HousePrecheckCheck an address

2500 Lawrence Ave EToronto · zoning, lot size and permit records

79.5 × 225.7 m17,925 m²on Lawrence Ave E

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 2 development applications open within 300 m, up to 33 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
79.5 m frontage225.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (95% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (21% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (24% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 5 Committee of Adjustment files on this lot

    Good to know

    5 approved. A0265/25SC (To permit a vehicle repair use and a reduction in the required number of parking spaces, 2026); A0048/24SC (To permit a grocery store within the existing building and reduce the number of parking..., 2024); A0257/20SC (The purpose of this application is to permit a vehicle repair use and for a reduction i..., 2021); and 2 more.

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 33 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • Minor varianceA0265/25SCApproved

    To permit a vehicle repair use and a reduction in the required number of parking spaces.

    Mar 11, 2026 · 2500 LAWRENCE AVE E
  • Zoning review25 269036 ZZUClosed
    Dec 22, 2025 · 2500 LAWRENCE AVE E
  • Minor varianceA0048/24SCApproved

    To permit a grocery store within the existing building and reduce the number of parking spaces.

    Jun 26, 2024 · 2500 LAWRENCE AVE E
  • Building permit23 177648Closed

    Plumbing - To enlarged Existing washroom

    Sep 13, 2023 · 2500 LAWRENCE AVE E
  • Zoning review21 230777 ZPRClosed
    Oct 26, 2021 · 2500 LAWRENCE AVE E
  • Minor varianceA0257/20SCApproved

    The purpose of this application is to permit a vehicle repair use and for a reduction in the required number of parking spaces. Note: This application was deferred by the Committee of Adjustment at their hearing on December 15, 2020 in order to correctly identify the required for the number of parking spaces. Minor Variance Application A035/15SC was approved by the Committee of Adjustment that permitted the use of a vehicle repair garage for a period of 5 years on condition that prior to the expiration of the permitted use variance, the owner apply for a Zoning By-law Amendment to permit the use on a permanent basis. The Committee through the same application also approved a parking reduction from 145 parking spaces to 110 parking spaces.

    Jan 27, 2021 · 2500 LAWRENCE AVE E
  • Zoning review20 234381 LTOClosed
    Dec 29, 2020 · 2500 LAWRENCE AVE E
  • Zoning review20 148377 LPRClosed
    May 25, 2020 · 2500 LAWRENCE AVE E
Show 11 older records
  • Building permit17 166945Cancelled

    Proposal to install 8 double check valves (3/4 inch), 1 double check valve (1 inch), and 1 reduced pressure valve (3/4 inch).

    May 26, 2017 · 2500 LAWRENCE AVE E
  • Minor varianceA147/16SCApproved

    This application is for a variance to permit Unit 5 to continue to be used for an existing automotive and truck rental business. In the zoning by-law, Unit 5 straddles the boundary between two zones. The north part of the unit is in the Industrial Commercial (MC) zone, which permits a Vehicle Sales Operation. (In the zoning by-law, a Vehicle Sales Operation is a use that includes the automotive and truck rental business.) The south part of Unit 5 is in the Industrial Commercial (MC) and Industrial District Commercial (MDC) zone, but there is an exception in the zoning by-law that restricts the range of permitted uses, and a Vehicle Sales Operation is not a permitted use.

    Jul 14, 2016 · 2500 LAWRENCE AVE E
  • Zoning review16 117908 LPRClosed
    Feb 18, 2016 · 2500 LAWRENCE AVE E
  • Minor varianceA035/15SCApproved

    To permit a vehicle repair garage in Unit 10.

    Mar 18, 2015 · 2500 LAWRENCE AVE E
  • Zoning review14 240103 LPRClosed
    Oct 20, 2014 · 2500 LAWRENCE AVE E
  • Zoning review12 204690 LTOClosed
    Jul 4, 2012 · 2500 LAWRENCE AVE E
  • Zoning review10 109124 LTOClosed
    Jan 25, 2010 · 2500 LAWRENCE AVE E
  • Zoning review08 212153 ZPUClosed
    Oct 10, 2008 · 2500 LAWRENCE AVE E
  • Zoning review08 113465 LPRClosed
    Feb 22, 2008 · 2500 LAWRENCE AVE E
  • Zoning review07 266329 LTOClosed
    Oct 1, 2007 · 2500 LAWRENCE AVE E
  • Zoning review03 174339 LTOClosed
    Sep 13, 2003 · 2500 LAWRENCE AVE E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
17,925 m²
Frontage
79.5 m
Depth
225.7 m
Street
Lawrence Ave E
Corner lot
No
Public lane
None
House footprint
7,099 m²roof up to 16.1 m
Back yard
52.3 mhouse to rear lot line
Side yards
12.3 m and 13 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%4 of 4 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a vehicle repair use and a reduction in the required number of parking spaces.

      2500 LAWRENCE AVE E · Mar 11, 2026 · 48 m away
    • Minor varianceApproved

      To alter the development standards for the mixed use development, by increasing the overall building height, the number of units and density. Cross-Reference Site Plan Application 21 145567 ESC 22 SA.

      2655 LAWRENCE AVE E · Oct 8, 2025 · 445 m away
    • Minor varianceApproved

      To legalize the temporary work-site shelter building, fronting Nantucket Boulevard (on the South-East portion of the site).

      1 NANTUCKET BLVD · Mar 12, 2025 · 310 m away
    • Minor varianceApproved

      To reduce indoor amenity space of the existing building.

      1385 MIDLAND AVE · Nov 13, 2024 · 399 m away
    • Minor varianceApproved

      To permit a grocery store within the existing building and reduce the number of parking spaces.

      2500 LAWRENCE AVE E · Jun 26, 2024 · 48 m away

    Latest activity nearby

    • Zoning review

      Closed

      2560 LAWRENCE AVE E · Nov 23, 2026 · 175 m away
    • Zoning review

      Closed

      120 MIDWEST RD · Nov 5, 2026 · 272 m away
    • Building permit

      Rev 01: Fire Damage in of a Commercial Building: Removal and Replacement of Fire Damaged Steel Roof Deck and Roofing Membrane - Removal and Replacement of Upper Exterior Wall Closure and Garage Door - Removal and Replacement of Interior FinishesProposal for fire damage in of a commercial building: removal and replacement of fire damaged steel roof deck and roofing membrane - removal and replacement of upper exterior wall closure and garage door - removal and replacement of interior finishes

      80 MIDWEST RD · Oct 28, 2026 · 166 m away
    • Zoning review

      Closed

      2450 LAWRENCE AVE E · Sep 22, 2026 · 161 m away
    • Building permit

      Proposed installation of two new magnetic locks and card access control.

      2440 LAWRENCE AVE E · Sep 21, 2026 · 273 m away
    • Building permit

      Change of use to assembly occupancy with interior and exterior renovations to an existing commercial building.

      1490-1500 MIDLAND AVE · May 15, 2026 · 166 m away
    • Zoning review

      Cancelled

      1490-1500 MIDLAND AVE · Apr 24, 2026 · 166 m away
    • Minor varianceApproved

      To permit a vehicle repair use and a reduction in the required number of parking spaces.

      2500 LAWRENCE AVE E · Mar 11, 2026 · 48 m away
    • Zoning review

      Closed

      1490-1500 MIDLAND AVE · Feb 5, 2026 · 166 m away
    • Zoning review

      Closed

      2500 LAWRENCE AVE E · Dec 22, 2025 · 48 m away

    Neighbourhood: Dorset Park

    About the area around the lot, not the lot itself.

    Nearest station
    Lawrence East Station5 min walk
    Nearest TTC stop
    Lawrence Ave East at Prudential Dr East Side3 min walk
    Nearest cycling route
    The MeadowayMulti-Use Trail, 9 min walk
    Nearest traffic count
    20,562 vehicles in 14 hMidland Ave: Lawrence Ave E - Treewood St, 210 m away, Aug 25, 2026
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Arsandco Park6 min walk
    Donwood Park8 min walk
    Kennedy - Lawrence Parkette10 min walk

    Schools within 1 km

    • DAVID AND MARY THOMSON COLLEGIATE English Public 8 min walk
    • DONWOOD PARK JR PUBLIC SCHOOL - HIGHBROOK CAMPUS English Public 10 min walk
    • DONWOOD PARK JR PUBLIC SCHOOL - MAIN BLDG English Public 11 min walk
    • CHARLES GORDON SR PUBLIC SCHOOL English Public 15 min walk
    • WINSTON CHURCHILL COLLEGIATE INSTITUTE English Public 16 min walk
    • DORSET PARK PUBLIC SCHOOL English Public 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDorset ParkMedian neighbourhood
    Median household income (2020)$79,000$84,500
    Households that own their home60%54%
    Population (2021)24,30516,813
    Homes built in 1960 or before26%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDorset ParkCity median
    Assault672636.3
    Robbery112.669.5
    Shootings18.210.5
    Auto theft356192.6
    Theft over $5,00072.646.1
    Break and enter192.5172.8
    Theft from vehicles334.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.