HousePrecheckCheck an address

250 Manitoba StToronto · zoning, lot size and permit records

≈ 76.2 × 110.9 m4,107 m²on Legion Rd Ncorner, also on Manitoba St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.4 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 123571 (Proposed concrete repairs during the waterproofing repairs in the upper garage parking, 2026). Larger work can mean noise and trucks next door; read what each one is for.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 76.2 m frontage≈ 110.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit26 123571Inspection

    Proposed concrete repairs during the waterproofing repairs in the upper garage parking.

    Mar 30, 2026 · 250 MANITOBA ST
  • Building permit11 147669Closed

    Proposal to replace fire alarm panel on ground floor.

    Apr 15, 2011 · 250 MANITOBA ST
  • Building permit10 307495Closed - Dormant

    Installation of (1) backflow prevention device into existing condo building.

    Jan 6, 2011 · 250 MANITOBA ST
  • Building permit05 206660Closed - Dormant

    Relocate exist. kitchen sink & dishwasher to new location in exist. unit in apartment building

    Feb 21, 2006 · 250 MANITOBA ST
  • Zoning review06 106543 LTOClosed
    Feb 1, 2006 · 250 MANITOBA ST
  • Zoning review02 136760 ZPUClosed
    May 16, 2002 · 250 MANITOBA ST
  • Building permit97 085788Closed

    ADDITION/ALTERATIONS TO APARTMENT BLDG.

    Mar 25, 1998 · 250 MANITOBA ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,107 m²
Frontage
76.2 mestimated, irregular lot
Depth
110.9 mestimated, irregular lot
Street
Legion Rd N
Corner lot
Yes, also on Manitoba St110.9 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      13 BRUSSELS ST · Nov 19, 2026 · 323 m away
    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      13 BRUSSELS ST · Nov 19, 2026 · 323 m away
    • Minor varianceApproved

      To alter the existing building in order to accommodate an eating establishment with a drive through facility.

      515 THE QUEENSWAY · Sep 24, 2026 · 481 m away
    • Minor varianceApproved

      To construct a two-storey rear addition and a deck in the rear yard.

      38 GRAND AVE · Jul 16, 2026 · 309 m away
    • Minor varianceApproved

      To construct a new detached dwelling.

      56 MILTON ST · May 14, 2026 · 492 m away

    Latest activity nearby

    • Building permit

      Proposed interior alterations to change kitchen layout.

      7 E BRUSSELS ST · Oct 15, 2026 · 289 m away
    • Building permit

      Proposal for main entrance driveway restoration - the work includes removal and disposal of existing overburden and site components. New work includes concrete curbs and reinforced driveway, waterproofing membrane, expansion joints, unit pavers, gate arms, and associated site elements. The scope also includes reinstating the intercom and guardrail systems, re-leveling existing pavers, and repairing deteriorated stucco.

      155 LEGION RD N · Sep 21, 2026 · 136 m away
    • Building permit

      Proposed concrete repairs during the waterproofing repairs in the upper garage parking.

      250 MANITOBA ST · Mar 30, 2026 · 3 m away
    • Building permit

      Domestic hot water piping replacement

      190 MANITOBA ST · Mar 26, 2026 · 150 m away
    • Zoning review

      Closed

      300 MANITOBA ST · Jul 2, 2025 · 53 m away
    • Building permit

      Proposal to replace the domestic hot water piping and re-circulation headers throughout the building.

      190 MANITOBA ST · Apr 15, 2025 · 150 m away
    • Zoning review

      Closed

      300 MANITOBA ST · Apr 24, 2024 · 53 m away
    • Building permit

      Admin partywall permit in conjunction with 24 103419 BLD, 7K Brussels St.

      7 J BRUSSELS ST · Jan 12, 2024 · 265 m away
    • Building permit

      Proposal for fire damage repair to an existing SFD-townhouse.See also 23 139251 UNS.

      7 K BRUSSELS ST · Jan 12, 2024 · 259 m away
    • Building permit

      Proposed fire damage repair.

      7 K BRUSSELS ST · Dec 13, 2023 · 259 m away

    Neighbourhood: Humber Bay Shores

    About the area around the lot, not the lot itself.

    Nearest station
    Mimico GO Station18 min walk
    Nearest TTC stop
    Manitoba St at Legion Rd1 min walk
    Nearest cycling route
    Mimico Creek TrlMulti-Use Trail - Connector, 1 min walk
    Nearest traffic count
    7,957 vehicles in 8 hGardiner E / Park Lawn Rd Ramp, 100 m away, Jan 20, 2015
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
    Parks
    Grand Avenue Park1 min walk
    Trca Lands ( 71)3 min walk
    Trca Lands ( 83)3 min walk

    Schools within 1 km

    • DAVID HORNELL JR SCHOOL English Public 9 min walk
    • BEHAVIOUR INNOVATIONS, CHILDREN'S COLLEGE Private 10 min walk
    • BEHAVIOUR INNOVATIONS, CHILDREN'S COLLEGE Private 10 min walk
    • LAKESHORE LINC CENTRE English Separate 11 min walk
    • KCS SENIOR SCHOOL Private 13 min walk
    • GEORGE R GAULD JR SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHumber Bay ShoresMedian neighbourhood
    Median household income (2020)$85,000$84,500
    Households that own their home54%54%
    Population (2021)22,60516,813
    Homes built in 1960 or before5%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHumber Bay ShoresCity median
    Assault455.5636.3
    Robbery15.269.5
    Shootings3.810.5
    Auto theft186192.6
    Theft over $5,00041.846.1
    Break and enter94.9172.8
    Theft from vehicles72.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.