HousePrecheckCheck an address

2505 Eglinton Ave EToronto · zoning, lot size and permit records

Commercial residential · CR 0.4 (c0.4; r0.0) SS3 (x574)13.7 × 58.0 m792 m²on Eglinton Ave E

Not a home

Land without a building

A demolition permit (25 191442, 2025) is on file and no permit for a new building: the land is probably empty or used for parking. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 25 191442 (Proposal for the demolition of this property in order to build the Kennedy Box Structure, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 11 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • Major Transit Station Area: Kennedy (Subway)The City plans more homes around the station: good for transit, and more building over time.
N20 m
13.7 m frontage58.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 191442 (Proposal for the demolition of this property in order to build the Kennedy Box Structure, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 11 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit25 191442Inspectiondemolition

    Proposal for the demolition of this property in order to build the Kennedy Box Structure

    Aug 11, 2025 · 2505 EGLINTON AVE E
  • Zoning review23 225284 ZZUCancelled
    Nov 13, 2023 · 2505 EGLINTON AVE E
  • Zoning review15 208138 ZZUClosed
    Aug 17, 2015 · 2505 EGLINTON AVE E
  • Building permit14 186612Closed

    install back flow preventor "Balmoral FUneral Home"

    Jul 11, 2014 · 2505 EGLINTON AVE E
  • Building permit03 100486Closed

    INTERIOR ALTERATIONS FOR BALMORAL FUNERAL HOME

    Apr 14, 2003 · 2505 EGLINTON AVE E

Check before you build

  • Site-specific exception 900.11.10(574)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(574)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The permitted maximum gross floor area is 40% of the lot area

  2. Rule B

    The minimum building setback from a lot line that abuts a street is: (i) 16.5 metres from the original centre line of Midland Ave.; (ii) the greater of 23.0 metres from the original centre line of Eglinton Ave., or 5.0 metres from a lot line abutting Eglinton Ave.; and (iii) 3.0 metres from a lot line abutting any street other than Eglinton Ave. or Midland Ave.

  3. Rule C

    The minimum building setback is 7.5 metres from a rear lot line . Prevailing By-laws and Prevailing Sections: (None Apply)

  4. Older by-law A

    The permitted maximum gross floor area is 40% of the lot area

  5. Older by-law B

    The minimum building setback from a lot line that abuts a street is: (i) 16.5 metres from the original centre line of Midland Ave.; (ii) the greater of 23.0 metres from the original centre line of Eglinton Ave., or 5.0 metres from a lot line abutting Eglinton Ave.; and (iii) 3.0 metres from a lot line abutting any street other than Eglinton Ave. or Midland Ave.

  6. Older by-law C

    The minimum building setback is 7.5 metres from a rear lot line . Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
792 m²
Frontage
13.7 m
Depth
58 m
Street
Eglinton Ave E
Corner lot
No
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
11 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Kennedy (Subway). The lot is inside the Kennedy (Subway) Major Transit Station Area approved by the Province (Site and Area Specific Policy 647). Source
  • Zone CR 0.4 (c0.4; r0.0) SS3 (x574) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
2
Development applications
2

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing mixed-use building by constructing interior alterations to convert ground floor retail space into 4 residential units.

    2495 EGLINTON AVE E · Feb 11, 2026 · 68 m away
  • Minor varianceApproved

    To permit a new vehicle dealership use within the existing building by converting a portion of the existing vehicle service shop area. There will be no exterior alterations.

    79 WINTER AVE · Oct 8, 2025 · 413 m away
  • Minor varianceApproved

    To construct an addition to the front and rear of the existing commercial building.

    2584 EGLINTON AVE E · Oct 15, 2015 · 379 m away

Latest activity nearby

  • Minor variancePending

    Convert the previously used restaurant building into an Auto Sales and Service Facility

    2567 EGLINTON AVE E · Nov 5, 2026 · 245 m away
  • Zoning review

    Closed

    2480 EGLINTON AVE E · Sep 25, 2026 · 127 m away
  • Zoning review

    Notice Sent

    2567 EGLINTON AVE E · Aug 5, 2026 · 245 m away
  • Zoning review

    Closed

    2495 EGLINTON AVE E · Jul 8, 2026 · 68 m away
  • Building permit

    Proposed replacement of the fire alarm system

    2467 EGLINTON AVE E · Jul 7, 2026 · 275 m away
  • Building permitgarden suite

    Proposal to convert the existing garage to a Garden Suite

    795 MIDLAND AVE · Apr 29, 2026 · 146 m away
  • Building permit

    Proposal for replacement of existing fire pump and sprinkler header and associated electrical components.

    120 TOWN HAVEN PL · Apr 15, 2026 · 92 m away
  • Zoning review

    Closed

    107 COMMONWEALTH AVE · Apr 13, 2026 · 225 m away
  • Zoning review

    Closed

    107 COMMONWEALTH AVE · Apr 13, 2026 · 225 m away
  • Building permit

    Proposal for a canopy at rear.

    9 LORD ROBERTS DR · Mar 4, 2026 · 195 m away

Neighbourhood: Kennedy Park

About the area around the lot, not the lot itself.

Nearest station
Kennedy Station8 min walk
Nearest TTC stop
Eglinton Ave East at Midland Ave1 min walk
Nearest cycling route
Gatineau Hydro Corridor TrlMulti-Use Trail, 7 min walk
Nearest traffic count
36,815 vehicles in 14 hEglinton Ave E / Midland Ave, 80 m away, Oct 14, 2026
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
Glen Ravine Park6 min walk
Kitchener Park7 min walk
Corvette Park11 min walk

Schools within 1 km

  • ST JOAN OF ARC CATHOLIC ACADEMY English Separate 7 min walk
  • GLEN RAVINE JR PUBLIC SCHOOL English Public 10 min walk
  • WALTER PERRY JR PUBLIC SCHOOL English Public 10 min walk
  • S/E YEAR ROUND ALTERNATIVE & SCARBOROUGH CENTRE English Public 11 min walk
  • SALAHEDDIN ISLAMIC SCHOOL Private 11 min walk
  • A PLUS ACADEMY OF ADVANCEMENT Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKennedy ParkMedian neighbourhood
Median household income (2020)$69,000$84,500
Households that own their home52%54%
Population (2021)17,11016,813
Homes built in 1960 or before34%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKennedy ParkCity median
Assault1521.5636.3
Robbery121.569.5
Homicide5.35.3
Shootings15.810.5
Auto theft211.3192.6
Theft over $5,00084.546.1
Break and enter158.5172.8
Theft from vehicles401.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.