Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 250 Eglinton Ave E
250 Eglinton Ave E is on a 11.4 m by 33.6 m lot on Eglinton Ave E in North Toronto. The zoning is CR. A site-specific exception, 900.11.10(2497), changes some of the usual rules for this address.
The City has 12 records on this lot since 1991. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Proposed interior alterations in an existing unit to build a new ups store". Status: closed. In 2023, a building permit was filed: "Plumbing - proposal to convert a retail store into a restaurant through interior alterations". Status: closed. In 2015, a building permit was filed: "Proposal to remove interior walls and add new walls to create a tattoo studio. new lighting and hvac units are to be installed in addition to new washroom". Status: closed. Nothing on file is open right now.
Within 300 m, 25 development applications are open (the tallest up to 61 storeys). Mount Pleasant station is a 1-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(2497)Moderate
- 25 development applications open within 300 mLowFree check
- Yonge-Eglinton Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
12 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-03-20 | Zoning review26 132085 LTO | No description on file | Closed | |
| 2024-07-08 | Building permit24 172112 | Proposed interior alterations in an existing unit to build a new UPS Store | Closed | |
| 2023-06-26 | Building permit23 152295 | Plumbing - Proposal to convert a retail store into a restaurant through interior alterations. | Closed | |
| 2023-06-19 | Zoning review23 162686 LTO | No description on file | Closed | |
| 2017-03-07 | Zoning review17 125333 LTO | No description on file | Closed | |
| 2016-12-06 | Zoning review16 260521 LTO | No description on file | Closed | |
| 2016-11-03 | Building permit16 196553 | Proposal to enclose basement entrance stairs at rear of existing multiple unit building. Convenience address is 252 Eglinton Ave E. | Cancelled | |
| 2015-09-30 | Building permit15 224323 | Proposal to remove interior walls and add new walls to create a tattoo studio. New lighting and HVAC units are to be installed in addition to new washroom. | Closed | |
| 2015-01-07 | Zoning review15 101673 LTO | No description on file | Closed | |
| 2013-03-25 | Development application13 139459 STE 22 SA | Eglinton Crosstown LRT - Mount Pleasant Station | Closed | |
| 1993-05-18 | Zoning review93 025113 LTO | No description on file | Closed | |
| 1991-09-10 | Zoning review91 026879 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2497)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2497)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2497)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 5.0 (c3.0; r3.0) SS2 (x2497)
- Height limit
- 48 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 240 m²
- Back yard
- 3.3 m
- Buildings on the lot
- 2
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 25 development applications open within 300 m, up to 61 storeys
- In the Mount Pleasant station area
- 1 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
25 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
North Toronto neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mount Pleasant StationNearest station1 min walk
- Eglinton Ave East at Mt Pleasant Rd West SideNearest TTC stop1 min walk
- Broadway AveNearest cycling route5 min walk
- Eglinton Jr Public SchoolSchool1 min walk
- Toronto Stem SchoolSchool3 min walk
- Northern Secondary SchoolSchool4 min walk
- Willowdale High SchoolSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3626.8
- Robberycity median 69.553.4
- Auto theftcity median 192.668
- Theft over $5,000city median 46.124.3
- Break and entercity median 172.8174.9
- Theft from vehiclescity median 188.163.2
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist