HousePrecheckCheck an address

250 Queens Quay WToronto · zoning, lot size and permit records

Also 246 Queens Quay W, 248 Queens Quay W

18.7 × 39.5 m688 m²on Queens Quay W

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 217047 (Proposal for retail canopy refinishing at ground level exterior including replacement o..., 2025); 26 139491 (Proposal for interior alterations to existing restaurant including millwork and patio e..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 59 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
18.7 m frontage39.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 130165 ZON 00 IR (Zoning, 2026); 25 184363 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 217047 (Proposal for retail canopy refinishing at ground level exterior including replacement o..., 2025); 26 139491 (Proposal for interior alterations to existing restaurant including millwork and patio e..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 59 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit26 139491Examiner's Notice Sent

    Proposal for interior alterations to existing restaurant including millwork and patio extension

    Apr 7, 2026 · 250 QUEENS QUAY W
  • By-law investigation26 130165 ZON 00 IRClosed

    Zoning

    Mar 16, 2026 · 250 QUEENS QUAY W
  • Building permit25 217047Permit Issued

    Proposal for retail canopy refinishing at ground level exterior including replacement of ceiling fishes, lighting, painting and miscellaneous repairs

    Nov 5, 2025 · 250 QUEENS QUAY W
  • By-law investigation25 184363 PRS 00 IRClosed

    Property Standards

    Jun 26, 2025 · 250 QUEENS QUAY W
  • Building permit11 303391Closed

    Proposal to install one backflow prevention device for existing mixed-use condominium building.

    Dec 1, 2011 · 250 QUEENS QUAY W
  • Zoning review10 281290 LTOClosed
    Oct 20, 2010 · 250 QUEENS QUAY W
  • Building permit10 118683Closed

    Interior alterations for a new take out restauraunt within unit #7, "JAIPUR EXPRESS". This proposal includes plumbing and hvac.

    Mar 12, 2010 · 250 QUEENS QUAY W
  • Building permit06 166799Closed

    To replace existing fire alarm and voice communication systems panels

    Sep 14, 2006 · 250 QUEENS QUAY W
Show 1 older records
  • Zoning review89 029961 LTOClosed
    Apr 13, 1989 · 248 QUEENS QUAY W

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
688 m²
Frontage
18.7 m
Depth
39.5 m
Street
Queens Quay W
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%3 of 3 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    4

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).

      350 QUEENS QUAY W · Jun 17, 2026 · 341 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.

      200 QUEENS QUAY W · Nov 12, 2025 · 291 m away
    • Minor varianceApproved

      To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.

      350 QUEENS QUAY W · Apr 9, 2025 · 341 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building, by reducing the minimum number of residential dwelling units that shall contain two or more bedrooms.

      200 QUEENS QUAY W · Dec 6, 2023 · 291 m away
    • Minor varianceApproved

      To permit the permanent operation of an outdoor patio (including the canopy) on the ground floor of the existing 54-storey mixed-use building.

      15 YORK ST · Dec 6, 2023 · 467 m away

    Latest activity nearby

    • Building permit

      Truss structure for outdoor lighting and sound equipment. - Install November 17, 2026 and Dismantle March 1, 2027

      235 QUEENS QUAY W · Nov 18, 2026 · 159 m away
    • Building permit

      Proposal for interior alterations to Cafe Bar Lobby, proposed hotel entrance awnings & refinishing existing cladding.

      249 QUEENS QUAY W · Nov 17, 2026 · 102 m away
    • Building permit

      Structural work required to support the roof AC unit replacement; Related to 26 243296

      235 QUEENS QUAY W · Nov 2, 2026 · 159 m away
    • Building permit

      REV 01: Revision to permit to update exit stair configurationProposal for removal of three later exterior walls and installation of new curtain wall systems to match and align with adjacent existing curtain wall assemblies.

      255 BREMNER BLVD · Nov 2, 2026 · 256 m away
    • Building permit

      Installation of two sets of doors within a public corridor

      235 QUEENS QUAY W · Oct 7, 2026 · 159 m away
    • Building permit

      Proposal for rooftop units replacement. - Harbourfront Centre Toronto

      235 QUEENS QUAY W · Sep 30, 2026 · 159 m away
    • Building permit

      Proposal to install a temporary tent & a tv support frame, tent has no walls and is anchored with concrete blocks, installed 18th to 21st sept, 2026

      235 QUEENS QUAY W · Sep 21, 2026 · 159 m away
    • Building permit

      Installation of temporary tenting for Power Ball 2026 - ONE - 30'x60 -TENT (CERT#25 135938 000 00) Anchored with water barrels. Install is Sept 15th. Event is Sept 17th. Removal is Sept 21st.

      231 QUEENS QUAY W · Sep 11, 2026 · 248 m away
    • Building permit

      1 Wall Sign****RABBA FINE FOODS****

      250 A QUEENS QUAY W · Sep 11, 2026 · 17 m away
    • Minor variancePending

      Application Withdrawn

      200 QUEENS QUAY W · Aug 12, 2026 · 291 m away

    Neighbourhood: Harbourfront-CityPlace

    About the area around the lot, not the lot itself.

    Nearest station
    Queens Quay/Ferry Docks Station11 min walk
    Nearest TTC stop
    Queens Quay West at Rees St3 min walk
    Nearest cycling route
    Waterfront TrlMulti-Use Trail - Boulevard, 1 min walk
    Nearest traffic count
    11,179 vehicles in 14 hRobertson Cres / Rees St / Queens Quay W, 140 m away, Sep 11, 2025
    Serious collisions within 500 m
    92021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 1 with cyclists
    Parks
    Rees Street Parkette1 min walk
    Toronto Waterfront Park1 min walk
    Roundhouse Park2 min walk

    Schools within 1 km

    • JEAN LUMB PUBLIC SCHOOL English Public 12 min walk
    • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHarbourfront-CityPlaceMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home40%54%
    Population (2021)28,13516,813
    Homes built in 1960 or before0%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHarbourfront-CityPlaceCity median
    Assault883.3636.3
    Robbery48.169.5
    Homicide2.85.3
    Shootings8.510.5
    Auto theft56.6192.6
    Theft over $5,00056.646.1
    Break and enter141.6172.8
    Theft from vehicles121.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.