permit99 113889 | alter h.v.a.c. system on 1st floor. | Closed | |
| 1999-12-14 | Building permit99 107471 | install 4 B.S.1-W.B. 1-W.C.., 3 cuspidors on 1st floor in connection with dental office.cost incl. with B.P. 107456. | Closed | |
| 1999-12-14 | Building permit99 107456 | Make interior alterations to 1st floor, also alter storefront. hold for survey approval. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(530)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(530)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(530)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR SS2 (x530)
- Height limit
- 27 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 103 m²
- Back yard
- 18.4 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 5 development applications open within 300 m, up to 27 storeys
- 3 suite and multiplex permits within 300 m in 10 years
- 31 minor variance decisions within 300 m, 84% approved
What this part means for this house, in plain EnglishUnlock
5 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Mount Pleasant East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Eglinton StationNearest station13 min walk
- Yonge St at Sherwood AveNearest TTC stop1 min walk
- Duplex AveNearest cycling route3 min walk
- St Clements SchoolSchool1 min walk
- John Fisher Jr Public SchoolSchool3 min walk
- St Clements Early LearningSchool3 min walk
- St Monica Catholic Elementary SchoolSchool5 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3336.5
- Robberycity median 69.510.2
- Auto theftcity median 192.6224.4
- Theft over $5,000city median 46.145.9
- Break and entercity median 172.8204
- Theft from vehiclescity median 188.1107.1
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist